commit 2ec74963a4d2cfc5e566d5d045d2159606a1bf27 356d1250def0f1f23eb6af282fa8aca91c24c62f (HEAD, origin/master, origin/HEAD, master)
Author: Yi Tseng [a86487817@gmail.com]
AuthorDate: Wed Thu May 24 25 16:4901:07 58 2017 -0700
Commit: Luca Prete [luca@onlab.us]
CommitDate: Thu Sat May 25 27 00:1236:36 40 2017 +0000
[ONOS-65096510] Fix incorrect state of VPLSIntent perf aplication logic
Case 1: Constructing test variables and building ONOS package - PASS
...
- 1000.1 IPV4: Add host intents between h1 and h9 - PASS
- 1000.2 DUALSTACK1: Add host intents between h3 and h11 - PASS
- 1000.3 DUALSTACK2: Add host intents between h1 and h11 - PASS
- 1000.4 1HOP: Add host intents between h1 and h3 - PASS
- 1000.5 VLAN1: Add vlan host intents between h4 and h12 - PASS
- 1000.6 VLAN2: Add vlan host intents between h4 and h13 - PASS
- 1000.7 Encapsulation: Add host intents between h1 and h9 - PASS
- 1000.8 Confirm that ONOS leadership is unchanged - PASS
Case 2000: Point Intents Test - 1 NODE(S) - OF 1.0 - Using Flow Rules -
...
PASS
This test case will test point to point intents using 1 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.0 OVS running in Mininet and compile intents using Flow Rules
- 2000.1 BANDWIDTH ALLOCATION: Checking bandwidth allocation for point intents between h1 and h9 - FAIL
- Assertion Result for BANDWIDTH ALLOCATION for point intent
- Install Intent State Passed
- Bandwidth Allocation check Failed
- PASS
Case 3000: Single to Multi Point Intents Test - 1 NODE(S) - OF 1.0 - Using Flow Rules - PASS
...
- 5000.1 Testing host mobility by moving h1 from s5 to s6 - PASS
- 5000.2 IPV4: Add host intents between h1 and h9 - PASS
Case 6000: Test Multi to Single End Point Failure - 1 NODE(S) - OF 1.0 - Using Flow Rules -
...
PASS
- 6000.1 Installing Multi to Single Point intents with no options set - FAIL
- Assertion results for IPV4 multi to single point intent end point failure with no options set
- Install Intent State Passed
- Flow duration check Passed
- Initial Intent State Passed
- Initial Flow State Passed
- Initial Connectivity Check Passed
- Link Down Passed
- Link Down Passed
- Link Down Intent State Passed
- Link Down Flow State Passed
- Link Down Topology State Passed
- Link Down Connectivity Check Passed
- Isolation link Down Passed
- Isolation link Down Intent State Passed
- Isolation link Down Flow State Passed
- Isolation link Down Topology State Passed
- Isolation link Down Connectivity Check Passed
- Isolation link Down Connectivity Check Failed
- Link Up Passed
- Link Up Passed
- Link Up Passed
- Link Up Intent State Passed
- Link Up Flow State Passed
- Link Up Topology State Passed
- Link Up Scapy Packet Received Passed
- Remove Intents Passed
- PASS
- 6000.2 Installing Multi to Single Point intents with partial failure allowed - PASS
- 6000.3 NOOPTION: Install and test single point to multi point intents - PASS
- 6000.4 NOOPTION: Install and test single point to multi point intents with partial failures allowed - PASS
...
- 16.1 Balancing mastership of switches - PASS
Case 1000: Host Intents Test - 3 NODE(S) - OF 1.0 - Using Flow Rules - PASS
This test case tests Host intents using 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.0 OVS running in Mininet and compile intents using Flow Rules
- 1000.1 IPV4: Add host intents between h1 and h9 - PASS
- 1000.2 DUALSTACK1: Add host intents between h3 and h11 - PASS
- 1000.3 DUALSTACK2: Add host intents between h1 and h11 - PASS
- 1000.4 1HOP: Add host intents between h1 and h3 - PASS
- 1000.5 VLAN1: Add vlan host intents between h4 and h12 - PASS
- 1000.6 VLAN2: Add vlan host intents between h4 and h13 - PASS
- 1000.7 Encapsulation: Add host intents between h1 and h9 - PASS
- 1000.8 Confirm that ONOS leadership is unchanged - PASS
Case 2000: Point Intents Test - 3 NODE(S) - OF 1.0 - Using Flow Rules - FAIL
This test case will test point to point intents using 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.0 OVS running in Mininet and compile intents using Flow Rules
- 2000.1 BANDWIDTH ALLOCATION: Checking bandwidth allocation for point intents between h1 and h9 - FAIL
- Assertion Result for BANDWIDTH ALLOCATION for point intent
- Install Intent State Passed
- Bandwidth Allocation check Failed