Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: Published from Jenkins build: https://onos-jenkins.onlab.us/job/FUNCintent/928/

...

commit c87b23be6e0ad3d596b504dbd53eb14369140d13 ad74af804c504cb90072dd29fc880741bc363ad5 (HEAD, origin/master, origin/HEAD, master)
Author: Jian Li [pyguni@gmailSteven Burrows [sburrows@villa-technologies.com]
AuthorDate: Mon Fri Apr 24 28 15:2827:10 19 2017 +0900-0400
Commit: Jian Li Simon Hunt [pyguni@gmailsimon@onlab.comus]
CommitDate: Thu Fri Apr 27 0128 19:0257:09 31 2017 +0000
[ONOS-6349] Add CLI for querying mappings from MappingService
Topo2: Implement Link Labels

Case 1: Constructing test variables and building ONOS package - PASS

...

  • 5000.1 Testing host mobility by moving h1 from s5 to s6 - PASS (tick)
  • 5000.2 IPV4: Add host intents between h1 and h9 - PASS (tick)

Case 6000: Test Multi to Single End Point Failure - 1 NODE(S) - OF 1.0 - Using Flow Objectives -

...

PASS

  • 6000.1 Installing Multi to Single Point intents with no options set - PASS (tick)
  • 6000.2 Installing Multi to Single Point intents with partial failure allowed - FAIL (error)
    • Assertion results for IPV4 multi to single with partial failures allowed
    • Install Intent State Passed
    • Flow duration check Passed
    • Initial Intent State Passed
    • Initial Flow State Passed
    • Initial Connectivity Check Passed
    • Link Down Passed
    • Link Down Passed
    • Link Down Intent State Passed
    • Link Down Flow State Passed
    • Link Down Topology State Passed
    • Link Down Connectivity Check Passed
    • Isolation link Down Passed
    • Partial failure isolation link Down Intent State Passed
    • Partial failure isolation link Down Flow State Passed
    • Partial failure isolation link Down Topology State Passed
    • Partial failure isolation link Down Connectivity Check Passed
    • Partial failure isolation link Down Connectivity Check Passed
    • Link Up Passed
    • Link Up Passed
    • Link Up Passed
    • Link Up Intent State Passed
    • Link Up Flow State Passed
    • Link Up Topology State Passed
    • Link Up Scapy Packet Recieved Failed
    • Remove Intents Passed
  • 6000.3 NOOPTION: Install and test single point to multi point intents - PASS (tick)
  • 6000.4 NOOPTION: Install and test single point to multi point intents with partial failures allowed - PASS (tick)

Case 18: Stop Mininet and Scapy - PASS

Stopping the current mininet topology to start up fresh

  • 18.1 Stopping and Removing Scapy Host Components - PASS (tick)
  • 18.2 Stopping Mininet Topology - PASS (tick)

Case 19: Copy karaf logs - PASS

Copying the karaf logs to preserve them throughreinstalling ONOS

  • 19.1 Copying karaf logs - PASS (tick)

Case 2: Starting up 3 node(s) ONOS cluster - PASS

Set up ONOS with 3 node(s) ONOS cluster

  • 2.1 Uninstalling ONOS package - PASS (tick)
  • 2.2 Apply cell to environment - PASS (tick)
  • 2.3 Creating ONOS package - PASS (tick)
  • 2.4 Installing ONOS package - PASS (tick)
  • 2.5 Set up ONOS secure SSH - PASS (tick)
  • 2.6 Starting ONOS service - PASS (tick)
  • 2.7 Start ONOS cli - PASS (tick)

Case 10: Start Mininet topology with OF 1.0 switches - PASS

Start mininet topology with OF 1.0 switches to test intents, exits out if topology did not start correctly

  • 10.1 Starting Mininet topology with OF 1.0 switches - PASS (tick)

Case 12: Assign switches to controllers - PASS

Assign OF 1.0 switches to ONOS nodes

  • 12.1 Assigning switches to controllers - PASS (tick)

Case 13: Create scapy components - PASS

  • 13.1 Create scapy components - No Result (warning)
  • 13.2 Start scapy components - PASS (tick)

Case 15: Discover all hosts using scapy - FAIL

  • 15.1 Send packets from each host to the first host and confirm onos discovery - FAIL (error)
    • ONOS incorrectly discovered hosts
    • Skipping the rest of this case.

...

  • PASS (tick)
  • 6000.3 NOOPTION: Install and test single point to multi point intents - PASS (tick)
  • 6000.4 NOOPTION: Install and test single point to multi point intents with partial failures allowed - PASS (tick)

Case 18: Stop Mininet and Scapy - PASS

Stopping the current mininet topology to start up fresh

  • 18.1 Stopping and Removing Scapy Host Components - PASS (tick)
  • 18.2 Stopping Mininet Topology - PASS (tick)

Case 19: Copy karaf logs - PASS

Copying the karaf logs to preserve them throughreinstalling ONOS

  • 19.1 Copying karaf logs - PASS (tick)

Case 2: Starting up 3 node(s) ONOS cluster - PASS

Set up ONOS with 3 node(s) ONOS cluster

  • 2.1 Uninstalling ONOS package - PASS (tick)
  • 2.2 Apply cell to environment - PASS (tick)
  • 2.3 Creating ONOS package - PASS (tick)
  • 2.4 Installing ONOS package - PASS (tick)
  • 2.5 Set up ONOS secure SSH - PASS (tick)
  • 2.6 Starting ONOS service - PASS (tick)
  • 2.7 Start ONOS cli - PASS (tick)

Case 10: Start Mininet topology with OF 1.0 switches - PASS

Start mininet topology with OF 1.0 switches to test intents, exits out if topology did not start correctly

  • 10.1 Starting Mininet topology with OF 1.0 switches - PASS (tick)

Case 12: Assign switches to controllers - PASS

Assign OF 1.0 switches to ONOS nodes

  • 12.1 Assigning switches to controllers - PASS (tick)

Case 13: Create scapy components - PASS

  • 13.1 Create scapy components - No Result (warning)
  • 13.2 Start scapy components - PASS (tick)

Case 15: Discover all hosts using scapy - FAIL

  • 15.1 Send packets from each host to the first host and confirm onos discovery - FAIL (error)
    • ONOS incorrectly discovered hosts
    • Skipping the rest of this case.

Case 16: - FAIL

    • Skipping the rest of this case.

Case 17: - FAIL

    • Skipping the rest of this case.

Case 1000: - FAIL

    • Skipping the rest of this case.

Case 2000: - FAIL

    • Skipping the rest of this case.

Case 3000: - FAIL

    • Skipping the rest of this case.

Case 4000: - FAIL

    • Skipping the rest of this case.

Case

...

5000: - FAIL

    • Skipping the rest of this case.

Case

...

6000: - FAIL

    • Skipping the rest of this case.

Case

...

18: Stop Mininet and Scapy -

...

PASS

    • Skipping the rest of this case.

Case 3000: - FAIL

    • Skipping the rest of this case.

Case 4000: - FAIL

    • Skipping the rest of this case.

Case 5000: - FAIL

    • Skipping the rest of this case.

Case 6000: - FAIL

    • Skipping the rest of this case.

Case 18: Stop Mininet and Scapy - PASS

Stopping the current mininet topology to start up fresh

Stopping the current mininet topology to start up fresh

  • 18. 18.1 Stopping and Removing Scapy Host Components - PASS (tick)
  • 18.2 Stopping Mininet Topology - PASS (tick)

...

  • 4000.1 NOOPTION: Add multi point to single point intents - PASS (tick)
  • 4000.2 IPV4: Add multi point to single point intents - PASS (tick)
  • 4000.3 IPV4_2: Add multi point to single point intents - PASS (tick)
  • 4000.4 VLAN: Add multi point to single point intents - PASS (tick)
  • 4000.5 VLAN: Add multi point to single point intents - PASS (tick)
  • 4000.6 ENCAPSULATION: Add multi point to single point intents - PASS (tick)

Case 5000: Test host mobility with host intents - 1 NODE(S) - OF 1.3 - Using Flow Objectives - PASS

  • 5000.1 Testing host mobility by moving h1 from s5 to s6 - PASS (tick)
  • 5000.2 IPV4: Add host intents between h1 and h9 - PASS (tick)

Case 6000: Test Multi to Single End Point Failure - 1 NODE(S) - OF 1.3 - Using Flow Objectives - FAIL

  • 6000.1 Installing Multi to Single Point intents with no options set - PASS (tick)
  • 6000.2 Installing Multi to Single Point intents with partial failure allowed - FAIL (error)
    • Assertion results for IPV4 multi to single with partial failures allowed
    • Install Intent State Passed
    • Flow duration check Passed
    • Initial Intent State Passed
    • Initial Flow State Passed
    • Initial Connectivity Check Passed
    • Link Down Passed
    • Link Down Passed
    • Link Down Intent State Passed
    • Link Down Flow State Passed
    • Link Down Topology State Passed
    • Link Down Connectivity Check Passed
    • Isolation link Down Passed
    • Partial failure isolation link Down Intent State Passed
    • Partial failure isolation link Down Flow State Passed
    • Partial failure isolation link Down Topology State Passed
    • Partial failure isolation link Down Connectivity Check Passed
    • Partial failure isolation link Down Connectivity Check Failed
    • Link Up Passed
    • Link Up Passed
    • Link Up Passed
    • Link Up Intent State Passed
    • Link Up Flow State Passed
    • Link Up Topology State Passed
    • Link Up Scapy Packet Received Passed
    • Remove Intents Passed
  • 6000.3 NOOPTION: Install and test single point to multi point intents - FAIL (error)
    • Assertion results for IPV4 single to multi point intent with no options set
    • Install Intent State Passed
    • Flow duration check Passed
    • Initial Intent State Passed
    • Initial Flow State Passed
    • Initial Connectivity Check Passed
    • Link Down Passed
    • Link Down Passed
    • Link Down Intent State Passed
    • Link Down Flow State Passed
    • Link Down Topology State Passed
    • Link Down Connectivity Check Passed
    • Isolation link Down Passed
    • Isolation link Down Intent State Passed
    • Isolation link Down Flow State Passed
    • Isolation link Down Topology State Passed
    • Isolation link Down Connectivity Check Passed
    • Isolation link Down Connectivity Check Passed
    • Link Up Passed
    • Link Up Passed
    • Link Up Passed
    • Link Up Intent State Passed
    • Link Up Flow State Passed
    • Link Up Topology State Passed
    • Link Up Scapy Packet Recieved Failed
    • Remove Intents Passed
  • 6000.4 NOOPTION: Install and test single point to multi point intents with partial failures allowed - FAIL (error)
    • Assertion results for IPV4 single to multi point intent with partial failures allowed
    • Install Intent State Passed
    • Flow duration check Passed
    • Initial Intent State Passed
    • Initial Flow State Passed
    • Initial Connectivity Check Passed
    • Link Down Passed
    • Link Down Passed
    • Link Down Intent State Passed
    • Link Down Flow State Passed
    • Link Down Topology State Passed
    • Link Down Connectivity Check Passed
    • Isolation link Down Passed
    • Partial failure isolation link Down Intent State Passed
    • Partial failure isolation link Down Flow State Passed
    • Partial failure isolation link Down Topology State Passed
    • Partial failure isolation link Down Connectivity Check Passed
    • Partial failure isolation link Down Connectivity Check Failed
    • Link Up Passed
    • Link Up Passed
    • Link Up Passed
    • Link Up Intent State Passed
    • Link Up Flow State Passed
    • Link Up Topology State Passed
    • Link Up Scapy Packet Received Passed
    • Remove Intents Passed

Case 18: Stop Mininet and Scapy - PASS

Stopping the current mininet topology to start up fresh

  • 18.1 Stopping and Removing Scapy Host Components - PASS (tick)
  • 18.2 Stopping Mininet Topology - PASS (tick)

Case 19: Copy karaf logs - PASS

Copying the karaf logs to preserve them throughreinstalling ONOS

  • 19.1 Copying karaf logs - PASS (tick)

Case 2: Starting up 3 node(s) ONOS cluster - PASS

Set up ONOS with 3 node(s) ONOS cluster

  • 2.1 Uninstalling ONOS package - PASS (tick)
  • 2.2 Apply cell to environment - PASS (tick)
  • 2.3 Creating ONOS package - PASS (tick)
  • 2.4 Installing ONOS package - PASS (tick)
  • 2.5 Set up ONOS secure SSH - PASS (tick)
  • 2.6 Starting ONOS service - PASS (tick)
  • 2.7 Start ONOS cli - PASS (tick)

Case 11: Start Mininet topology with OF 1.3 switches - PASS

Start mininet topology with OF 1.3 switches to test intents, exits out if topology did not start correctly

  • 11.1 Starting Mininet topology with OF 1.3 switches - PASS (tick)

Case 12: Assign switches to controllers - PASS

Assign OF 1.3 switches to ONOS nodes

  • 12.1 Assigning switches to controllers - PASS (tick)

Case 13: Create scapy components - PASS

  • 13.1 Create scapy components - No Result (warning)
  • 13.2 Start scapy components - PASS (tick)

Case 15: Discover all hosts using scapy - FAIL

  • 15.1 Send packets from each host to the first host and confirm onos discovery - FAIL (error)
    • ONOS incorrectly discovered hosts
    • Skipping the rest of this case.

Case 16: - FAIL

    • Skipping the rest of this case.

Case 17: - FAIL

    • Skipping the rest of this case.

Case 1000: - FAIL

    • Skipping the rest of this case.

Case 2000: - FAIL

    • Skipping the rest of this case.

Case 3000: - FAIL

    • Skipping the rest of this case.

Case 4000: - FAIL

    • Skipping the rest of this case.

Case 5000: - FAIL

    • Skipping the rest of this case.

Case 6000: - FAIL

    • Skipping the rest of this case.

Case 18: Stop Mininet and Scapy - PASS

Stopping the current mininet topology to start up fresh

  • 18.1 Stopping and Removing Scapy Host Components - PASS (tick)
  • 18.2 Stopping Mininet Topology - PASS (tick)

Case 19: Copy karaf logs - PASS

Copying the karaf logs to preserve them throughreinstalling ONOS

  • point intents - PASS (tick)
  • 4000.2 IPV4: Add multi point to single point intents - PASS (tick)
  • 4000.3 IPV4_2: Add multi point to single point intents - PASS (tick)
  • 4000.4 VLAN: Add multi point to single point intents - PASS (tick)
  • 4000.5 VLAN: Add multi point to single point intents - PASS (tick)
  • 4000.6 ENCAPSULATION: Add multi point to single point intents - PASS (tick)

Case 5000: Test host mobility with host intents - 1 NODE(S) - OF 1.3 - Using Flow Objectives - PASS

  • 5000.1 Testing host mobility by moving h1 from s5 to s6 - PASS (tick)
  • 5000.2 IPV4: Add host intents between h1 and h9 - PASS (tick)

Case 6000: Test Multi to Single End Point Failure - 1 NODE(S) - OF 1.3 - Using Flow Objectives - PASS

  • 6000.1 Installing Multi to Single Point intents with no options set - PASS (tick)
  • 6000.2 Installing Multi to Single Point intents with partial failure allowed - PASS (tick)
  • 6000.3 NOOPTION: Install and test single point to multi point intents - PASS (tick)
  • 6000.4 NOOPTION: Install and test single point to multi point intents with partial failures allowed - PASS (tick)

Case 18: Stop Mininet and Scapy - PASS

Stopping the current mininet topology to start up fresh

  • 18.1 Stopping and Removing Scapy Host Components - PASS (tick)
  • 18.2 Stopping Mininet Topology - PASS (tick)

Case 19: Copy karaf logs - PASS

Copying the karaf logs to preserve them throughreinstalling ONOS

  • 19.1 Copying karaf logs - PASS (tick)

Case 2: Starting up 3 node(s) ONOS cluster - PASS

Set up ONOS with 3 node(s) ONOS cluster

  • 2.1 Uninstalling ONOS package - PASS (tick)
  • 2.2 Apply cell to environment - PASS (tick)
  • 2.3 Creating ONOS package - PASS (tick)
  • 2.4 Installing ONOS package - PASS (tick)
  • 2.5 Set up ONOS secure SSH - PASS (tick)
  • 2.6 Starting ONOS service - PASS (tick)
  • 2.7 Start ONOS cli - PASS (tick)

Case 11: Start Mininet topology with OF 1.3 switches - PASS

Start mininet topology with OF 1.3 switches to test intents, exits out if topology did not start correctly

  • 11.1 Starting Mininet topology with OF 1.3 switches - PASS (tick)

Case 12: Assign switches to controllers - PASS

Assign OF 1.3 switches to ONOS nodes

  • 12.1 Assigning switches to controllers - PASS (tick)

Case 13: Create scapy components - PASS

  • 13.1 Create scapy components - No Result (warning)
  • 13.2 Start scapy components - PASS (tick)

Case 15: Discover all hosts using scapy - PASS

  • 15.1 Send packets from each host to the first host and confirm onos discovery - PASS (tick)
  • 15.2 Populate hostsData - PASS (tick)

Case 16: Balance mastership of switches - PASS

  • 16.1 Balancing mastership of switches - PASS (tick)

Case 17: Enable intent compilation using Flow Objectives - PASS

  • 17.1 Enabling Flow Objectives 19.1 Copying karaf logs - PASS (tick)