Due to a ransomware attack, the wiki was reverted to a July 2022 version. . We apologize for the lack of a more recent valid backup.
...
HTML |
---|
<img src="https://jenkins.onosproject.org/view/QA/job/postjob-Fabric4/lastSuccessfulBuild/artifact/SRDhcprelay-stratum_master_20-builds_graph.jpg", alt="SRDhcprelay-stratum", style="width:525px;height:350px;border:0"> |
commit f06f5d676c01f33834324c4d8a796c7338d53795 babde9cbb29f55971e7f3b25b9e35d6bf85ed4c2 (HEAD -] master, origin/master, origin/HEAD)
Author: Thomas Vachuska [tom@opennetworking.orgDaniel Park [dan.mcpark84@gmail.com]
AuthorDate: Wed Tue Mar 10 149 13:2437:47 42 2021 -0800+0900
Commit: Thomas Vachuska Jian Li [tom@opennetworkingpyguni@gmail.orgcom]
CommitDate: Wed Fri Mar 10 2212 00:3048:38 18 2021 +0000
[AETHER-1212] Added means to configure host links to appear as 'wireless'
Implement Internal Routing Capability.
--
(cherry picked from commit cc8e746f203dc457e5bb914ca4995910d7fc6e9e)
Case 1: DHCP v4 tests with 4 clients attached to switch directly and 1 server attached to switch directly, with 3 ONOS instances - FAIL
...
- 1.1 Constructing test variables - PASS
- 1.2 Apply cell to environment - PASS
- 1.3 Uninstalling Atomix - PASS
- 1.4 Uninstalling ONOS package - PASS
- 1.5 Building ONOS Docker image - PASS
- 1.6 Create Cluster Config - PASS
- 1.7 Installing Atomix via docker containers - PASS
- 1.8 Installing ONOS via docker containers - PASS
- 1.9 Set up ONOS secure SSH - PASS
- 1.10 Starting ONOS CLI sessions - PASS
- 1.11 Checking ONOS nodes - PASS
- 1.12 Checking ONOS applications - PASS
- 1.13 Set logging levels - PASS
- 1.14 Set ONOS configurations - PASS
- 1.15 Stopping Starting Mininet Topology - PASS
- 1.16 Configure switches in ONOS - PASS
- 1.17 Verify host IP address assignment in ONOS - FAIL Failed to stopped mininet
- Verify ONOS host IP failed
- 1.18 Verify IP address assignment from hosts - PASS
- 1.19 Stopping Mininet - PASS
- 1.16 20 Copying karaf logs - PASS Failed to stopped mininet
Case 2: DHCP v4 tests with 4 clients attached to switch directly and 1 server attached to switch indirectly (via gateway), with 3 ONOS instances - FAIL
...
- 2.1 Apply cell to environment - PASS
- 2.2 Uninstalling Atomix - PASS
- 2.3 Uninstalling ONOS package - PASS
- 2.4 Create Cluster Config - PASS
- 2.5 Installing Atomix via docker containers - PASS
- 2.6 Installing ONOS via docker containers - PASS
- 2.7 Set up ONOS secure SSH - PASS
- 2.8 Starting ONOS CLI sessions - PASS
- 2.9 Checking ONOS nodes - PASS
- 2.10 Checking ONOS applications - PASS
- 2.11 Set logging levels - PASS
- 2.12 Set ONOS configurations - PASS
- 2.13 Starting Mininet Topology - PASS
- 2.14 Configure switches in ONOS - PASS
- 2.15 Verify host IP address assignment in ONOS - FAIL
- Verify ONOS host IP failed
- 2.16 Verify IP address assignment from hosts - FAIL
- Verify network host IP failed
- 2.17 Stopping Mininet - PASS
- 2.18 Copying karaf logs - PASS
Case 21: DHCP v4 tests with tagged hosts: 4 clients attached to switch directly and 1 server attached to switch directly, with 3 ONOS instances -
...
FAIL
- 21.1 Apply cell to environment - PASS
- 21.2 Uninstalling Atomix - PASS
- 21.3 Uninstalling ONOS package - PASS
- 21.4 Create Cluster Config - PASS
- 21.5 Installing Atomix via docker containers - PASS
- 21.6 Installing ONOS via docker containers - PASS
- 21.7 Set up ONOS secure SSH - PASS
- 21.8 Starting ONOS CLI sessions - PASS
- 21.9 Checking ONOS nodes - PASS
- 21.10 Checking ONOS applications - PASS
- 21.11 Set logging levels - PASS
- 21.12 Set ONOS configurations - PASS
- 21.13 Starting Mininet Topology - PASS
- 21.14 Configure switches in ONOS - PASS
- 21.15 Verify host IP address assignment in ONOS - PASS FAIL
- Verify ONOS host IP failed
- 21.16 Verify IP address assignment from hosts - PASS FAIL
- Verify network host IP failed
- 21.17 Stopping Mininet - PASS
- 21.18 Copying karaf logs - PASS
...
- 22.1 Apply cell to environment - PASS
- 22.2 Uninstalling Atomix - PASS
- 22.3 Uninstalling ONOS package - PASS
- 22.4 Create Cluster Config - PASS
- 22.5 Installing Atomix via docker containers - PASS
- 22.6 Installing ONOS via docker containers - PASS
- 22.7 Set up ONOS secure SSH - PASS
- 22.8 Starting ONOS CLI sessions - PASS
- 22.9 Checking ONOS nodes - PASS
- 22.10 Checking ONOS applications - PASS
- 22.11 Set logging levels - PASS
- 22.12 Set ONOS configurations - PASS
- 22.13 Starting Mininet Topology - PASS
- 22.14 Configure switches in ONOS - PASS
- 22.15 Verify host IP address assignment in ONOS - FAIL
- Verify ONOS host IP failed
- 22.16 Verify IP address assignment from hosts - FAIL
- Verify network host IP failed
- 22.17 Stopping Mininet - PASS
- 22.18 Copying karaf logs - PASS
Case 41: DHCP v4 tests with dual-homed hosts: 4 clients attached to switch directly and 1 server attached to switch directly, with 3 ONOS instances -
...
FAIL
- 41.1 Apply cell to environment - PASS
- 41.2 Uninstalling Atomix - PASS
- 41.3 Uninstalling ONOS package - PASS
- 41.4 Create Cluster Config - PASS
- 41.5 Installing Atomix via docker containers - PASS
- 41.6 Installing ONOS via docker containers - PASS
- 41.7 Set up ONOS secure SSH - PASS
- 41.8 Starting ONOS CLI sessions - PASS
- 41.9 Checking ONOS nodes - PASS
- 41.10 Checking ONOS applications - PASS
- 41.11 Set logging levels - PASS
- 41.12 Set ONOS configurations - PASS
- 41.13 Starting Mininet Topology - PASS
- 41.14 Configure switches in ONOS - PASS
- 41.15 Verify host IP address assignment in ONOS - PASS FAIL
- Verify ONOS host IP failed
- 41.16 Verify IP address assignment from hosts - PASS
- 41.17 Stopping Mininet - PASS
- 41.18 Copying karaf logs - PASS
Case 61: DHCP v4 tests with dual-homed tagged hosts: 4 clients attached to switch directly and 1 server attached to switch directly, with 3 ONOS instances -
...
FAIL
- 61.1 Apply cell to environment - PASS
- 61.2 Uninstalling Atomix - PASS
- 61.3 Uninstalling ONOS package - PASS
- 61.4 Create Cluster Config - PASS
- 61.5 Installing Atomix via docker containers - PASS
- 61.6 Installing ONOS via docker containers - PASS
- 61.7 Set up ONOS secure SSH - PASS
- 61.8 Starting ONOS CLI sessions - PASS
- 61.9 Checking ONOS nodes - PASS
- 61.10 Checking ONOS applications - PASS
- 61.11 Set logging levels - PASS
- 61.12 Set ONOS configurations - PASS
- 61.13 Starting Mininet Topology - PASS
- 61.14 Configure switches in ONOS - PASS
- 61.15 Verify host IP address assignment in ONOS - PASS FAIL
- Verify ONOS host IP failed
- 61.16 Verify IP address assignment from hosts - PASS FAIL
- Verify network host IP failed
- 61.17 Stopping Mininet - PASS
- 61.18 Copying karaf logs - PASS