...
__________________________________
commit cd48bfd694249c9852d94583f74a39078e12f4cd aabee15b2923ab64ba53051a58be3029296982b8 (HEAD, origin/master, origin/HEAD, master)
Author: Madan Jampani Simon Hunt [madan@onlabsimon@onlab.us]
AuthorDate: Wed Mar 25 18:06:22 Thu Apr 2 23:14:11 2015 -0700
Commit: Gerrit Code Review [gerrit@onlabSimon Hunt [simon@onlab.us]
CommitDate: Thu Mar 26 03:08:48 2015 +0000 Apr 2 23:14:11 2015 -0700
GUI -- Fixed broken jasmine unit tests. Make sure message handling executor references are appropriately managed when we modify the service configuration
Installing ONOS package successful
...
This testcase is testing if all ONOS nodes are in topology sync with mininet
__________________________________
ONOS Topology matches MN Topology
Result: Pass
Result summary for Testcase6
This testcase is testing the addition of host intents and then does pingall
__________________________________
Ping all test after Host intent addition successful
Result: Pass
Result summary for Testcase7
This testscase is killing a link to ensure that link discovery is consistent
__________________________________
Killing a link to ensure that link discovery is consistent
Link Down discovered properly
Link up discovered properly
ONOS Topology matches MN Topology
Result: Pass
Result summary for Testcase8
This testcase removes any previously added intents before adding any new set of intents
__________________________________
Intent removal successful
Installed intents have been withdrawn correctly
Intent removal successful
Result: Pass
Result summary for Testcase9
This testcase adds point intents and then does pingall
__________________________________
Ping between h8 and h18 failed. Making attempt number 2 in 2 seconds
Ping between h8 and h18 failed. Making attempt number 3 in 2 seconds
Ping between h8 and h18 failed. Making attempt number 4 in 2 seconds
Ping between h8 and h18 failed. Making attempt number 5 in 2 seconds
All ping attempts between h8 and h18have failed
Point intents have not ben installed correctly. Cleaning up
Point intents addition and Pingall Test NOT successful
Result: Failed
Result summary for Testcase8
This testcase removes any previously added intents before adding any new set of intents
__________________________________
Intent removal successful
Installed intents have been withdrawn correctly
Intent removal successful
Result: Pass
Result summary for Testcase11
This testcase moves a host from one switch to another to addpoint intents between them and then perform ping
__________________________________
Point intents for hosts on same devicesinstalled correctly. Cleaning up
Point intents for hosts on same devicesPing Test NOT successful
Result: Failed
Result summary for Testcase8
This testcase removes any previously added intents before adding any new set of intents
__________________________________
Intent removal successful
Installed intents have been withdrawn correctly
Intent removal successful
Result: Pass
Result summary for Testcase2
This testcase is testing a switch down discovery
__________________________________
Killing a switch to ensure it is discovered correctly
Deleting s28
Result: Pass
Result summary for Testcase20
This testcase exits the mininet cli and reinstallsONOS to switch over to Packet Optical topology
_____________________________________________
Installing ONOS package successful
ONOS instance is up and ready
Result: Pass
Result summary for Testcase21
This testcase starts the packet layer topology and REST
_____________________________________________