Due to a ransomware attack, the wiki was reverted to a July 2022 version. . We apologize for the lack of a more recent valid backup.
...
HTML |
---|
<img src="https://jenkins.onosproject.org/view/QA/job/postjob-VM/lastSuccessfulBuild/artifact/HAswapNodes_master_20-builds_graph.jpg", alt="HAswapNodes", style="width:525px;height:350px;border:0"> |
commit e458f004537c1a541d5dd2d7df7b09f1123b8f38 6219399c568cc6f665c2e232a83d2339b61b1bf9 (HEAD -] master, origin/master, origin/HEAD)
Author: Jordan Halterman [jordan@opennetworking.org]
AuthorDate: Tue Wed Sep 18 26 17:4243:05 46 2018 -0700
Commit: Ray Milkey [ray@opennetworking.org]
CommitDate: Tue Fri Sep 25 1628 03:0458:28 44 2018 +0000
Support hostname resolution for cluster configuration
--
(cherry picked from commit 97cd95d5a2a7a1bf1f3bfd3091f2d66f747eee33)
Append lock timeout to JAVA_OPTS to avoid overwrite
Case 1: Constructing test variables and building
...
ONOS package
...
- 1.1 Constructing test variables - PASS
- 1.2 Apply cell to environment - PASS
- 1.3 Uninstalling Atomix - PASS
- 1.4 Uninstalling ONOS package - PASS
- 1.5 Starting Mininet - PASS
- 1.6 Creating ONOS package - PASS
- 1.7 Installing Atomix - PASS
- 1.8 Installing ONOS package - PASS
- 1.9 Set up ONOS secure SSH - PASS
- 1.10 Checking ONOS service - PASS
- 1.11 Starting ONOS CLI sessions - PASS
- 1.12 Checking ONOS nodes - PASS
- 1.13 Checking ONOS applications - PASS
- 1.14 Checking ONOS nodes - PASS
- 1.15 Activate apps defined in the params file - No Result
- 1.16 Set ONOS configurations - PASS
- 1.17 Check app ids - PASS
- 1.18 Set logging levels - PASS
Case 2: Assigning devices to controllers - PASS
Assign switches to ONOS using 'ovs-vsctl' and check that an ONOS node becomes the master of the device.
- 2.1 Assign switches to controllers - PASS
Case 8: Compare ONOS Topology view to Mininet topology - PASS
Compare topology objects between Mininet and ONOS
- 8.1 Comparing ONOS topology to MN topology - PASS
- 8.2 Hosts view is consistent across all ONOS nodes - PASS
- 8.3 Hosts information is correct - PASS
- 8.4 Host attachment points to the network - PASS
- 8.5 Clusters view is consistent across all ONOS nodes - PASS
- 8.6 There is only one SCC - PASS
- 8.7 Device information is correct - PASS
- 8.8 Links are correct - PASS
- 8.9 Hosts are correct - PASS
- 8.10 Checking ONOS nodes - PASS
Case 21: Assigning Controller roles for switches - FAIL
Check that ONOS is connected to each device. Then manually assign mastership to specific ONOS nodes using 'device-role'
- 21.1 Assign mastership of switches to specific controllers - PASS
- 21.2 Check mastership was correctly assigned - FAIL
- Switches were not successfully reassigned
...