Due to a ransomware attack, the wiki was reverted to a July 2022 version. . We apologize for the lack of a more recent valid backup.
...
...
HTML |
---|
<img src="https://jenkins.onosproject.org/view/QA/job/postjob-BM/lastSuccessfulBuild/artifact/VPLSfailsafe_master_20-builds_graph.jpg", alt="VPLSfailsafe", style="width:525px;height:350px;border:0"> |
commit 18fdda8cb850b6e6f22f98180f4e1c35e6267b5e (HEAD -] master commit a028a2c61c696d33c81e4fc4e12a9e8d9e6c5091 (HEAD, origin/master, origin/HEAD, master)
Author: Yuta HIGUCHI [y-higuchi@ak.jp.nec.comAndrea Campanella [andrea@opennetworking.org]
AuthorDate: Sat Aug 5 15:43:15 2017 -0700Mon Sep 13 12:37:36 2021 +0200
Commit: Yuta HIGUCHI [y-higuchi@ak.jp.nec.comAndrea Campanella [andrea@opennetworking.org]
CommitDate: Sat Aug 5 15:43:15 2017 -0700
incubator-core no longer existsMon Sep 20 07:18:54 2021 +0000
[VOL-4343] Processing status of ports in order with mastership and connection/disconnection to avoid inconsisten state
--
(cherry picked from commit b0b93ac609e7860d5fd15703a50a0180fbf7a176)
(cherry picked from commit 727ed68ed3edc4512e353af814abe327ee25f143)
Case 1:
...
Starting up 3 node(s) ONOS cluster - PASS
Set up ONOS with 3 node(s) ONOS cluster
- 1.1 Constructing test variables - PASS
Setup the test environment including installing ONOS, starting Mininet and ONOScli sessions.
- 1.1 Create cell file - No Result
- 1.2 Applying Apply cell variable to environment - No Result PASS
- 1.3 Starting Mininet Uninstalling Atomix - PASS
- 1.4 Uninstalling ONOS package - PASS
- 1.5 Creating ONOS package - PASS
- 1.6 Installing Atomix - PASS
- 1.5 7 Installing ONOS package - PASS
- 1.6 8 Set up ONOS secure SSH - PASS
- 1.7 9 Checking if ONOS is up yet service - PASS
- 1.8 10 Starting ONOS CLI sessions - PASS
- 1.11 Checking ONOS nodes - PASS
- 1.12 Checking ONOS applications - PASS
- 1.13 Starting Mininet - PASS
- 1.14 9 Activate apps defined in the params file - No Result
- 1.10 15 Set ONOS configurations - No Result
- 1.11 16 App Ids check - PASS
Case 2: - PASS
...
- 200.1 Delete s5. - PASS
- 200.2 Check intent states - FAIL
- Not all Intents in installed state
- 200.3 Testing connectivity... - PASS FAIL
- Connectivity failed.
- 200.4 Add s5. - PASS
- 200.5 Reconnecting links on s5. - No Result
- 200.6 Check intent states - FAIL
- Not all Intents in installed state
- 200.7 Testing connectivity... - FAIL
- Connectivity failed.
- 200.8 Delete s6. - FAIL
- Failed to delete switch.
- 200.9 Check intent states - FAIL
- Not all Intents in installed state
- 200.10 Testing connectivity... - FAIL
- Connectivity failed.
- 200.11 Add s6. - FAIL
- Failed to add switch.
- 200.12 Reconnecting links on s6. - No Result
- 200.13 Check intent states - FAIL
- Not all Intents in installed state
- 200.14 Testing connectivity... - FAIL Connectivity is NOT as expected.
- is NOT as expected.