Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: Published from Jenkins build: https://onos-jenkins.onlab.us/job/FUNCintentRest/671/

...

commit 49f8838bf0308970f1751f85e6402983eedc2908 7e876633c8f462d98a4cd891fcf245c78d8d3056 (HEAD, origin/master, origin/HEAD, master)
Author: Andrea Campanella [andrea@onlab.usjaegonkim [jaegon77.kim@samsung.com]
AuthorDate: Mon Wed Jan 30 1025 06:3701:32 49 2017 -0800+0900
Commit: Andrea Campanella Ray Milkey [andrea@onlabray@onlab.us]
CommitDate: Tue Jan 31 17:42:53 2017 -0800
ONOS-5894 GUI refactoring of faultmanagement appFri Feb 3 02:01:49 2017 +0000

[ONOS-5903] Intents always installs first path. Traffic path load is not distributed.

Case 1: Constructing test variables and building ONOS package - PASS

...

  • 13.1 Create scapy components - No Result (warning)
  • 13.2 Start scapy components - PASS (tick)

Case 15: Discover all hosts using scapy -

...

PASS

  • 15.1 Send packets from each host to the first host and confirm onos discovery - FAIL (error)
  • ONOS incorrectly discovered hosts
  • PASS (tick)
  • 15.2 Populate hostsData - PASS (tick)
  • Skipping the rest of this case.

Case 16: Balance mastership of switches -

...

PASS

  • 16.1 Balancing mastership of switches - PASS (tick)
  • Skipping the rest of this case.

Case 1000:

...

Host Intents Test - 3 NODE(S) - OF 1.0 - Using Flow Rules - PASS

This test case tests Host intents using 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.0 OVS running in Mininet and compile intents using Flow Rules

  • 1000.1 IPV4: Add and test host intents between h1 and h9 - PASS (tick)
  • 1000.2 DUALSTACK1: Add host intents between h3 and h11 - PASS (tick)
  • 1000.3 DUALSTACK2: Add host intents between h1 and h11 - PASS (tick)
  • 1000.4 1HOP: Add host intents between h1 and h3 - PASS (tick)
  • 1000.5 VLAN1: Add vlan host intents between h4 and h12 - PASS (tick)
  • 1000.6 Confirm that ONOS leadership is unchanged - PASS (tick)

Case 2000: Point Intents Test - 3 NODE(S) - OF 1.0 - Using Flow Rules - PASS

This test case will test point to point intents using 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.0 OVS running in Mininet and compile intents using Flow Rules

  • 2000.1 NOOPTION: Add point intents between h1 and h9 - PASS (tick)
  • 2000.2 IPV4: Add point intents between h1 and h9 - PASS (tick)
  • 2000.3 IPV4_2: Add point intents between h1 and h9 - PASS (tick)
  • 2000.4 SDNIP-ICMP: Add point intents between h1 and h9 - PASS (tick)
  • 2000.5 SDNIP-TCP: Add point intents between h1 and h9 - PASS (tick)
  • 2000.6 DUALSTACK1: Add point intents between h3 and h11 - PASS (tick)
  • 2000.7 VLAN: Add point intents between h5 and h21 - PASS (tick)
  • 2000.8 1HOP: Add point intents between h1 and h3 - PASS (tick)

Case 3000: Single to Multi Point Intents Test - 3 NODE(S) - OF 1.0 - Using Flow Rules - PASS

This test case will test single point to multi point intents using 3

    • Skipping the rest of this case.

Case 2000: - FAIL

    • Skipping the rest of this case.

Case 3000: - FAIL

    • Skipping the rest of this case.

Case 5000: - FAIL

    • Skipping the rest of this case.

Case 18: Stop Mininet and Scapy - FAIL

Stopping the current mininet topology to start up fresh

  • 18.1 Stopping and Removing Scapy Host Components - PASS (tick)
  • 18.2 Stopping Mininet Topology - FAIL (error)
    • Failed to stop mininet

Case 19: Copy karaf logs - PASS

Copying the karaf logs to preserve them throughreinstalling ONOS

  • 19.1 Copying karaf logs - PASS (tick)

Case 2: Starting up 1 node(s) ONOS cluster - PASS

Set up ONOS with 1 node(s) ONOS cluster

  • 2.1 Uninstalling ONOS package - PASS (tick)
  • 2.2 Apply cell to environment - PASS (tick)
  • 2.3 Creating ONOS package - PASS (tick)
  • 2.4 Installing ONOS package - PASS (tick)
  • 2.5 Set up ONOS secure SSH - PASS (tick)
  • 2.6 Starting ONOS service - PASS (tick)
  • 2.7 Start ONOS cli - PASS (tick)

Case 10: Start Mininet topology with OF 1.0 switches - PASS

Start mininet topology with OF 1.0 switches to test intents, exits out if topology did not start correctly

  • 10.1 Starting Mininet topology with OF 1.0 switches - PASS (tick)

Case 12: Assign switches to controllers - PASS

Assign OF 1.0 switches to ONOS nodes

  • 12.1 Assigning switches to controllers - PASS (tick)

Case 13: Create scapy components - PASS

  • 13.1 Create scapy components - No Result (warning)
  • 13.2 Start scapy components - PASS (tick)

Case 15: Discover all hosts using scapy - PASS

  • 15.1 Send packets from each host to the first host and confirm onos discovery - PASS (tick)
  • 15.2 Populate hostsData - PASS (tick)

Case 16: Balance mastership of switches - PASS

  • 16.1 Balancing mastership of switches - PASS (tick)

Case 17: Enable intent compilation using Flow Objectives - PASS

  • 17.1 Enabling Flow Objectives - PASS (tick)

Case 1000: Host Intents Test - 1 NODE(S) - OF 1.0 - Using Flow Objectives - PASS

This test case tests Host intents using 1 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.0 OVS running in Mininet and compile intents using Flow ObjectivesRules

  • 1000 3000.1 IPV4NOOPTION: Add Install and test host intents between h1 and h9 single point to multi point intents - PASS (tick) 1000
  • 3000.2 DUALSTACK1: Add host intents between h3 and h11 IPV4: Install and test single point to multi point intents - PASS (tick) 1000
  • 3000.3 DUALSTACK2IPV4_2: Add host intents between h1 and h11 single point to multi point intents - PASS (tick) 1000
  • 3000.4 1HOPVLAN: Add host intents between h1 and h3 single point to multi point intents - PASS (tick) 1000
  • 3000.5 VLAN1VLAN: Add vlan host intents between h4 and h12 - PASS (tick) 1000.6 Confirm that ONOS leadership is unchanged single point to multi point intents - PASS (tick)

Case

...

5000:

...

Test host mobility with host intents -

...

PASS

  • 5000.1 Testing host mobility by moving h1 from s5 to s6 - PASS (tick)
  • 5000.2 IPV4: Add host

This test case will test point to point intents using 1 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.0 OVS running in Mininet and compile intents using Flow Objectives

  • 2000.1 NOOPTION: Add point intents between h1 and h9 - PASS (tick)
  • 2000.2 IPV4: Add point intents between h1 and h9 - PASS (tick)

Case 18: Stop Mininet and Scapy - PASS

Stopping the current mininet topology to start up fresh

  • 18.1 Stopping and Removing Scapy Host Components 2000.3 IPV4_2: Add point intents between h1 and h9 - PASS (tick)
  • 2000.4 SDNIP-ICMP: Add point intents between h1 and h9 - PASS (tick)
  • 2000.5 SDNIP-TCP: Add point intents between h1 and h9 - PASS (tick)
  • 2000.6 DUALSTACK1: Add point intents between h3 and h11 - PASS (tick)
  • 2000.7 VLAN: Add point intents between h5 and h21 - PASS (tick)
  • 2000.8 1HOP: Add point intents between h1 and h3 - PASS (tick)

Case 3000: Single to Multi Point Intents Test - 1 NODE(S) - OF 1.0 - Using Flow Objectives - PASS

This test case will test single point to multi point intents using 1 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.0 OVS running in Mininet and compile intents using Flow Objectives

  • 3000.1 NOOPTION: Install and test single point to multi point intents - PASS (tick)
  • 3000.2 IPV4: Install and test single point to multi point intents - PASS (tick)
  • 3000.3 IPV4_2: Add single point to multi point intents - PASS (tick)
  • 3000.4 VLAN: Add single point to multi point intents - PASS (tick)
  • 3000.5 VLAN: Add single point to multi point intents - PASS (tick)

Case 5000: Test host mobility with host intents - PASS

  • 5000.1 Testing host mobility by moving h1 from s5 to s6 - PASS (tick)
  • 5000.2 IPV4: Add host intents between h1 and h9 - PASS (tick)

Case 18: Stop Mininet and Scapy - PASS

Stopping the current mininet topology to start up fresh

  • 18.1 Stopping and Removing Scapy Host Components - PASS (tick)
  • 18.2 Stopping Mininet Topology - PASS (tick)

Case 19: Copy karaf logs - PASS

Copying the karaf logs to preserve them throughreinstalling ONOS

  • 19.1 Copying karaf logs - PASS (tick)

Case 2: Starting up 3 node(s) ONOS cluster - PASS

Set up ONOS with 3 node(s) ONOS cluster

  • 2.1 Uninstalling ONOS package - PASS (tick)
  • 2.2 Apply cell to environment - PASS (tick)
  • 2.3 Creating ONOS package - PASS (tick)
  • 2.4 Installing ONOS package - PASS (tick)
  • 2.5 Set up ONOS secure SSH - PASS (tick)
  • 2.6 Starting ONOS service - PASS (tick)
  • 2.7 Start ONOS cli - PASS (tick)

Case 10: Start Mininet topology with OF 1.0 switches - PASS

Start mininet topology with OF 1.0 switches to test intents, exits out if topology did not start correctly

  • 10.1 Starting Mininet topology with OF 1.0 switches - PASS (tick)

Case 12: Assign switches to controllers - PASS

Assign OF 1.0 switches to ONOS nodes

  • 12.1 Assigning switches to controllers - PASS (tick)

Case 13: Create scapy components - PASS

  • 13.1 Create scapy components - No Result (warning)
  • 13.2 Start scapy components - PASS (tick)

Case 15: Discover all hosts using scapy - PASS

  • 15.1 Send packets from each host to the first host and confirm onos discovery - PASS (tick)
  • 15.2 Populate hostsData - PASS (tick)

Case 16: Balance mastership of switches - PASS

  • 16.1 Balancing mastership of switches - PASS (tick)

Case 17: Enable intent compilation using Flow Objectives - PASS

  • 17.1 Enabling Flow Objectives - PASS (tick)

...

  • 18.2 Stopping Mininet Topology - PASS (tick)

Case 19: Copy karaf logs - PASS

Copying the karaf logs to preserve them throughreinstalling ONOS

  • 19.1 Copying karaf logs - PASS (tick)

Case 2: Starting up 1 node(s) ONOS cluster - PASS

Set up ONOS with 1 node(s) ONOS cluster

  • 2.1 Uninstalling ONOS package - PASS (tick)
  • 2.2 Apply cell to environment - PASS (tick)
  • 2.3 Creating ONOS package - PASS (tick)
  • 2.4 Installing ONOS package - PASS (tick)
  • 2.5 Set up ONOS secure SSH - PASS (tick)
  • 2.6 Starting ONOS service - PASS (tick)
  • 2.7 Start ONOS cli - PASS (tick)

Case 10: Start Mininet topology with OF 1.0 switches - PASS

Start mininet topology with OF 1.0 switches to test intents, exits out if topology did not start correctly

  • 10.1 Starting Mininet topology with OF 1.0 switches - PASS (tick)

Case 12: Assign switches to controllers - PASS

Assign OF 1.0 switches to ONOS nodes

  • 12.1 Assigning switches to controllers - PASS (tick)

Case 13: Create scapy components - PASS

  • 13.1 Create scapy components - No Result (warning)
  • 13.2 Start scapy components - PASS (tick)

Case 15: Discover all hosts using scapy - PASS

  • 15.1 Send packets from each host to the first host and confirm onos discovery - PASS (tick)
  • 15.2 Populate hostsData - PASS (tick)

Case 16: Balance mastership of switches - PASS

  • 16.1 Balancing mastership of switches - PASS (tick)

Case 17: Enable intent compilation using Flow Objectives - PASS

  • 17.1 Enabling Flow Objectives - PASS (tick)

Case 1000: Host Intents Test - 1 NODE(S) - OF 1.0 - Using Flow Objectives - PASS

This test case tests Host intents using 1 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.0 OVS running in Mininet and compile intents using Flow Objectives

  • 1000.1 IPV4: Add and test host intents between h1 and h9 - PASS (tick)
  • 1000.2 DUALSTACK1: Add host intents between h3 and h11 - PASS (tick)
  • 1000.3 DUALSTACK2: Add host intents between h1 and h11 - PASS (tick)
  • 1000.4 1HOP: Add host intents between h1 and h3 - PASS (tick)
  • 1000.5 VLAN1: Add vlan host intents between h4 and h12 - PASS (tick)
  • 1000.6 Confirm that ONOS leadership is unchanged - PASS (tick)

Case 2000: Point Intents Test - 1 NODE(S) - OF 1.0 - Using Flow Objectives - PASS

This test case will test point to point intents using 1 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.0 OVS running in Mininet and compile intents using Flow Objectives

  • 2000.1 NOOPTION: Add point intents between h1 and h9 - PASS (tick)
  • 2000.2 IPV4: Add point intents between h1 and h9 - PASS (tick)
  • 2000.3 IPV4_2: Add point intents between h1 and h9 - PASS (tick)
  • 2000.4 SDNIP-ICMP: Add point intents between h1 and h9 - PASS (tick)
  • 2000.5 SDNIP-TCP: Add point intents between h1 and h9 - PASS (tick)
  • 2000.6 DUALSTACK1: Add point intents between h3 and h11 - PASS (tick)
  • 2000.7 VLAN: Add point intents between h5 and h21 - PASS (tick)
  • 2000.8 1HOP: Add point intents between h1 and h3 - PASS (tick)

Case 3000: Single to Multi Point Intents Test - 1 NODE(S) - OF 1.0 - Using Flow Objectives - PASS

This test case tests Host will test single point to multi point intents using 3 1 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.0 OVS running in Mininet and compile intents using Flow Objectives

  • 1000 3000.1 IPV4NOOPTION: Add Install and test host intents between h1 and h9 single point to multi point intents - PASS (tick) 1000
  • 3000.2 DUALSTACK1: Add host intents between h3 and h11 IPV4: Install and test single point to multi point intents - PASS (tick) 1000
  • 3000.3 DUALSTACK2IPV4_2: Add host intents between h1 and h11 single point to multi point intents - PASS (tick) 1000
  • 3000.4 1HOPVLAN: Add host intents between h1 and h3 single point to multi point intents - PASS (tick) 1000
  • 3000.5 VLAN1VLAN: Add vlan host intents between h4 and h12 - PASS (tick) 1000.6 Confirm that ONOS leadership is unchanged single point to multi point intents - PASS (tick)

Case

...

5000:

...

Test

...

host mobility with host intents - PASS

  • 5000.1 Testing host mobility by moving h1 from s5 to s6 - PASS (tick)
  • 5000.2 IPV4: Add host

This test case will test point to point intents using 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.0 OVS running in Mininet and compile intents using Flow Objectives

  • 2000.1 NOOPTION: Add point intents between h1 and h9 - PASS (tick)
  • 2000.2 IPV4: Add point intents between h1 and h9 - PASS (tick)

Case 18: Stop Mininet and Scapy - PASS

Stopping the current mininet topology to start up fresh

  • 18.1 Stopping and Removing Scapy Host Components 2000.3 IPV4_2: Add point intents between h1 and h9 - PASS (tick)
  • 2000.4 SDNIP-ICMP: Add point intents between h1 and h9 - PASS (tick)
  • 2000.5 SDNIP-TCP: Add point intents between h1 and h9 - PASS (tick)
  • 2000.6 DUALSTACK1: Add point intents between h3 and h11 - PASS (tick)
  • 2000.7 VLAN: Add point intents between h5 and h21 - PASS (tick)
  • 2000.8 1HOP: Add point intents between h1 and h3 - PASS (tick)

Case 3000: Single to Multi Point Intents Test - 3 NODE(S) - OF 1.0 - Using Flow Objectives - PASS

This test case will test single point to multi point intents using 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.0 OVS running in Mininet and compile intents using Flow Objectives

  • 3000.1 NOOPTION: Install and test single point to multi point intents - PASS (tick)
  • 3000.2 IPV4: Install and test single point to multi point intents - PASS (tick)
  • 3000.3 IPV4_2: Add single point to multi point intents - PASS (tick)
  • 3000.4 VLAN: Add single point to multi point intents - PASS (tick)
  • 3000.5 VLAN: Add single point to multi point intents - PASS (tick)

Case 5000: Test host mobility with host intents - PASS

  • 5000.1 Testing host mobility by moving h1 from s5 to s6 - PASS (tick)
  • 5000.2 IPV4: Add host intents between h1 and h9 - PASS (tick)

Case 18: Stop Mininet and Scapy - PASS

Stopping the current mininet topology to start up fresh

  • 18.1 Stopping and Removing Scapy Host Components - PASS (tick)
  • 18.2 Stopping Mininet Topology - PASS (tick)

Case 19: Copy karaf logs - PASS

Copying the karaf logs to preserve them throughreinstalling ONOS

  • 19.1 Copying karaf logs - PASS (tick)

Case 2: Starting up 1 node(s) ONOS cluster - PASS

Set up ONOS with 1 node(s) ONOS cluster

  • 2.1 Uninstalling ONOS package - PASS (tick)
  • 2.2 Apply cell to environment - PASS (tick)
  • 2.3 Creating ONOS package - PASS (tick)
  • 2.4 Installing ONOS package - PASS (tick)
  • 2.5 Set up ONOS secure SSH - PASS (tick)
  • 2.6 Starting ONOS service - PASS (tick)
  • 2.7 Start ONOS cli - PASS (tick)

Case 11: Start Mininet topology with OF 1.3 switches - PASS

Start mininet topology with OF 1.3 switches to test intents, exits out if topology did not start correctly

  • 11.1 Starting Mininet topology with OF 1.3 switches - PASS (tick)

Case 12: Assign switches to controllers - PASS

Assign OF 1.3 switches to ONOS nodes

  • 12.1 Assigning switches to controllers - PASS (tick)

Case 13: Create scapy components - PASS

  • 13.1 Create scapy components - No Result (warning)
  • 13.2 Start scapy components - PASS (tick)

Case 15: Discover all hosts using scapy - PASS

  • 15.1 Send packets from each host to the first host and confirm onos discovery - PASS (tick)
  • 15.2 Populate hostsData - PASS (tick)

Case 16: Balance mastership of switches - PASS

  • 16.1 Balancing mastership of switches - PASS (tick)

...

  • 18.2 Stopping Mininet Topology - PASS (tick)

Case 19: Copy karaf logs - PASS

Copying the karaf logs to preserve them throughreinstalling ONOS

  • 19.1 Copying karaf logs - PASS (tick)

Case 2: Starting up 3 node(s) ONOS cluster - PASS

Set up ONOS with 3 node(s) ONOS cluster

  • 2.1 Uninstalling ONOS package - PASS (tick)
  • 2.2 Apply cell to environment - PASS (tick)
  • 2.3 Creating ONOS package - PASS (tick)
  • 2.4 Installing ONOS package - PASS (tick)
  • 2.5 Set up ONOS secure SSH - PASS (tick)
  • 2.6 Starting ONOS service - PASS (tick)
  • 2.7 Start ONOS cli - PASS (tick)

Case 10: Start Mininet topology with OF 1.0 switches - PASS

Start mininet topology with OF 1.0 switches to test intents, exits out if topology did not start correctly

  • 10.1 Starting Mininet topology with OF 1.0 switches - PASS (tick)

Case 12: Assign switches to controllers - PASS

Assign OF 1.0 switches to ONOS nodes

  • 12.1 Assigning switches to controllers - PASS (tick)

Case 13: Create scapy components - PASS

  • 13.1 Create scapy components - No Result (warning)
  • 13.2 Start scapy components - PASS (tick)

Case 15: Discover all hosts using scapy - PASS

  • 15.1 Send packets from each host to the first host and confirm onos discovery - PASS (tick)
  • 15.2 Populate hostsData - PASS (tick)

Case 16: Balance mastership of switches - PASS

  • 16.1 Balancing mastership of switches - PASS (tick)

Case 17: Enable intent compilation using Flow Objectives - PASS

  • 17.1 Enabling Flow Objectives - PASS (tick)

Case 1000: Host Intents Test - 3 NODE(S) - OF 1.0 - Using Flow Objectives - PASS

This test case tests Host intents using 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.0 OVS running in Mininet and compile intents using Flow Objectives

  • 1000.1 IPV4: Add and test host intents between h1 and h9 - PASS (tick)
  • 1000.2 DUALSTACK1: Add host intents between h3 and h11 - PASS (tick)
  • 1000.3 DUALSTACK2: Add host intents between h1 and h11 - PASS (tick)
  • 1000.4 1HOP: Add host intents between h1 and h3 - PASS (tick)
  • 1000.5 VLAN1: Add vlan host intents between h4 and h12 - PASS (tick)
  • 1000.6 Confirm that ONOS leadership is unchanged - PASS (tick)

Case 2000: Point Intents Test - 3 NODE(S) - OF 1.

...

0 - Using Flow

...

Objectives - PASS

This test case tests Host will test point to point intents using 1 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 0 OVS running in Mininet and compile intents using Flow RulesObjectives

  • 1000 2000.1 IPV4NOOPTION: Add and test host point intents between h1 and h9 - PASS (tick)
  • 1000 2000.2 DUALSTACK1IPV4: Add host point intents between h3 h1 and h11 h9 - PASS (tick) 1000
  • 2000.3 DUALSTACK2IPV4_2: Add host point intents between h1 and h11 h9 - PASS (tick)
  • 1000 2000.4 1HOPSDNIP-ICMP: Add host point intents between h1 and h3 h9 - PASS (tick)
  • 1000 2000.5 VLAN1SDNIP-TCP: Add vlan host point intents between h4 h1 and h12 h9 - PASS (tick)
  • 1000.6 Confirm that ONOS leadership is unchanged 2000.6 DUALSTACK1: Add point intents between h3 and h11 - PASS (tick)

...

  • 2000.7 VLAN: Add point intents between h5 and h21 - PASS (tick)
  • 2000.8 1HOP: Add point intents between h1 and h3 - PASS (tick)

Case 3000: Single to Multi Point Intents Test -

...

3 NODE(S) - OF 1.

...

0 - Using Flow

...

Objectives - PASS

This test case will test single point to multi point intents using 1 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 0 OVS running in Mininet and compile intents using Flow RulesObjectives

  • 2000 3000.1 NOOPTION: Add Install and test single point to multi point intents between h1 and h9 - PASS (tick) 2000
  • 3000.2 IPV4: Add Install and test single point to multi point intents between h1 and h9 - PASS (tick)
  • 2000 3000.3 IPV4_2: Add single point intents between h1 and h9 - to multi point intents - PASS (tick) 2000
  • 3000.4 SDNIP-ICMPVLAN: Add single point to multi point intents between h1 and h9 - PASS (tick) 2000
  • 3000.5 SDNIP-TCPVLAN: Add single point intents between h1 and h9 to multi point intents - PASS (tick)
  • 2000.6 DUALSTACK1: Add point intents between h3 and h11 - PASS (tick)

Case 5000: Test host mobility with host intents - PASS

  • 5000.1 Testing host mobility by moving h1 from s5 to s6 2000.7 VLAN: Add point intents between h5 and h21 - PASS (tick)
  • 2000 5000.8 1HOP2 IPV4: Add point host intents between h1 and h3 h9 - PASS (tick)

Case

...

18: Stop Mininet and Scapy - PASS

Stopping the current mininet topology to start up fresh

  • 18.1 Stopping and Removing Scapy Host Components - PASS (tick)
  • 18.2 Stopping Mininet Topology - PASS (tick)

Case 19: Copy karaf logs - PASS

Copying the karaf logs to preserve them throughreinstalling ONOS

  • 19.1 Copying karaf logs - PASS (tick)

Case 2: Starting up 1 node(s) ONOS cluster - PASS

Set up ONOS with 1 node(s) ONOS cluster

  • 2.1 Uninstalling ONOS package - PASS (tick)
  • 2.2 Apply cell to environment - PASS (tick)
  • 2.3 Creating ONOS package - PASS (tick)
  • 2.4 Installing ONOS package - PASS (tick)
  • 2.5 Set up ONOS secure SSH - PASS (tick)
  • 2.6 Starting ONOS service - PASS (tick)
  • 2.7 Start ONOS cli - PASS (tick)

Case 11: Start Mininet topology with OF 1.3 switches - PASS

Start mininet topology with OF 1.3 switches to test intents, exits out if topology did not start correctly

  • 11.1 Starting Mininet topology with OF 1.3 switches - PASS (tick)

Case 12: Assign switches to controllers - PASS

Assign OF 1.3 switches to ONOS nodes

  • 12.1 Assigning switches to controllers - PASS (tick)

Case 13: Create scapy components - PASS

  • 13.1 Create scapy components - No Result (warning)
  • 13.2 Start scapy components - PASS (tick)

Case 15: Discover all hosts using scapy - PASS

  • 15.1 Send packets from each host to the first host and confirm onos discovery - PASS (tick)
  • 15.2 Populate hostsData - PASS (tick)

Case 16: Balance mastership of switches - PASS

  • 16.1 Balancing mastership of switches - PASS (tick)

Case 1000: Host Intents Test - 1 NODE(S) - OF 1.3 - Using Flow Rules - PASS

This test case tests Host intents using 1 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet and compile intents using Flow Rules

  • 1000.1 IPV4: Add and test host intents between h1 and h9 - PASS (tick)
  • 1000.2 DUALSTACK1: Add host intents between h3 and h11 - PASS (tick)
  • 1000.3 DUALSTACK2: Add host intents between h1 and h11 - PASS (tick)
  • 1000.4 1HOP: Add host intents between h1 and h3 - PASS (tick)
  • 1000.5 VLAN1: Add vlan host intents between h4 and h12 - PASS (tick)
  • 1000.6 Confirm that ONOS leadership is unchanged - PASS (tick)

Case 2000: Point Intents Test - 1

This test case will test single point to multi point intents using 1 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet and compile intents using Flow Rules

  • 3000.1 NOOPTION: Install and test single point to multi point intents - PASS (tick)
  • 3000.2 IPV4: Install and test single point to multi point intents - PASS (tick)
  • 3000.3 IPV4_2: Add single point to multi point intents - PASS (tick)
  • 3000.4 VLAN: Add single point to multi point intents - PASS (tick)
  • 3000.5 VLAN: Add single point to multi point intents - PASS (tick)

Case 5000: Test host mobility with host intents - PASS

  • 5000.1 Testing host mobility by moving h1 from s5 to s6 - PASS (tick)
  • 5000.2 IPV4: Add host intents between h1 and h9 - PASS (tick)

Case 18: Stop Mininet and Scapy - PASS

Stopping the current mininet topology to start up fresh

  • 18.1 Stopping and Removing Scapy Host Components - PASS (tick)
  • 18.2 Stopping Mininet Topology - PASS (tick)

Case 19: Copy karaf logs - PASS

Copying the karaf logs to preserve them throughreinstalling ONOS

  • 19.1 Copying karaf logs - PASS (tick)

Case 2: Starting up 3 node(s) ONOS cluster - PASS

Set up ONOS with 3 node(s) ONOS cluster

  • 2.1 Uninstalling ONOS package - PASS (tick)
  • 2.2 Apply cell to environment - PASS (tick)
  • 2.3 Creating ONOS package - PASS (tick)
  • 2.4 Installing ONOS package - PASS (tick)
  • 2.5 Set up ONOS secure SSH - PASS (tick)
  • 2.6 Starting ONOS service - PASS (tick)
  • 2.7 Start ONOS cli - PASS (tick)

Case 11: Start Mininet topology with OF 1.3 switches - PASS

Start mininet topology with OF 1.3 switches to test intents, exits out if topology did not start correctly

  • 11.1 Starting Mininet topology with OF 1.3 switches - PASS (tick)

Case 12: Assign switches to controllers - PASS

Assign OF 1.3 switches to ONOS nodes

  • 12.1 Assigning switches to controllers - PASS (tick)

Case 13: Create scapy components - PASS

  • 13.1 Create scapy components - No Result (warning)
  • 13.2 Start scapy components - PASS (tick)

Case 15: Discover all hosts using scapy - PASS

  • 15.1 Send packets from each host to the first host and confirm onos discovery - PASS (tick)
  • 15.2 Populate hostsData - PASS (tick)

Case 16: Balance mastership of switches - PASS

  • 16.1 Balancing mastership of switches - PASS (tick)

...

NODE(S) - OF 1.3 - Using Flow Rules - PASS

This test case tests Host will test point to point intents using 3 1 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet and compile intents using Flow Rules

  • 1000 2000.1 IPV4NOOPTION: Add and test host point intents between h1 and h9 - PASS (tick)
  • 1000 2000.2 DUALSTACK1IPV4: Add host point intents between h3 h1 and h11 h9 - PASS (tick) 1000
  • 2000.3 DUALSTACK2IPV4_2: Add host point intents between h1 and h11 h9 - PASS (tick)
  • 1000 2000.4 1HOPSDNIP-ICMP: Add host point intents between h1 and h3 h9 - PASS (tick)
  • 1000 2000.5 VLAN1SDNIP-TCP: Add vlan host point intents between h4 h1 and h12 h9 - PASS (tick)
  • 1000.6 Confirm that ONOS leadership is unchanged 2000.6 DUALSTACK1: Add point intents between h3 and h11 - PASS (tick)

...

  • 2000

...

  • .7 VLAN: Add point intents between h5 and h21 - PASS (tick)
  • 2000.8 1HOP: Add point intents between h1 and h3 - PASS (tick)

Case 3000: Single to Multi Point Intents Test - 1 NODE(S) - OF 1.3 - Using Flow Rules - PASS

This test case will test single point to multi point intents using 3 1 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet and compile intents using Flow Rules

  • 2000 3000.1 NOOPTION: Add Install and test single point to multi point intents between h1 and h9 - PASS (tick) 2000
  • 3000.2 IPV4: Add Install and test single point to multi point intents between h1 and h9 - PASS (tick)
  • 2000 3000.3 IPV4_2: Add single point to multi point intents between h1 and h9 - PASS (tick) 2000
  • 3000.4 SDNIP-ICMPVLAN: Add single point to multi point intents between h1 and h9 - PASS (tick) 2000
  • 3000.5 SDNIP-TCPVLAN: Add single point intents between h1 and h9 to multi point intents - PASS (tick)
  • 2000.6 DUALSTACK1: Add point intents between h3 and h11 - PASS (tick)

Case 5000: Test host mobility with host intents - PASS

  • 5000.1 Testing host mobility by moving h1 from s5 to s6 2000.7 VLAN: Add point intents between h5 and h21 - PASS (tick)
  • 2000 5000.8 1HOP2 IPV4: Add point host intents between h1 and h3 h9 - PASS (tick)

Case

...

18: Stop Mininet and Scapy - PASS

Stopping the current mininet topology to start up fresh

  • 18.1 Stopping and Removing Scapy Host Components - PASS (tick)
  • 18.2 Stopping Mininet Topology - PASS (tick)

Case 19: Copy karaf logs - PASS

Copying the karaf logs to preserve them throughreinstalling ONOS

  • 19.1 Copying karaf logs - PASS (tick)

Case 2: Starting up 3 node(s)

...

ONOS cluster - PASS

Set up ONOS with 3 node(s) ONOS cluster

  • 2.1 Uninstalling ONOS package 3000.1 NOOPTION: Install and test single point to multi point intents - PASS (tick) 3000
  • 2.2 IPV4: Install and test single point to multi point intents Apply cell to environment - PASS (tick) 3000
  • 2.3 IPV4_2: Add single point to multi point intents Creating ONOS package - PASS (tick)
  • 2.4 Installing ONOS package - PASS (tick)
  • 2.5 Set up ONOS secure SSH - PASS (tick)
  • 3000.4 VLAN: Add single point to multi point intents 2.6 Starting ONOS service - PASS (tick) 3000.5 VLAN: Add single point to multi point intents
  • 2.7 Start ONOS cli - PASS (tick)

Case

...

11: Start Mininet topology with OF 1.3 switches - PASS

Start mininet topology with OF 1.3 switches to test intents, exits out if topology did not start correctly

  • 11.1 Starting Mininet topology with OF 1.3 switches
  • 5000.1 Testing host mobility by moving h1 from s5 to s6 - PASS (tick)
  • 5000.2 IPV4: Add host intents between h1 and h9 - PASS (tick)

Case

...

12: Assign switches to controllers - PASS

Stopping the current mininet topology to start up fresh

Assign OF 1.3 switches to ONOS nodes

  • 12.1 Assigning switches to controllers - PASS (tick)

Case 13: Create scapy components - PASS

  • 13.1 Create scapy components - No Result (warning)
  • 13.2 Start scapy components
  • 18.1 Stopping and Removing Scapy Host Components - PASS (tick)
  • 18.2 Stopping Mininet Topology - PASS (tick)

Case

...

15: Discover all hosts using scapy - PASS

Copying the karaf logs to preserve them throughreinstalling ONOS

  • 15.1 Send packets from each host to the first host and confirm onos discovery - PASS (tick)
  • 15.2 Populate hostsData 19.1 Copying karaf logs - PASS (tick)

Case

...

Set up ONOS with 1 node(s) ONOS cluster

  • 2.1 Uninstalling ONOS package - PASS (tick)
  • 2.2 Apply cell to environment - PASS (tick)
  • 2.3 Creating ONOS package - PASS (tick)
  • 2.4 Installing ONOS package - PASS (tick)
  • 2.5 Set up ONOS secure SSH - PASS (tick)
  • 2.6 Starting ONOS service - PASS (tick)
  • 2.7 Start ONOS cli - PASS (tick)

Case 11: Start Mininet topology with OF 1.3 switches - PASS

Start mininet topology with OF 1.3 switches to test intents, exits out if topology did not start correctly

  • 11.1 Starting Mininet topology with OF 1.3 switches - PASS (tick)

Case 12: Assign switches to controllers - PASS

Assign OF 1.3 switches to ONOS nodes

  • 12.1 Assigning switches to controllers - PASS (tick)

Case 13: Create scapy components - PASS

  • 13.1 Create scapy components - No Result (warning)
  • 13.2 Start scapy components - PASS (tick)

Case 15: Discover all hosts using scapy - PASS

  • 15.1 Send packets from each host to the first host and confirm onos discovery - PASS (tick)
  • 15.2 Populate hostsData - PASS (tick)

Case 16: Balance mastership of switches - PASS

  • 16.1 Balancing mastership of switches - PASS (tick)

Case 17: Enable intent compilation using Flow Objectives - PASS

  • 17.1 Enabling Flow Objectives - PASS (tick)

...

16: Balance mastership of switches - PASS

  • 16.1 Balancing mastership of switches - PASS (tick)

Case 1000: Host Intents Test - 3 NODE(S) - OF 1.3 - Using Flow Rules - PASS

This test case tests Host intents using 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet and compile intents using Flow Rules

  • 1000.1 IPV4: Add and test host intents between h1 and h9 - PASS (tick)
  • 1000.2 DUALSTACK1: Add host intents between h3 and h11 - PASS (tick)
  • 1000.3 DUALSTACK2: Add host intents between h1 and h11 - PASS (tick)
  • 1000.4 1HOP: Add host intents between h1 and h3 - PASS (tick)
  • 1000.5 VLAN1: Add vlan host intents between h4 and h12 - PASS (tick)
  • 1000.6 Confirm that ONOS leadership is unchanged - PASS (tick)

Case 2000: Point Intents Test - 3 NODE(S) - OF 1.3 - Using Flow Rules - PASS

This test case will test point to point intents using 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet and compile intents using Flow Rules

  • 2000.1 NOOPTION: Add point intents between h1 and h9 - PASS (tick)
  • 2000.2 IPV4: Add point intents between h1 and h9 - PASS (tick)
  • 2000.3 IPV4_2: Add point intents between h1 and h9 - PASS (tick)
  • 2000.4 SDNIP-ICMP: Add point intents between h1 and h9 - PASS (tick)
  • 2000.5 SDNIP-TCP: Add point intents between h1 and h9 - PASS (tick)
  • 2000.6 DUALSTACK1: Add point intents between h3 and h11 - PASS (tick)
  • 2000.7 VLAN: Add point intents between h5 and h21 - PASS (tick)
  • 2000.8 1HOP: Add point intents between h1 and h3 - PASS (tick)

Case 3000: Single to Multi Point Intents Test - 3 NODE(S) - OF 1.3 - Using Flow

...

Rules - PASS

This test case tests Host will test single point to multi point intents using 1 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet and compile intents using Flow ObjectivesRules

  • 1000 3000.1 IPV4NOOPTION: Add Install and test host intents between h1 and h9 single point to multi point intents - PASS (tick) 1000
  • 3000.2 DUALSTACK1: Add host intents between h3 and h11 IPV4: Install and test single point to multi point intents - PASS (tick) 1000
  • 3000.3 DUALSTACK2IPV4_2: Add host intents between h1 and h11 single point to multi point intents - PASS (tick) 1000
  • 3000.4 1HOPVLAN: Add host intents between h1 and h3 single point to multi point intents - PASS (tick) 1000
  • 3000.5 VLAN1VLAN: Add vlan host intents between h4 and h12 single point to multi point intents - PASS (tick)

Case 5000: Test host mobility with host intents - PASS

  • 5000.1 Testing host mobility by moving h1 from s5 to s6 - PASS (tick)
  • 1000.6 Confirm that ONOS leadership is unchanged 5000.2 IPV4: Add host intents between h1 and h9 - PASS (tick)

Case

...

18: Stop Mininet and Scapy - PASS

Stopping the current mininet topology to start up fresh

  • 18.1 Stopping and Removing Scapy Host Components - PASS (tick)
  • 18.2 Stopping Mininet Topology - PASS (tick)

Case 19: Copy karaf logs - PASS

Copying the karaf logs to preserve them throughreinstalling ONOS

  • 19.1 Copying karaf logs - PASS (tick)

Case 2: Starting up 1 node(s) ONOS cluster - PASS

Set up ONOS with 1 node(s) ONOS cluster

  • 2.1 Uninstalling ONOS package - PASS (tick)
  • 2.2 Apply cell to environment - PASS (tick)
  • 2.3 Creating ONOS package - PASS (tick)
  • 2.4 Installing ONOS package - PASS (tick)
  • 2.5 Set up ONOS secure SSH - PASS (tick)
  • 2.6 Starting ONOS service - PASS (tick)
  • 2.7 Start ONOS cli - PASS (tick)

Case 11: Start Mininet topology with OF 1.3 switches - PASS

Start mininet topology with OF 1.3 switches to test intents, exits out if topology did not start correctly

  • 11.1 Starting Mininet topology with OF 1.3 switches - PASS (tick)

Case 12: Assign switches to controllers - PASS

Assign OF 1.3 switches to ONOS nodes

  • 12.1 Assigning switches to controllers - PASS (tick)

Case 13: Create scapy components - PASS

  • 13.1 Create scapy components - No Result (warning)
  • 13.2 Start scapy components - PASS (tick)

Case 15: Discover all hosts using scapy - PASS

  • 15.1 Send packets from each host to the first host and confirm onos discovery - PASS (tick)
  • 15.2 Populate hostsData - PASS (tick)

Case 16: Balance mastership of switches - PASS

  • 16.1 Balancing mastership of switches - PASS (tick)

Case 17: Enable intent compilation using Flow Objectives - PASS

  • 17.1 Enabling Flow Objectives - PASS (tick)

Case 1000: Host Intents Test - 1 NODE(S) - OF 1.3 - Using Flow Objectives - PASS

This test case tests Host intents using 1 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet and compile intents using Flow Objectives

  • 1000.1 IPV4: Add and test host intents between h1 and h9 - PASS (tick)
  • 1000.2 DUALSTACK1: Add host intents between h3 and h11 - PASS (tick)
  • 1000.3 DUALSTACK2: Add host intents between h1 and h11 - PASS (tick)
  • 1000.4 1HOP: Add host intents between h1 and h3 - PASS (tick)
  • 1000.5 VLAN1: Add vlan host intents between h4 and h12 - PASS (tick)
  • 1000.6 Confirm that ONOS leadership is unchanged - PASS (tick)

Case 2000: Point Intents Test - 1 NODE(S) - OF 1.3 - Using Flow Objectives - PASS

This test case will test point to point intents using 1 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet and compile intents using Flow Objectives

  • 2000.1 NOOPTION: Add point intents between h1 and h9 - PASS (tick)
  • 2000.2 IPV4: Add point intents between h1 and h9 - PASS (tick)
  • 2000.3 IPV4_2: Add point intents between h1 and h9 - PASS (tick)
  • 2000.4 SDNIP-ICMP: Add point intents between h1 and h9 - PASS (tick)
  • 2000.5 SDNIP-TCP: Add point intents between h1 and h9 - PASS (tick)
  • 2000.6 DUALSTACK1: Add point intents between h3 and h11 - PASS (tick)
  • 2000.7 VLAN: Add point intents between h5 and h21 - PASS (tick)
  • 2000.8 1HOP: Add point intents between h1 and h3 - PASS (tick)

Case 3000: Single to Multi Point Intents Test - 1 NODE(S) - OF 1.3 - Using Flow Objectives - PASS

This test case will test single point to multi point intents using 1 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet and compile intents using Flow Objectives

  • 3000.1 NOOPTION: Install and test single point to multi point intents - PASS (tick)
  • 3000.2 IPV4: Install and test single point to multi point intents - PASS (tick)
  • 3000.3 IPV4_2: Add single point to multi point intents - PASS (tick)
  • 3000.4 VLAN: Add single point to multi point intents - PASS (tick)
  • 3000.5 VLAN: Add single point to multi point intents - PASS (tick)

Case 5000: Test host mobility with host intents - PASS

  • 5000.1 Testing host mobility by moving h1 from s5 to s6 - PASS (tick)
  • 5000.2 IPV4: Add host intents between h1 and h9 - PASS (tick)

Case 18: Stop Mininet and Scapy - PASS

Stopping the current mininet topology to start up fresh

  • 18.1 Stopping and Removing Scapy Host Components - PASS (tick)
  • 18.2 Stopping Mininet Topology - PASS (tick)

Case 19: Copy karaf logs - PASS

Copying the karaf logs to preserve them throughreinstalling ONOS

  • 19.1 Copying karaf logs - PASS (tick)

Case 2: Starting up 3 node(s) ONOS cluster - PASS

Set up ONOS with 3 node(s) ONOS cluster

  • 2.1 Uninstalling ONOS package - PASS (tick)
  • 2.2 Apply cell to environment - PASS (tick)
  • 2.3 Creating ONOS package - PASS (tick)
  • 2.4 Installing ONOS package - PASS (tick)
  • 2.5 Set up ONOS secure SSH - PASS (tick)
  • 2.6 Starting ONOS service - PASS (tick)
  • 2.7 Start ONOS cli - PASS (tick)

Case 11: Start Mininet topology with OF 1.3 switches - PASS

Start mininet topology with OF 1.3 switches to test intents, exits out if topology did not start correctly

  • 11.1 Starting Mininet topology with OF 1.3 switches - PASS (tick)

Case 12: Assign switches to controllers - PASS

Assign OF 1.3 switches to ONOS nodes

  • 12.1 Assigning switches to controllers - PASS (tick)

Case 13: Create scapy components - PASS

  • 13.1 Create scapy components - No Result (warning)
  • 13.2 Start scapy components - PASS (tick)

Case 15: Discover all hosts using scapy - PASS

  • 15.1 Send packets from each host to the first host and confirm onos discovery - PASS (tick)
  • 15.2 Populate hostsData - PASS (tick)

Case 16: Balance mastership of switches - PASS

  • 16.1 Balancing mastership of switches - PASS (tick)

Case 17: Enable intent compilation using Flow Objectives - PASS

  • 17.1 Enabling Flow Objectives - PASS (tick)

Case 1000: Host Intents Test - 3 NODE(S) - OF 1.3 - Using Flow Objectives - PASS

This test case tests Host intents using 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet and compile intents using Flow Objectives

  • 1000.1 IPV4: Add and test host intents between h1 and h9 - PASS (tick)
  • 1000.2 DUALSTACK1: Add host intents between h3 and h11 - PASS (tick)
  • 1000.3 DUALSTACK2: Add host intents between h1 and h11 - PASS (tick)
  • 1000.4 1HOP: Add host intents between h1 and h3 - PASS (tick)
  • 1000.5 VLAN1: Add vlan host intents between h4 and h12 - PASS (tick)
  • 1000.6 Confirm that ONOS leadership is unchanged - PASS (tick)

Case 2000: Point Intents Test - 3 NODE(S) - OF 1.3 - Using Flow Objectives - PASS

This test case will test point to point intents using 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet and compile intents using Flow Objectives

  • 2000.1 NOOPTION: Add point intents between h1 and h9 - PASS (tick)
  • 2000.2 IPV4: Add point intents between h1 and h9 - PASS (tick)
  • 2000.3 IPV4_2: Add point intents between h1 and h9 - PASS (tick)
  • 2000.4 SDNIP-ICMP: Add point intents between h1 and h9 - PASS (tick)
  • 2000.5 SDNIP-TCP: Add point intents between h1 and h9 - PASS (tick)
  • 2000.6 DUALSTACK1: Add point intents between h3 and h11 - PASS (tick)
  • 2000.7 VLAN: Add point intents between h5 and h21 - PASS (tick)
  • 2000.8 1HOP: Add point intents between h1 and h3 - PASS (tick)

Case 3000: Single to Multi Point Intents Test - 3 NODE(S) - OF 1.3 - Using Flow Objectives - PASS

This test case will test single point to multi point intents using 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet and compile intents using Flow Objectives

  • 3000.1 NOOPTION: Install and test single point to multi point intents - PASS (tick)
  • 3000.2 IPV4: Install and test single point to multi point intents - PASS (tick)
  • 3000.3 IPV4_2: Add single point to multi point intents - PASS (tick)
  • 3000.4 VLAN: Add single point to multi point intents - PASS (tick)
  • 3000.5 VLAN: Add single point to multi point intents - PASS (tick)

Case 5000: Test host mobility with host intents - PASS

  • 5000.1 Testing host mobility by moving h1 from s5 to s6 - PASS (tick)
  • 5000.2 IPV4: Add host intents between h1 and h9 - PASS (tick)

Case 18: Stop Mininet and Scapy - PASS

This test case will test point to point intents using 1 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet and compile intents using Flow Objectives

  • 2000.1 NOOPTION: Add point intents between h1 and h9 - PASS (tick)
  • 2000.2 IPV4: Add point intents between h1 and h9 - PASS (tick)
  • 2000.3 IPV4_2: Add point intents between h1 and h9 - PASS (tick)
  • 2000.4 SDNIP-ICMP: Add point intents between h1 and h9 - PASS (tick)
  • 2000.5 SDNIP-TCP: Add point intents between h1 and h9 - PASS (tick)
  • 2000.6 DUALSTACK1: Add point intents between h3 and h11 - PASS (tick)
  • 2000.7 VLAN: Add point intents between h5 and h21 - PASS (tick)
  • 2000.8 1HOP: Add point intents between h1 and h3 - PASS (tick)

Case 3000: Single to Multi Point Intents Test - 1 NODE(S) - OF 1.3 - Using Flow Objectives - PASS

This test case will test single point to multi point intents using 1 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet and compile intents using Flow Objectives

  • 3000.1 NOOPTION: Install and test single point to multi point intents - PASS (tick)
  • 3000.2 IPV4: Install and test single point to multi point intents - PASS (tick)
  • 3000.3 IPV4_2: Add single point to multi point intents - PASS (tick)
  • 3000.4 VLAN: Add single point to multi point intents - PASS (tick)
  • 3000.5 VLAN: Add single point to multi point intents - PASS (tick)

Case 5000: Test host mobility with host intents - PASS

  • 5000.1 Testing host mobility by moving h1 from s5 to s6 - PASS (tick)
  • 5000.2 IPV4: Add host intents between h1 and h9 - PASS (tick)

Case 18: Stop Mininet and Scapy - PASS

Stopping the current mininet topology to start up fresh

  • 18.1 Stopping and Removing Scapy Host Components - PASS (tick)
  • 18.2 Stopping Mininet Topology - PASS (tick)

Case 19: Copy karaf logs - PASS

Copying the karaf logs to preserve them throughreinstalling ONOS

  • 19.1 Copying karaf logs - PASS (tick)

Case 2: Starting up 3 node(s) ONOS cluster - PASS

Set up ONOS with 3 node(s) ONOS cluster

  • 2.1 Uninstalling ONOS package - PASS (tick)
  • 2.2 Apply cell to environment - PASS (tick)
  • 2.3 Creating ONOS package - PASS (tick)
  • 2.4 Installing ONOS package - PASS (tick)
  • 2.5 Set up ONOS secure SSH - PASS (tick)
  • 2.6 Starting ONOS service - PASS (tick)
  • 2.7 Start ONOS cli - PASS (tick)

Case 11: Start Mininet topology with OF 1.3 switches - PASS

Start mininet topology with OF 1.3 switches to test intents, exits out if topology did not start correctly

  • 11.1 Starting Mininet topology with OF 1.3 switches - PASS (tick)

Case 12: Assign switches to controllers - PASS

Assign OF 1.3 switches to ONOS nodes

  • 12.1 Assigning switches to controllers - PASS (tick)

Case 13: Create scapy components - PASS

  • 13.1 Create scapy components - No Result (warning)
  • 13.2 Start scapy components - PASS (tick)

Case 15: Discover all hosts using scapy - FAIL

  • 15.1 Send packets from each host to the first host and confirm onos discovery - FAIL (error)
    • ONOS incorrectly discovered hosts
    • Skipping the rest of this case.

Case 16: - FAIL

    • Skipping the rest of this case.

Case 17: - FAIL

    • Skipping the rest of this case.

Case 1000: - FAIL

    • Skipping the rest of this case.

Case 2000: - FAIL

    • Skipping the rest of this case.

Case 3000: - FAIL

    • Skipping the rest of this case.

Case 5000: - FAIL

    • Skipping the rest of this case.

...

Stopping the current mininet topology to start up fresh

  • 18.1 Stopping and Removing Scapy Host Components - PASS (tick)
  • 18.2 Stopping Mininet Topology - FAIL (error)
  • Failed to stop mininet
  • PASS (tick)

Case 19: Copy karaf logs - PASS

...