Due to a ransomware attack, the wiki was reverted to a July 2022 version. . We apologize for the lack of a more recent valid backup.
Description
This test is described in more detail in the following links, which we refer to:
Test plan: Experiment F Plan - Flow Subsystem Burst Throughput
Test result: Master: Experiment F - Flow Subsystem Burst Throughput
The difference is that we use the IXIA tester to simulate openflow switches,and the results show below.
Test Results