Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Test Case #DescriptionPass/Fail Criteria
1Compile ONOS, push ONOS to test machines, set up Mininet, and set up test parameters.Pass: Mininet, ONOS, and parameters are set up correctly.
2Load and test VPLS configurations from .json configuration file located in onos/tools/test/topos.Pass: Configurations are loaded correctly, connectivity is as expected.
103

Test various VPLS CLI commands:

Remove an interface from

the

a VPLS network.

Pass: Connectivity tests are as expected.
11Clean all VPLS configurations.Pass: Connectivity tests are as expected.
12Create a new VPLS network.Pass: Connectivity tests are as expected.
13Add interfaces to the newly created networknew VPLS network.Pass: Connectivity tests are as expected.
14Add MPLS encapsulation.Pass: Connectivity tests are as expected.
15Change MPLS encapsulationan encapsulation type.Pass: Connectivity tests are as expected.
16Remove MPLS encapsulation.Clean all private LAN server configurations.Pass: All connectivity tests that are run after each sub-step Connectivity tests are as expected.