Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

HTML
<img src="https://jenkins.onosproject.org/view/QA/job/postjob-Fabric4/lastSuccessfulBuild/artifact/SRDhcprelay_master_20-builds_graph.jpg", alt="SRDhcprelay", style="width:525px;height:350px;border:0">

commit ec6baf4b195562b472ab47c1fc826afe5b981c6c 32a9c0b2d92a76e743e9e64eb2f1c6db2da77d12 (HEAD -] master, origin/master, origin/HEAD)
Author: Seyeon Jeong Andrea Campanella [seyeon@opennetworkingandrea@opennetworking.org]
AuthorDate: Tue Fri Mar 3 1727 12:3353:40 46 2020 -0800+0100
Commit: Seyeon Jeong Andrea Campanella [seyeon@opennetworkingandrea@opennetworking.org]
CommitDate: Thu Tue Apr 2 237 13:4817:03 58 2020 -0700
Fix an action of t3-troubleshot-mcast command when no sink for a multicast route
--
(cherry picked from commit fbd65dbd60d20878a3576de1fbd68d4bdee6f26c)
+0200

[ONOS-8087] Per device purgeOnDisconnection Flag

Case 1: DHCP v4 tests with 4 clients attached to switch directly and 1 server attached to switch directly, with 3 ONOS instances - PASS

...

  • 21.1 Apply cell to environment - PASS (tick)
  • 21.2 Uninstalling Atomix - PASS (tick)
  • 21.3 Uninstalling ONOS package - PASS (tick)
  • 21.4 Installing Atomix - PASS (tick)
  • 21.5 Installing ONOS package - PASS (tick)
  • 21.6 Set up ONOS secure SSH - PASS (tick)
  • 21.7 Checking ONOS service - PASS (tick)
  • 21.8 Starting ONOS CLI sessions - PASS (tick)
  • 21.9 Checking ONOS nodes - PASS (tick)
  • 21.10 Checking ONOS applications - PASS (tick)
  • 21.11 Starting Mininet Topology - PASS (tick)
  • 21.12 Verify host IP address assignment in ONOS - PASS (tick)
  • 21.13 Verify IP address assignment from hosts - PASS (tick)
  • 21.14 Stopping Mininet - PASS (tick)
  • 21.15 Copying karaf logs - PASS (tick)

Case 22: DHCP v4 tests with tagged hosts: 4 clients attached to switch directly and 1 server attached to switch indirectly (via gateway), with 3 ONOS instances - PASS

  • 22.1 Apply cell to environment - PASS (tick)
  • 22.2 Uninstalling Atomix - PASS (tick)
  • 22.3 Uninstalling ONOS package - PASS (tick)
  • 22.4 Installing Atomix - PASS (tick)
  • 22.5 Installing ONOS package - PASS (tick)
  • 22.6 Set up ONOS secure SSH - PASS (tick)
  • 22.7 Checking ONOS service - PASS (tick)
  • 22.8 Starting ONOS CLI sessions - PASS (tick)
  • 22.9 Checking ONOS nodes - PASS (tick)
  • 22.10 Checking ONOS applications - PASS (tick)
  • 22.11 Starting Mininet Topology - PASS (tick)
  • 22.12 Verify host IP address assignment in ONOS - PASS (tick)
  • 22.13 Verify IP address assignment from hosts - PASS (tick)
  • 22.14 Stopping Mininet - PASS (tick)
  • 22.15 Copying karaf logs - PASS (tick)

Case 31: DHCP v6 tests with tagged hosts: 4 clients attached to switch directly and 1 server attached to switch directly, with 3 ONOS instances - PASS

  • 31.1 Apply cell to environment - PASS (tick)
  • 31.2 Uninstalling Atomix - PASS (tick)
  • 31.3 Uninstalling ONOS package - PASS (tick)
  • 31.4 Installing Atomix - PASS (tick)
  • 31.5 Installing ONOS package - PASS (tick)
  • 31.6 Set up ONOS secure SSH - PASS (tick)
  • 31.7 Checking ONOS service - PASS (tick)
  • 31.8 Starting ONOS CLI sessions - PASS (tick)
  • 31.9 Checking ONOS nodes - PASS (tick)
  • 31.10 Checking ONOS applications - PASS (tick)
  • 31.11 Starting Mininet Topology - PASS (tick)
  • 31.12 Verify host IP address assignment in ONOS - PASS (tick)
  • 31.13 Verify IP address assignment from hosts - PASS (tick)
  • 31.14 Stopping Mininet - PASS (tick)
  • 31.15 Copying karaf logs - PASS (tick)

Case 41: DHCP v4 tests with dual-homed hosts: 4 clients attached to switch directly and 1 server attached to switch directly, with 3 ONOS instances - PASS

  • 41.1 Apply cell to environment - PASS (tick)
  • 41.2 Uninstalling Atomix - PASS (tick)
  • 41.3 Uninstalling ONOS package - PASS (tick)
  • 41.4 Installing Atomix - PASS (tick)
  • 41.5 Installing ONOS package - PASS (tick)
  • 41.6 Set up ONOS secure SSH - PASS (tick)
  • 41.7 Checking ONOS service - PASS (tick)
  • 41.8 Starting ONOS CLI sessions - PASS (tick)
  • 41.9 Checking ONOS nodes - PASS (tick)
  • 41.10 Checking ONOS applications - PASS (tick)
  • 41.11 Starting Mininet Topology - PASS (tick)
  • 41.12 Verify host IP address assignment in ONOS - PASS (tick)
  • 41.13 Verify IP address assignment from hosts - PASS (tick)
  • 41.14 Stopping Mininet - PASS (tick)
  • 41.15 Copying karaf logs - PASS (tick)

Case 51: DHCP v6 tests with dual-homed hosts: 4 clients attached to switch directly and 1 server attached to switch directly, with 3 ONOS instances - FAIL

  • 51.1 Apply cell to environment - PASS (tick)
  • 51.2 Uninstalling Atomix - PASS (tick)
  • 51.3 Uninstalling ONOS package - PASS (tick)
  • 51.4 Installing Atomix - PASS (tick)
  • 51.5 Installing ONOS package - PASS (tick)
  • 51.6 Set up ONOS secure SSH - PASS (tick)
  • 51.7 Checking ONOS service - PASS (tick)
  • 51.8 Starting ONOS CLI sessions - PASS (tick)
  • 51.9 Checking ONOS nodes - PASS (tick)
  • 51.10 Checking ONOS applications - PASS (tick)
  • 51.11 Starting Mininet Topology - PASS (tick)
  • 51.12 Verify host IP address assignment in ONOS - FAIL (error)
    • Verify ONOS host IP failed
  • 51.13 Stopping Mininet - PASS (tick)
    • Skipping the rest of this case.

Case 61: DHCP v4 tests with dual-homed tagged hosts: 4 clients attached to switch directly and 1 server attached to switch directly, with 3 ONOS instances - PASS

  • 61.1 Apply cell to environment - PASS (tick)
  • 61.2 Uninstalling Atomix - PASS (tick)
  • 61.3 Uninstalling ONOS package - PASS (tick)
  • 61.4 Installing Atomix - PASS (tick)
  • 61.5 Installing ONOS package - PASS (tick)
  • 61.6 Set up ONOS secure SSH - PASS (tick)
  • 61.7 Checking ONOS service - PASS (tick)
  • 61.8 Starting ONOS CLI sessions - PASS (tick)
  • 61.9 Checking ONOS nodes - PASS (tick)
  • 61.10 Checking ONOS applications - PASS (tick)
  • 61.11 Starting Mininet Topology - PASS (tick)
  • 61.12 Verify host IP address assignment in ONOS - PASS (tick)
  • 61.13 Verify IP address assignment from hosts - PASS (tick)
  • 61.14 Stopping Mininet - PASS (tick)
  • 61.15 Copying karaf logs - PASS (tick)

Case 71: DHCP v6 tests with dual-homed tagged hosts: 4 clients attached to switch directly and 1 server attached to switch directly, with 3 ONOS instances - FAIL

  • 71.1 Apply cell to environment - PASS (tick)
  • 71.2 Uninstalling Atomix - PASS (tick)
  • 71.3 Uninstalling ONOS package - PASS (tick)
  • 71.4 Installing Atomix - PASS (tick)
  • 71.5 Installing ONOS package - PASS (tick)
  • 71.6 Set up ONOS secure SSH - PASS (tick)
  • 71.7 Checking ONOS service - PASS (tick)
  • 71.8 Starting ONOS CLI sessions - PASS (tick)
  • 71.9 Checking ONOS nodes - PASS (tick)
  • 71.10 Checking ONOS applications - PASS (tick)
  • 71.11 Starting Mininet Topology - PASS (tick)
  • 71.12 Verify host IP address assignment in ONOS - FAIL (error)
    • Verify ONOS host IP failed
  • 71.13 Stopping Mininet - PASS (tick)
    • Skipping the rest of this case.