...
Test steps
1. Config IxNetwork with switches (first with 100) with linear topology and two hosts in the first and last switch.
2. Start the controller with the features install.
3. Start the OF protocol of the switch.
4. Wait until the channel is established and Echo message interaction started.
5. Start the capture of IxNetwork.
6. Enable the traffic between this two hosts, wait until the hosts can ping through each other.
7. Stop the capture, analyse the messages captured. Write down the time of the first packet_in message T1 and the time of the last flow mod message T2. Caculate the time of Datapath seted up T=T2-T1
8. Clean the configuration of controllers and IxNetwork.
9. Repeat test step 1-8 for three times.
10. Restart the test with another number of switches.
Test Results
Datapath Setup Time
switches First (ms) Second (ms) Third (ms) Avg (ms) 100 1200 1169 1164 1178 200 1809 1745 1659 1738 300 3100 3363 3357 3273 400 5478 7171 7177 6609 500 10983 12946 10624 11518 600 30633 32603 46932 36723 700 69950 68673 58760 65794 800 131691 122576 142910 132392 After 800 switches, datapath can't setup in 5 minutes so we conclude that the maximum number is 800 switches.
- Histogram of Datapath Setup Time
As the histogram shown, the time increases significantly with the number of switches.
