commit 3002cb124bd932b725afbe199dd0249a36aa15d2 52f5828004e9c59774a94542e74af7dcc18d9771 (HEAD, origin/onos-1.9, onos-1.9)
Author: sivachidambaram subramanian Ray Milkey [sisubram@partnerray@onlab.ciena.comus]
AuthorDate: Wed Mar 8 13:53:30 2017 +0530Fri Jun 23 12:46:32 2017 -0700
Commit: Thomas Vachuska Ray Milkey [tom@onlabray@onlab.us]
CommitDate: Mon Mar 13 18:19:48 2017 +0000
ONOS-6082
--
(cherry picked from commit 12c08c07dbb6ca9f54a8be7f96ac2bd6d80c709d)Fri Jun 23 12:46:32 2017 -0700
Starting snapshot 1.9.3-SNAPSHOT
Case 1: Constructing test variables and building ONOS package - PASS
...
- 17.1 Enabling Flow Objectives - PASS
Case 1000: Host Intents Test - 3 NODE(S) - OF 1.0 - Using Flow Objectives -
...
FAIL
This test case tests Host intents using 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.0 OVS running in Mininet and compile intents using Flow ObjectivesOVS running in Mininet and compile intents using Flow Objectives
- 1000.1 IPV4: Add and test host intents between h1 and h9 - FAIL
- Assertion result for IPV4 host intent with mac addresses
- Install Intent State Passed
- Flow duration check Passed
- Initial Intent State Passed
- Initial Flow State Passed
- Initial Ping Failed
- Link Down Passed
- Link Down Intent State Passed
- Link Down Flow State Passed
- Link Down Topology State Passed
- Link Down Pingall Passed
- Link Up Passed
- Link Up Intent State Passed
- Link Up Flow State Passed
- Link Up Topology State Passed
- Link Up Pingall Passed
- Remove Intents Passed
- 1000.2 DUALSTACK1: Add host intents between h3 and h11 - PASS
- 1000.3 DUALSTACK2: Add host intents between h1 and h11 - PASS
- 1000.4 1HOP: Add host intents between h1 and h3 - PASS
- 1000.5 VLAN1: Add vlan host intents between h4 and h12 - PASS
- 1000.6 Confirm that ONOS leadership is unchanged - PASS
...
- 17.1 Enabling Flow Objectives - PASS
Case 1000: Host Intents Test - 3 NODE(S) - OF 1.3 - Using Flow Objectives -
...
PASS
This test case tests Host intents using 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet and compile intents using Flow Objectives
- 1000.1 IPV4: Add and test host intents between h1 and h9 - FAIL
- Assertion result for IPV4 host intent with mac addresses Install Intent State Failed
- PASS
- 1000.2 DUALSTACK1: Add host intents between h3 and h11 - FAIL
- Assertion Result for dualstack IPV4 with MAC addresses Install Intent State Failed
- PASS
- 1000.3 DUALSTACK2: Add host intents between h1 and h11 - PASS
- 1000.4 1HOP: Add host intents between h1 and h3 - PASS
- 1000.5 VLAN1: Add vlan host intents between h4 and h12 - PASS
- 1000.6 Confirm that ONOS leadership is unchanged - PASS
...