Due to a ransomware attack, the wiki was reverted to a July 2022 version. . We apologize for the lack of a more recent valid backup.
...
HTML |
---|
<img src="https://jenkins.onosproject.org/view/QA/job/postjob-Fabric2/lastSuccessfulBuild/artifact/SRDhcprelay_onos-2.5_20-builds_graph.jpg", alt="SRDhcprelay", style="width:525px;height:350px;border:0"> |
commit 37691eb75be5ee295279bb3633bcefeb7166b444 86b869e1657ec09472a18e008e386b7cba82dc4f (HEAD -] onos-2.5, origin/onos-2.5)
Author: pierventre [pier@opennetworking.org]
AuthorDate: Tue Mon Apr 13 12 23:4612:10 16 2021 +0200
Commit: pierventre [pier@opennetworking.org]
CommitDate: Wed Thu Apr 14 0822 17:5541:58 07 2021 +0200
[AETHER-1529] Nodes not READY due to gui/gui2 bundles being in WAITING1516] Barefoot/bmv2 drivers are never loaded
Case 1: DHCP v4 tests with 4 clients attached to switch directly and 1 server attached to switch directly, with 3 ONOS instances - PASS
...
- 1.1 Constructing test variables - PASS
- 1.2 Apply cell to environment - PASS
- 1.3 Uninstalling Atomix - PASS
- 1.4 Uninstalling ONOS package - PASS
- 1.5 Creating ONOS package - PASS
- 1.6 Installing Atomix - PASS
- 1.7 Installing ONOS package - PASS
- 1.8 Set up ONOS secure SSH - PASS
- 1.9 Checking ONOS service - PASS
- 1.10 Starting ONOS CLI sessions - PASS
- 1.11 Checking ONOS nodes - PASS
- 1.12 Checking ONOS applications - PASS
- 1.13 Set logging levels - PASS
- 1.14 Set ONOS configurations - PASS
- 1.15 Starting Mininet Topology - PASS
- 1.16 Verify host IP address assignment in ONOS - PASS
- 1.17 Verify IP address assignment from hosts - PASS
- 1.18 Stopping Mininet - PASS
- 1.19 Copying karaf logs - PASS
Case 2: DHCP v4 tests with 4 clients attached to switch directly and 1 server attached to switch indirectly (via gateway), with 3 ONOS instances -
...
FAIL
- 2.1 Apply cell to environment - PASS
- 2.2 Uninstalling Atomix - PASS
- 2.3 Uninstalling ONOS package - PASS
- 2.4 Installing Atomix - PASS
- 2.5 Installing ONOS package - PASS
- 2.6 Set up ONOS secure SSH - PASS
- 2.7 Checking ONOS service - PASS
- 2.8 Starting ONOS CLI sessions - PASS
- 2.9 Checking ONOS nodes - PASS
- 2.10 Checking ONOS applications - PASS
- 2.11 Set logging levels - PASS
- 2.12 Set ONOS configurations - PASS
- 2.13 Starting Mininet Topology - PASS
- 2.14 Verify host IP address assignment in ONOS - PASS
- 2.15 Verify IP address assignment from hosts - PASS
- 2.16 Stopping Mininet - PASS
- 2.17 Copying karaf logs - PASS
...
- ONOS
...
- - FAIL
...
- 11.1 Apply cell to environment - PASS
- 11.2 Uninstalling Atomix - PASS
- 11.3 Uninstalling ONOS package - PASS
- 11.4 Installing Atomix - PASS
- 11.5 Installing ONOS package - PASS
- 11.6 Set up ONOS secure SSH - PASS
- 11.7 Checking ONOS service - PASS
- 11.8 Starting ONOS CLI sessions - PASS
- 11.9 Checking ONOS nodes - PASS
- 11.10 Checking ONOS applications - PASS
- 11.11 Set logging levels - PASS
- 11.12 Set ONOS configurations - PASS
- 11.13 Starting Mininet Topology - PASS
- 11.14 Verify host IP address assignment in ONOS - FAIL
- Verify ONOS host IP failed
- 11.15 Verify IP address assignment from hosts - FAIL
- Verify network host IP failed
- 11.16 Stopping Mininet - PASS 11.17 Copying karaf logs - PASS
Case 12: DHCP v6 tests with 4 clients attached to switch directly and 1 server attached to switch indirectly (via gateway), with 3 ONOS instances - FAIL
- 12.1 Apply cell to environment - PASS
- 12. 2 Uninstalling Atomix - PASS
- 12.3 Uninstalling ONOS package - PASS
- 12.4 Installing Atomix - PASS
- 12.5 Installing ONOS package - PASS
- 12.6 Set up ONOS secure SSH - PASS
- 12.7 Checking ONOS service - PASS
- 12.8 Starting ONOS CLI sessions - PASS
- 12.9 Checking ONOS nodes - PASS
- 12.10 Checking ONOS applications - PASS
- 12.11 Set logging levels - PASS
- 12.12 Set ONOS configurations - PASS
- 12.13 Starting Mininet Topology - PASS
- 12.14 Verify host IP address assignment in ONOS - FAIL
- Verify ONOS host IP failed
- 12.15 Verify IP address assignment from hosts - FAIL
- Verify network host IP failed
- 12.16 Stopping Mininet - PASS
- 12.17 Copying karaf logs - PASS
Case 21: DHCP v4 tests with tagged hosts: 4 clients attached to switch directly and 1 server attached to switch directly, with 3 ONOS instances - PASS
- 21.1 Apply cell to environment - PASS
- 21.2 Uninstalling Atomix - PASS
- 21.3 Uninstalling ONOS package - PASS
- 21.4 Installing Atomix - PASS
- 21.5 Installing ONOS package - PASS
- 21.6 Set up ONOS secure SSH - PASS
- 21.7 Checking ONOS service - PASS
- 21.8 Starting ONOS CLI sessions - PASS
- 21.9 Checking ONOS nodes - PASS
- 21.10 Checking ONOS applications - PASS
- 21.11 Set logging levels - PASS
- 21.12 Set ONOS configurations - PASS
- 21.13 Starting Mininet Topology - PASS
- 21.14 Verify host IP address assignment in ONOS - PASS
- 21.15 Verify IP address assignment from hosts - PASS
- 21.16 Stopping Mininet - PASS
- 21.17 Copying karaf logs - PASS
Case 22: DHCP v4 tests with tagged hosts: 4 clients attached to switch directly and 1 server attached to switch indirectly (via gateway), with 3 ONOS instances - PASS
- 22.1 Apply cell to environment - PASS
- 22. 2 Uninstalling Atomix - PASS
- 22.3 Uninstalling ONOS package - PASS
- 22.4 Installing Atomix - PASS
- 22.5 Installing ONOS package - PASS
- 22.6 Set up ONOS secure SSH - PASS
- 22.7 Checking ONOS service - PASS
- 22.8 Starting ONOS CLI sessions - PASS
- 22.9 Checking ONOS nodes - PASS
- 22.10 Checking ONOS applications - PASS
- 22.11 Set logging levels - PASS
- 22.12 Set ONOS configurations - PASS
- 22.13 Starting Mininet Topology - PASS
- 22.14 Verify host IP address assignment in ONOS - PASS
- 22.15 Verify IP address assignment from hosts - PASS
- 22.16 Stopping Mininet - PASS 22.17 Copying karaf logs - PASS
Case 31: DHCP v6 tests with tagged hosts: 4 clients attached to switch directly and 1 server attached to switch directly, with 3 ONOS instances - PASS
- 31.1 Apply cell to environment - PASS
- 31. 2 Uninstalling Atomix - PASS 31.3 Uninstalling ONOS package - PASS
- 31.4 Installing Atomix - PASS
- 31.5 Installing ONOS package - PASS
- 31.6 Set up ONOS secure SSH - PASS
- 31.7 Checking ONOS service - PASS
- 31.8 Starting ONOS CLI sessions - PASS
- 31.9 Checking ONOS nodes - PASS
- 31.10 Checking ONOS applications - PASS
- 31.11 Set logging levels - PASS
- 31.12 Set ONOS configurations - PASS
- 31.13 Starting Mininet Topology - PASS
- 31.14 Verify host IP address assignment in ONOS - PASS
- 31.15 Verify IP address assignment from hosts - PASS
- 31.16 Stopping Mininet - PASS
- 31.17 Copying karaf logs - PASS
Case
...
11
...
: DHCP v6 tests with
...