Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: Published from Jenkins build: https://onos-jenkins.onlab.us/job/FUNCipv6Intent/56/
FUNCipv6Intent at 15 16 Jan 2016 04:58:3304

commit 6de378d2e7d8e756800466e3e4eb6de621a04090 (HEAD, origin/onos-1.4, onos-1.4)
Author: Thomas Vachuska [tom@onlab.us]
AuthorDate: Fri Jan 8 09:53:03 2016 -0800
Commit: Jonathan Hart [jono@onlab.us]
CommitDate: Mon Jan 11 19:04:26 2016 +0000

ONOS-3725 Adding ability to retain pending configs.
--
(cherry picked from commit 6f350ed200f9a00258cd155d7c91cb090ac6492a)

Case 1: Constructing test variables and building ONOS package - PASS

This test case is mainly for loading from params file, and pull and build the latest ONOS package

  • 1.1 Constructing test variables - PASS (tick)

Case 2: Starting up 1 node(s) ONOS cluster - PASS

Set up ONOS with 1 node(s) ONOS cluster

  • 2.1 Apply cell to environment - PASS (tick)
  • 2.2 Creating ONOS package - PASS (tick)
  • 2.3 Uninstalling ONOS package - PASS (tick)
  • 2.4 Installing ONOS package - PASS (tick)
  • 2.5 Starting ONOS service - PASS (tick)
  • 2.6 Start ONOS cli - PASS (tick)
  • 2.7 setup the ipv6NeighbourDiscovery - PASS (tick)

Case 11: Start Mininet topology with OF 1.3 switches - PASS

Start mininet topology with OF 1.3 switches to test intents, exits out if topology did not start correctly

  • 11.1 Starting Mininet topology with OF 1.3 switches - PASS (tick)

Case 12: Assign switches to controllers - PASS

Assign OF 1.3 switches to ONOS nodes

  • 12.1 Assigning switches to controllers - PASS (tick)

Case 2000: Point Intents Test - 1 NODE(S) - OF 1.3 - PASS

This test case will test point to point intents using 1 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet

  • 2000.1 NOOPTION: Add point intents between h1 and h9, ipv6 hosts - PASS (tick)
  • 2000.2 IPV6: Add point intents between h1 and h9 - PASS (tick)
  • 2000.3 IPV6_2: Add point intents between h1 and h9 - PASS (tick)

Case 14: Stop Mininet topology - PASS

Stopping the current mininet topology to start up fresh

  • 14.1 Stopping Mininet Topology - PASS (tick)