commit 356d1250def0f1f23eb6af282fa8aca91c24c62f 146298260d64eab0aea0aae1e1d0a884d4807495 (HEAD, origin/master, origin/HEAD, master)
Author: Yi Tseng Frank Wang [a86487817@gmailwangpeihuixyz@126.com]
AuthorDate: Thu Fri May 25 1626 09:0122:58 59 2017 -0700+0800
Commit: Luca Prete [luca@onlab.usHyunsun Moon [hyunsun.moon@gmail.com]
CommitDate: Sat Tue May 27 0030 01:3609:40 47 2017 +0000
[ONOS-6510] Fix Intent perf aplication logic
remove unused code and listener at deactive function in ovsdb provider
Case 1: Constructing test variables and building ONOS package - PASS
...
- 13.1 Create scapy components - No Result
- 13.2 Start scapy components - PASS
Case 15: Discover all hosts using scapy -
...
FAIL
- 15.1 Send packets from each host to the first host and confirm onos discovery - PASS
- 15.2 Populate hostsData - PASS FAIL
- Failed to populate hostsData
Case 16:
...
-
...
FAIL
- Skipping the rest of this case.
Case 1000:
...
- FAIL
- Skipping the rest of this case.
Case 2000: - FAIL
- Skipping the rest of this case.
Case 3000: - FAIL
- Skipping the rest of this case.
Case 4000: - FAIL
- Skipping the rest of this case.
Case 5000: - FAIL
- Skipping the rest of this case.
Case 6000: - FAIL
- Skipping the rest of this case.
Case 18: Stop Mininet and Scapy - PASS
Stopping the current mininet topology to start up fresh
- 18.1 Stopping and Removing Scapy Host Components - PASS
- 18.2 Stopping Mininet Topology - PASS
Case 19: Copy karaf logs - PASS
Copying the karaf logs to preserve them throughreinstalling ONOS
- 19.1 Copying karaf logs - PASS
Case 2: Starting up 3 node(s) ONOS cluster - PASS
Set up ONOS with 3 node(s) ONOS cluster
- 2.1 Uninstalling ONOS package - PASS
- 2.2 Apply cell to environment - PASS
- 2.3 Creating ONOS package - PASS
- 2.4 Installing ONOS package - PASS
- 2.5 Set up ONOS secure SSH - PASS
- 2.6 Checking ONOS is running - PASS
- 2.7 Start ONOS cli - PASS
Case 10: Start Mininet topology with OF 1.0 switches - PASS
Start mininet topology with OF 1.0 switches to test intents, exits out if topology did not start correctly
- 10.1 Starting Mininet topology with OF 1.0 switches - PASS
Case 12: Assign switches to controllers - PASS
Assign OF 1.0 switches to ONOS nodes
- 12.1 Assigning switches to controllers - PASS
Case 13: Create scapy components - PASS
- 13.1 Create scapy components - No Result
- 13.2 Start scapy components - PASS
Case 15: Discover all hosts using scapy - FAIL
- 15.1 Send packets from each host to the first host and confirm onos discovery - PASS
- 15.2 Populate hostsData - FAIL
- Failed to populate hostsData
Case 16: - FAIL
- Skipping the rest of this case.
Case 1000: - FAIL
- Skipping the rest of this case.
Case 2000: - FAIL
- Skipping the rest of this case.
Case 3000: - FAIL
- Skipping the rest of this case.
Case 4000: - FAIL
- Skipping the rest of this case.
Case 5000: - FAIL
- Skipping the rest of this case.
Case 6000: - FAIL
- Skipping the rest of this case.
Case 18: Stop Mininet and Scapy - PASS
Stopping the current mininet topology to start up fresh
- 18.1 Stopping and Removing Scapy Host Components - PASS
- 18.2 Stopping Mininet Topology - PASS
Case 19: Copy karaf logs - PASS
Copying the karaf logs to preserve them throughreinstalling ONOS
- 19.1 Copying karaf logs - PASS
Case 2: Starting up 1 node(s) ONOS cluster - PASS
Set up ONOS with 1 node(s) ONOS cluster
- 2.1 Uninstalling ONOS package - PASS
- 2.2 Apply cell to environment - PASS
- 2.3 Creating ONOS package - PASS
- 2.4 Installing ONOS package - PASS
- 2.5 Set up ONOS secure SSH - PASS
- 2.6 Checking ONOS is running - PASS
- 2.7 Start ONOS cli - PASS
Case 10: Start Mininet topology with OF 1.0 switches - PASS
Start mininet topology with OF 1.0 switches to test intents, exits out if topology did not start correctly
- 10.1 Starting Mininet topology with OF 1.0 switches - PASS
Case 12: Assign switches to controllers - PASS
Assign OF 1.0 switches to ONOS nodes
- 12.1 Assigning switches to controllers - PASS
Case 13: Create scapy components - PASS
- 13.1 Create scapy components - No Result
- 13.2 Start scapy components - PASS
Case 15: Discover all hosts using scapy - FAIL
- 15.1 Send packets from each host to the first host and confirm onos discovery - PASS
- 15.2 Populate hostsData - FAIL
- Failed to populate hostsData
Case 16: - FAIL
- Skipping the rest of this case.
Case 17: - FAIL
- Skipping the rest of this case.
Case 1000: - FAIL
- Skipping the rest of this case.
Case 2000: - FAIL
- Skipping the rest of this case.
Case 3000: - FAIL
- Skipping the rest of this case.
Case 4000: - FAIL
- Skipping the rest of this case.
Case 5000: - FAIL
- Skipping the rest of this case.
Case 6000: - FAIL
- Skipping the rest of this case.
Case 18: Stop Mininet and Scapy - PASS
Stopping the current mininet topology to start up fresh
- 18.1 Stopping and Removing Scapy Host Components - PASS
- 18.2 Stopping Mininet Topology - PASS
Case 19: Copy karaf logs - PASS
Copying the karaf logs to preserve them throughreinstalling ONOS
- 19.1 Copying karaf logs - PASS
Case 2: Starting up 3 node(s) ONOS cluster - PASS
Set up ONOS with 3 node(s) ONOS cluster
- 2.1 Uninstalling ONOS package - PASS
- 2.2 Apply cell to environment - PASS
- 2.3 Creating ONOS package - PASS
- 2.4 Installing ONOS package - PASS
- 2.5 Set up ONOS secure SSH - PASS
- 2.6 Checking ONOS is running - PASS
- 2.7 Start ONOS cli - PASS
Case 10: Start Mininet topology with OF 1.0 switches - PASS
Start mininet topology with OF 1.0 switches to test intents, exits out if topology did not start correctly
- 10.1 Starting Mininet topology with OF 1.0 switches - PASS
Case 12: Assign switches to controllers - PASS
Assign OF 1.0 switches to ONOS nodes
- 12.1 Assigning switches to controllers - PASS
Case 13: Create scapy components - PASS
- 13.1 Create scapy components - No Result
- 13.2 Start scapy components - PASS
Case 15: Discover all hosts using scapy - FAIL
- 15.1 Send packets from each host to the first host and confirm onos discovery - PASS
- 15.2 Populate hostsData - FAIL
- Failed to populate hostsData
Case 16: - FAIL
- Skipping the rest of this case.
Case 17: - FAIL
- Skipping the rest of this case.
Case 1000: - FAIL
- Skipping the rest of this case.
Case 2000: - FAIL
- Skipping the rest of this case.
Case 3000: - FAIL
- Skipping the rest of this case.
Case 4000: - FAIL
- Skipping the rest of this case.
Case 5000: - FAIL
- Skipping the rest of this case.
Case 6000: - FAIL
- Skipping the rest of this case.
This test case tests Host intents using 1 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.0 OVS running in Mininet and compile intents using Flow Rules
- 1000.1 IPV4: Add host intents between h1 and h9 - PASS
- 1000.2 DUALSTACK1: Add host intents between h3 and h11 - PASS
- 1000.3 DUALSTACK2: Add host intents between h1 and h11 - PASS
- 1000.4 1HOP: Add host intents between h1 and h3 - PASS
- 1000.5 VLAN1: Add vlan host intents between h4 and h12 - PASS
- 1000.6 VLAN2: Add vlan host intents between h4 and h13 - PASS
- 1000.7 Encapsulation: Add host intents between h1 and h9 - PASS
- 1000.8 Confirm that ONOS leadership is unchanged - PASS
Case 2000: Point Intents Test - 1 NODE(S) - OF 1.0 - Using Flow Rules - PASS
This test case will test point to point intents using 1 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.0 OVS running in Mininet and compile intents using Flow Rules
- 2000.1 BANDWIDTH ALLOCATION: Checking bandwidth allocation for point intents between h1 and h9 - PASS
Case 3000: Single to Multi Point Intents Test - 1 NODE(S) - OF 1.0 - Using Flow Rules - PASS
This test case will test single point to multi point intents using 1 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.0 OVS running in Mininet and compile intents using Flow Rules
- 3000.1 NOOPTION: Install and test single point to multi point intents - PASS
- 3000.2 IPV4: Install and test single point to multi point intents - PASS
- 3000.3 IPV4_2: Add single point to multi point intents - PASS
- 3000.4 VLAN: Add single point to multi point intents - PASS
- 3000.5 VLAN: Add single point to multi point intents - PASS
Case 4000: Multi To Single Point Intents Test - 1 NODE(S) - OF 1.0 - Using Flow Rules - PASS
This test case will test single point to multi point intents using 1 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.0 OVS running in Mininet and compile intents using Flow Rules
- 4000.1 NOOPTION: Add multi point to single point intents - PASS
- 4000.2 IPV4: Add multi point to single point intents - PASS
- 4000.3 IPV4_2: Add multi point to single point intents - PASS
- 4000.4 VLAN: Add multi point to single point intents - PASS
- 4000.5 VLAN: Add multi point to single point intents - PASS
- 4000.6 ENCAPSULATION: Add multi point to single point intents - PASS
Case 5000: Test host mobility with host intents - 1 NODE(S) - OF 1.0 - Using Flow Rules - PASS
- 5000.1 Testing host mobility by moving h1 from s5 to s6 - PASS
- 5000.2 IPV4: Add host intents between h1 and h9 - PASS
Case 6000: Test Multi to Single End Point Failure - 1 NODE(S) - OF 1.0 - Using Flow Rules - PASS
- 6000.1 Installing Multi to Single Point intents with no options set - PASS
- 6000.2 Installing Multi to Single Point intents with partial failure allowed - PASS
- 6000.3 NOOPTION: Install and test single point to multi point intents - PASS 6000.4 NOOPTION: Install and test single point to multi point intents with partial failures allowed - PASS
Case 18: Stop Mininet and Scapy - PASS
Stopping the current mininet topology to start up fresh
- 18.1 Stopping and Removing Scapy Host Components - PASS
- 18.2 Stopping Mininet Topology - PASS
Case 19: Copy karaf logs - PASS
Copying the karaf logs to preserve them throughreinstalling ONOS
- 19.1 Copying karaf logs - PASS
Case 2: Starting up
...
1 node(s) ONOS cluster - PASS
Set up ONOS with 3 1 node(s) ONOS cluster
- 2.1 Uninstalling ONOS package - PASS
- 2.2 Apply cell to environment - PASS
- 2.3 Creating ONOS package - PASS
- 2.4 Installing ONOS package - PASS
- 2.5 Set up ONOS secure SSH - PASS
- 2.6 Checking ONOS is running - PASS
- 2.7 Start ONOS cli - PASS
Case
...
11: Start Mininet topology with OF 1.
...
3 switches - PASS
Start mininet topology with OF 1.0 3 switches to test intents, exits out if topology did not start correctly
- 10 11.1 Starting Mininet topology with OF 1.0 3 switches - PASS
Case 12: Assign switches to controllers - PASS
Assign OF 1.0 3 switches to ONOS nodes
- 12.1 Assigning switches to controllers - PASS
Case 13: Create scapy components - PASS
- 13.1 Create scapy components - No Result
- 13.2 Start scapy components - PASS
Case 15: Discover all hosts using scapy -
...
FAIL
- 15.1 Send packets from each host to the first host and confirm onos discovery - PASS
- 15.2 Populate hostsData - PASS
Case 16: Balance mastership of switches - PASS
- 16.1 Balancing mastership of switches - PASS
Case 1000: Host Intents Test - 3 NODE(S) - OF 1.0 - Using Flow Rules - PASS
This test case tests Host intents using 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.0 OVS running in Mininet and compile intents using Flow Rules
- 1000.1 IPV4: Add host intents between h1 and h9 - PASS
- 1000.2 DUALSTACK1: Add host intents between h3 and h11 - PASS
- 1000.3 DUALSTACK2: Add host intents between h1 and h11 - PASS
- 1000.4 1HOP: Add host intents between h1 and h3 - PASS
- 1000.5 VLAN1: Add vlan host intents between h4 and h12 - PASS
- 1000.6 VLAN2: Add vlan host intents between h4 and h13 - PASS
- 1000.7 Encapsulation: Add host intents between h1 and h9 - PASS
- 1000.8 Confirm that ONOS leadership is unchanged - PASS
Case 2000: Point Intents Test - 3 NODE(S) - OF 1.0 - Using Flow Rules - PASS
This test case will test point to point intents using 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.0 OVS running in Mininet and compile intents using Flow Rules
- 2000.1 BANDWIDTH ALLOCATION: Checking bandwidth allocation for point intents between h1 and h9 - PASS
Case 3000: Single to Multi Point Intents Test - 3 NODE(S) - OF 1.0 - Using Flow Rules - PASS
This test case will test single point to multi point intents using 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.0 OVS running in Mininet and compile intents using Flow Rules
- 3000.1 NOOPTION: Install and test single point to multi point intents - PASS
- 3000.2 IPV4: Install and test single point to multi point intents - PASS
- 3000.3 IPV4_2: Add single point to multi point intents - PASS
- 3000.4 VLAN: Add single point to multi point intents - PASS
- 3000.5 VLAN: Add single point to multi point intents - PASS
Case 4000: Multi To Single Point Intents Test - 3 NODE(S) - OF 1.0 - Using Flow Rules - PASS
This test case will test single point to multi point intents using 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.0 OVS running in Mininet and compile intents using Flow Rules
- 4000.1 NOOPTION: Add multi point to single point intents - PASS
- 4000.2 IPV4: Add multi point to single point intents - PASS
- 4000.3 IPV4_2: Add multi point to single point intents - PASS
- 4000.4 VLAN: Add multi point to single point intents - PASS
- 4000.5 VLAN: Add multi point to single point intents - PASS
- 4000.6 ENCAPSULATION: Add multi point to single point intents - PASS
Case 5000: Test host mobility with host intents - 3 NODE(S) - OF 1.0 - Using Flow Rules - PASS
- 5000.1 Testing host mobility by moving h1 from s5 to s6 - PASS
- 5000.2 IPV4: Add host intents between h1 and h9 - PASS
Case 6000: Test Multi to Single End Point Failure - 3 NODE(S) - OF 1.0 - Using Flow Rules - PASS
- 6000.1 Installing Multi to Single Point intents with no options set - PASS
- 6000.2 Installing Multi to Single Point intents with partial failure allowed - PASS
- 6000.3 NOOPTION: Install and test single point to multi point intents - PASS
- 6000.4 NOOPTION: Install and test single point to multi point intents with partial failures allowed - PASS
Case 18: Stop Mininet and Scapy - PASS
Stopping the current mininet topology to start up fresh
- 18.1 Stopping and Removing Scapy Host Components - PASS
- 18.2 Stopping Mininet Topology - PASS
Case 19: Copy karaf logs - PASS
Copying the karaf logs to preserve them throughreinstalling ONOS
- 19.1 Copying karaf logs - PASS
Case 2: Starting up 1 node(s) ONOS cluster - PASS
Set up ONOS with 1 node(s) ONOS cluster
- 2.1 Uninstalling ONOS package - PASS
- 2.2 Apply cell to environment - PASS
- 2.3 Creating ONOS package - PASS
- 2.4 Installing ONOS package - PASS
- 2.5 Set up ONOS secure SSH - PASS
- 2.6 Checking ONOS is running - PASS
- 2.7 Start ONOS cli - PASS
Case 10: Start Mininet topology with OF 1.0 switches - PASS
Start mininet topology with OF 1.0 switches to test intents, exits out if topology did not start correctly
- 10.1 Starting Mininet topology with OF 1.0 switches - PASS
Case 12: Assign switches to controllers - PASS
Assign OF 1.0 switches to ONOS nodes
- 12.1 Assigning switches to controllers - PASS
Case 13: Create scapy components - PASS
- 13.1 Create scapy components - No Result
- 13.2 Start scapy components - PASS
Case 15: Discover all hosts using scapy - PASS
- 15.1 Send packets from each host to the first host and confirm onos discovery - PASS
- 15.2 Populate hostsData - PASS
Case 16: Balance mastership of switches - PASS
- 16.1 Balancing mastership of switches - PASS
Case 17: Enable intent compilation using Flow Objectives - PASS
- 17.1 Enabling Flow Objectives - PASS
Case 1000: Host Intents Test - 1 NODE(S) - OF 1.0 - Using Flow Objectives - PASS
- FAIL
- Failed to populate hostsData
Case 16: - FAIL
- Skipping the rest of this case.
Case 1000: - FAIL
- Skipping the rest of this case.
Case 2000: - FAIL
- Skipping the rest of this case.
Case 3000: - FAIL
- Skipping the rest of this case.
Case 4000: - FAIL
- Skipping the rest of this case.
Case 5000: - FAIL
- Skipping the rest of this case.
Case 6000: - FAIL
- Skipping the rest of this case.
Case 18: Stop Mininet and Scapy - PASS
Stopping the current mininet topology to start up fresh
- 18.1 Stopping and Removing Scapy Host Components - PASS
- 18.2 Stopping Mininet Topology - PASS
Case 19: Copy karaf logs - PASS
Copying the karaf logs to preserve them throughreinstalling ONOS
- 19.1 Copying karaf logs - PASS
Case 2: Starting up 3 node(s) ONOS cluster - PASS
Set up ONOS with 3 node(s) ONOS cluster
- 2.1 Uninstalling ONOS package - PASS
- 2.2 Apply cell to environment - PASS
- 2.3 Creating ONOS package - PASS
- 2.4 Installing ONOS package - PASS
- 2.5 Set up ONOS secure SSH - PASS
- 2.6 Checking ONOS is running - PASS
- 2.7 Start ONOS cli - PASS
Case 11: Start Mininet topology with OF 1.3 switches - PASS
Start mininet topology with OF 1.3 switches to test intents, exits out if topology did not start correctly
- 11.1 Starting Mininet topology with OF 1.3 switches - PASS
Case 12: Assign switches to controllers - PASS
Assign OF 1.3 switches to ONOS nodes
- 12.1 Assigning switches to controllers - PASS
Case 13: Create scapy components - PASS
- 13.1 Create scapy components - No Result
- 13.2 Start scapy components - PASS
Case 15: Discover all hosts using scapy - FAIL
- 15.1 Send packets from each host to the first host and confirm onos discovery - PASS
- 15.2 Populate hostsData - FAIL
- Failed to populate hostsData
Case 16: - FAIL
- Skipping the rest of this case.
Case 1000: - FAIL
- Skipping the rest of this case.
Case 2000: - FAIL
- Skipping the rest of this case.
Case 3000: - FAIL
- Skipping the rest of this case.
Case 4000: - FAIL
- Skipping the rest of this case.
Case 5000: - FAIL
- Skipping the rest of this case.
Case 6000: - FAIL
- Skipping the rest of this case.
Case 18: Stop Mininet and Scapy - PASS
Stopping the current mininet topology to start up fresh
- 18.1 Stopping and Removing Scapy Host Components - PASS
- 18.2 Stopping Mininet Topology - PASS
Case 19: Copy karaf logs - PASS
Copying the karaf logs to preserve them throughreinstalling ONOS
- 19.1 Copying karaf logs - PASS
Case 2: Starting up 1 node(s) ONOS cluster - PASS
Set up ONOS with 1 node(s) ONOS cluster
- 2.1 Uninstalling ONOS package - PASS
- 2.2 Apply cell to environment - PASS
- 2.3 Creating ONOS package - PASS
- 2.4 Installing ONOS package - PASS
- 2.5 Set up ONOS secure SSH - PASS
- 2.6 Checking ONOS is running - PASS
- 2.7 Start ONOS cli - PASS
Case 11: Start Mininet topology with OF 1.3 switches - PASS
Start mininet topology with OF 1.3 switches to test intents, exits out if topology did not start correctly
- 11.1 Starting Mininet topology with OF 1.3 switches - PASS
Case 12: Assign switches to controllers - PASS
Assign OF 1.3 switches to ONOS nodes
- 12.1 Assigning switches to controllers - PASS
Case 13: Create scapy components - PASS
- 13.1 Create scapy components - No Result
- 13.2 Start scapy components - PASS
Case 15: Discover all hosts using scapy - FAIL
- 15.1 Send packets from each host to the first host and confirm onos discovery - PASS
- 15.2 Populate hostsData - FAIL
- Failed to populate hostsData
Case 16: - FAIL
- Skipping the rest of this case.
Case 17: - FAIL
- Skipping the rest of this case.
Case 1000: - FAIL
- Skipping the rest of this case.
Case 2000: - FAIL
- Skipping the rest of this case.
Case 3000: - FAIL
- Skipping the rest of this case.
Case 4000: - FAIL
- Skipping the rest of this case.
Case 5000: - FAIL
- Skipping the rest of this case.
Case 6000: - FAIL
- Skipping the rest of this case.
Case 18: Stop Mininet and Scapy - PASS
Stopping the current mininet topology to start up fresh
- 18.1 Stopping and Removing Scapy Host Components - PASS
- 18.2 Stopping Mininet Topology - PASS
Case 19: Copy karaf logs - PASS
Copying the karaf logs to preserve them throughreinstalling ONOS
- 19.1 Copying karaf logs - PASS
Case 2: Starting up 3 node(s) ONOS cluster - PASS
Set up ONOS with 3 node(s) ONOS cluster
- 2.1 Uninstalling ONOS package - PASS
- 2.2 Apply cell to environment - PASS
- 2.3 Creating ONOS package - PASS
- 2.4 Installing ONOS package - PASS
- 2.5 Set up ONOS secure SSH - PASS
- 2.6 Checking ONOS is running - PASS
- 2.7 Start ONOS cli - PASS
Case 11: Start Mininet topology with OF 1.3 switches - PASS
Start mininet topology with OF 1.3 switches to test intents, exits out if topology did not start correctly
- 11.1 Starting Mininet topology with OF 1.3 switches - PASS
Case 12: Assign switches to controllers - PASS
Assign OF 1.3 switches to ONOS nodes
- 12.1 Assigning switches to controllers - PASS
Case 13: Create scapy components - PASS
- 13.1 Create scapy components - No Result
- 13.2 Start scapy components - PASS
Case 15: Discover all hosts using scapy - FAIL
- 15.1 Send packets from each host to the first host and confirm onos discovery - PASS
- 15.2 Populate hostsData - FAIL
- Failed to populate hostsData
Case 16: - FAIL
- Skipping the rest of this case.
Case 17: - FAIL
- Skipping the rest of this case.
Case 1000: - FAIL
- Skipping the rest of this case.
Case 2000: - FAIL
- Skipping the rest of this case.
Case 3000: - FAIL
- Skipping the rest of this case.
Case 4000: - FAIL
- Skipping the rest of this case.
Case 5000: - FAIL
- Skipping the rest of this case.
Case 6000: - FAIL
- Skipping the rest of this case.
Case 18: Stop Mininet and Scapy - PASS
Stopping the current mininet topology to start up fresh
- 18.1 Stopping and Removing Scapy Host Components - PASS
- 18.2 Stopping Mininet Topology - PASS
Case 19: Copy karaf logs - PASS
Copying the karaf logs to preserve them throughreinstalling ONOS
- 19.1 Copying karaf logs - PASS
- 1000.1 IPV4: Add host intents between h1 and h9 - PASS
- 1000.2 DUALSTACK1: Add host intents between h3 and h11 - PASS
- 1000.3 DUALSTACK2: Add host intents between h1 and h11 - FAIL
- Assertion Result for dualstack2 host intent
- Install Intent State Passed
- Flow duration check Passed
- Initial Intent State Passed
- Initial Flow State Passed
- Initial Ping Passed
- Link Down Passed
- Link Down Intent State Passed
- Link Down Flow State Passed
- Link Down Topology State Passed
- Link Down Pingall Passed
- Link Up Passed
- Link Up Intent State Passed
- Link Up Flow State Passed
- Link Up Topology State Passed
- Link Up Pingall Failed
- Remove Intents Passed
- 1000.4 1HOP: Add host intents between h1 and h3 - PASS
- 1000.5 VLAN1: Add vlan host intents between h4 and h12 - FAIL
- Assertion Result vlan IPV4
- Install Intent State Passed
- Flow duration check Passed
- Initial Intent State Passed
- Initial Flow State Passed
- Initial Ping Passed
- Link Down Passed
- Link Down Intent State Passed
- Link Down Flow State Passed
- Link Down Topology State Passed
- Link Down Pingall Passed
- Link Up Passed
- Link Up Intent State Passed
- Link Up Flow State Passed
- Link Up Topology State Passed
- Link Up Pingall Failed
- Remove Intents Passed
- 1000.6 VLAN2: Add vlan host intents between h4 and h13 - FAIL
- Assertion Result vlan IPV4
- Install Intent State Passed
- Flow duration check Passed
- Initial Intent State Passed
- Initial Flow State Passed
- Initial Ping Passed
- Link Down Passed
- Link Down Intent State Passed
- Link Down Flow State Passed
- Link Down Topology State Passed
- Link Down Pingall Passed
- Link Up Passed
- Link Up Intent State Passed
- Link Up Flow State Passed
- Link Up Topology State Passed
- Link Up Pingall Failed