Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: Published from Jenkins build: https://onos-jenkins.onlab.us/job/FUNCintent/1023/

...

commit 57c4ff7c0975ca3fe8dc0b31be5f342f13fda0a6 b0ac590548e9813ac6318291e1d36f9daf92dad9 (HEAD, origin/master, origin/HEAD, master)
Author: Sean Condon Jordan Halterman [seanjordan@opennetworking.condon@microsemi.comorg]
AuthorDate: Sat Sun Jul 29 1730 12:3831:56 01 2017 +0100-0700
Commit: Sean Condon Jordan Halterman [seanjordan@opennetworking.condon@microsemi.comorg]
CommitDate: Sat Jul 29 17:38:56 2017 +0100
Bug fix for unit test with yang-tools-2.2b2
Tue Aug 1 00:27:26 2017 +0000

[ONOS-6869] Move blocking DocumentTree to core primitives package and implement default methods for constructing blocking primitives

Case 1: Pull onos branch and Case 1: Pull onos branch and build onos on Teststation. - PASS

...

  • 1000.1 IPV4: Add host intents between h1 and h9 - PASS (tick)
  • 1000.2 DUALSTACK1: Add host intents between h3 and h11 - PASS (tick)
  • 1000.3 DUALSTACK2: Add host intents between h1 and h11 - PASS (tick)
  • 1000.4 1HOP: Add host intents between h1 and h3 - PASS (tick)
  • 1000.5 VLAN1: Add vlan host intents between h4 and h12 - PASS (tick)
  • 1000.6 VLAN2: Add vlan host intents between h4 and h13 - PASS (tick)
  • 1000.7 Encapsulation: Add host intents between h1 and h9 - PASS (tick)
  • 1000.8 Confirm that ONOS leadership is unchanged - PASS (tick)

Case 2000: Point Intents Test - 1 NODE(S) - OF 1.0 - Using Flow Rules -

...

PASS

This test case will test point to point intents using 1 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.0 OVS running in Mininet and compile intents using Flow Rules

  • 2000.1 NOOPTION: Add point intents between h1 and h9 - PASS (tick)
  • 2000.2 IPV4: Add point intents between h1 and h9 - PASS (tick)
  • 2000.3 Protected: Add point intents between h1 and h9 - PASS (tick)
  • 2000.4 IPV4_2: Add point intents between h1 and h9 - PASS (tick)
  • 2000.5 SDNIP-ICMP: Add point intents between h1 and h9 - PASS (tick)
  • 2000.6 SDNIP-TCP: Add point intents between h1 and h9 - PASS (tick)
  • 2000.7 DUALSTACK1: Add point intents between h3 and h11 - PASS (tick)
  • 2000.8 VLAN: Add point intents between h5 and h21 - PASS (tick)
  • 2000.9 VLAN: Add point intents between h5 and h21 - PASS (tick)
  • 2000.10 1HOP: Add point intents between h1 and h3 - PASS (tick)
  • 2000.11 Add point to point intents using VLAN Encapsulation - PASS (tick)
  • 2000.12 BANDWIDTH ALLOCATION: Checking bandwidth allocation for point intents between h1 and h9 - FAIL (error)
    • Assertion Result for BANDWIDTH ALLOCATION for point intent
    • Install Intent State Passed
    • Bandwidth Allocation check Passed
    • Flow duration check Passed
    • Initial Intent State Passed
    • Initial Flow State Passed
    • Initial Ping Passed
    • Link Down Passed
    • Link Down Intent State Failed
    • Link Down Flow State Passed
    • Link Down Topology State Passed
    • Link Down Pingall Failed
    • Link Up Passed
    • Link Up Intent State Passed
    • Link Up Flow State Passed
    • Link Up Topology State Passed
    • Link Up Scapy Packet Received Passed
    • Remove Intents Passed

Case 3000: Single to Multi Point Intents Test - 1 NODE(S) - OF 1.0 - Using Flow Rules - PASS

  • PASS (tick)

Case 3000: Single to Multi Point Intents Test - 1 NODE(S) - OF 1.0 - Using Flow Rules - PASS

This test case will test single point to multi point intents using 1 node(s) cluster; This test case will test single point to multi point intents using 1 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.0 OVS running in Mininet and compile intents using Flow Rules

...

  • 5000.1 Testing host mobility by moving h1 from s5 to s6 - PASS (tick)
  • 5000.2 IPV4: Add host intents between h1 and h9 - PASS (tick)

Case 6000: Test Multi to Single End Point Failure - 1 NODE(S) - OF 1.0 - Using Flow Rules -

...

FAIL

  • 6000.1 Installing Multi to Single Point intents with no options set - PASS (tick)
  • 6000.2 Installing Multi to Single Point intents with partial failure allowed - PASS (tick)
  • 6000.3 NOOPTION: Install and test single point to multi point intents - PASS (tick)
  • 6000.4 NOOPTION: Install and test single point to multi point intents with partial failures allowed - PASS (tick)

Case 18: Stop Mininet and Scapy - PASS

Stopping the current mininet topology to start up fresh

  • 18.1 Stopping and Removing Scapy Host Components - PASS (tick)
  • 18.2 Stopping Mininet - PASS (tick)

Case 19: Copy karaf logs - PASS

Copying the karaf logs to preserve them throughreinstalling ONOS

  • 19.1 Copying karaf logs - PASS (tick)

Case 2: Starting up 3 node(s) ONOS cluster - PASS

Set up ONOS with 3 node(s) ONOS cluster

  • 2.1 Apply cell to environment - PASS (tick)
  • 2.2 Uninstalling ONOS package - PASS (tick)
  • 2.3 Creating ONOS package - PASS (tick)
  • 2.4 Installing ONOS package - PASS (tick)
  • 2.5 Set up ONOS secure SSH - PASS (tick)
  • 2.6 Starting ONOS service - PASS (tick)
  • 2.7 Starting ONOS CLI sessions - PASS (tick)

Case 10: Start Mininet topology with OF 1.0 switches - PASS

Start mininet topology with OF 1.0 switches to test intents, exits out if topology did not start correctly

  • 10.1 Starting Mininet topology with OF 1.0 switches - PASS (tick)

Case 12: Assign switches to controllers - PASS

Assign OF 1.0 switches to ONOS nodes

  • 12.1 Assigning switches to controllers - PASS (tick)

Case 13: Create scapy components - PASS

  • 13.1 Create scapy components - No Result (warning)
  • 13.2 Start scapy components - PASS (tick)

Case 15: Discover all hosts using scapy - PASS

  • 15.1 Send packets from each host to the first host and confirm onos discovery - PASS (tick)
  • 15.2 Populate hostsData - PASS (tick)

Case 16: Balance mastership of switches - PASS

  • 16.1 Balancing mastership of switches - PASS (tick)

Case 1000: Host Intents Test - 3 NODE(S) - OF 1.0 - Using Flow Rules - PASS

This test case tests Host intents using 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.0 OVS running in Mininet and compile intents using Flow Rules

  • 1000.1 IPV4: Add host intents between h1 and h9 - PASS (tick)
  • 1000.2 DUALSTACK1: Add host intents between h3 and h11 - PASS (tick)
  • 1000.3 DUALSTACK2: Add host intents between h1 and h11 - PASS (tick)
  • 1000.4 1HOP: Add host intents between h1 and h3 - PASS (tick)
  • 1000.5 VLAN1: Add vlan host intents between h4 and h12 - PASS (tick)
  • 1000.6 VLAN2: Add vlan host intents between h4 and h13 - PASS (tick)
  • 1000.7 Encapsulation: Add host intents between h1 and h9 - PASS (tick)
  • 1000.8 Confirm that ONOS leadership is unchanged - PASS (tick)

...

  • FAIL (error)
    • Assertion results for IPV4 single to multi point intent with partial failures allowed
    • Install Intent State Passed
    • Flow duration check Passed
    • Initial Intent State Passed
    • Initial Flow State Passed
    • Initial Connectivity Check Passed
    • Link Down Passed
    • Link Down Passed
    • Link Down Intent State Passed
    • Link Down Flow State Passed
    • Link Down Topology State Passed
    • Link Down Connectivity Check Passed
    • Isolation link Down Passed
    • Partial failure isolation link Down Intent State Passed
    • Partial failure isolation link Down Flow State Passed
    • Partial failure isolation link Down Topology State Passed
    • Partial failure isolation link Down Connectivity Check Failed
    • Partial failure isolation link Down Connectivity Check Passed
    • Link Up Passed
    • Link Up Passed
    • Link Up Passed
    • Link Up Intent State Passed
    • Link Up Flow State Passed
    • Link Up Topology State Passed
    • Link Up Scapy Packet Received Passed
    • Remove Intents Passed

Case 18: Stop Mininet and Scapy - PASS

Stopping the current mininet topology to start up fresh

  • 18.1 Stopping and Removing Scapy Host Components - PASS (tick)
  • 18.2 Stopping Mininet - PASS (tick)

Case 19: Copy karaf logs - PASS

Copying the karaf logs to preserve them throughreinstalling ONOS

  • 19.1 Copying karaf logs - PASS (tick)

Case 2: Starting up 3 node(s) ONOS cluster - PASS

Set up ONOS with 3 node(s) ONOS cluster

  • 2.1 Apply cell to environment - PASS (tick)
  • 2.2 Uninstalling ONOS package - PASS (tick)
  • 2.3 Creating ONOS package - PASS (tick)
  • 2.4 Installing ONOS package - PASS (tick)
  • 2.5 Set up ONOS secure SSH - PASS (tick)
  • 2.6 Starting ONOS service - PASS (tick)
  • 2.7 Starting ONOS CLI sessions - PASS (tick)

Case 10: Start Mininet topology with OF 1.0 switches - PASS

Start mininet topology with OF 1.0 switches to test intents, exits out if topology did not start correctly

  • 10.1 Starting Mininet topology with OF 1.0 switches - PASS (tick)

Case 12: Assign switches to controllers - PASS

Assign OF 1.0 switches to ONOS nodes

  • 12.1 Assigning switches to controllers - PASS (tick)

Case 13: Create scapy components - PASS

  • 13.1 Create scapy components - No Result (warning)
  • 13.2 Start scapy components - PASS (tick)

Case 15: Discover all hosts using scapy - PASS

  • 15.1 Send packets from each host to the first host and confirm onos discovery - PASS (tick)
  • 15.2 Populate hostsData - PASS (tick)

Case 16: Balance mastership of switches - PASS

  • 16.1 Balancing mastership of switches - PASS (tick)

Case 1000: Host Intents Test - 3 NODE(S) - OF 1.0 - Using Flow Rules - PASS

This test case will test point to point tests Host intents using 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.0 OVS running in Mininet and compile intents using Flow Rules

  • 2000.1 NOOPTION: Add point intents between h1 and h9 - PASS (tick)
  • 2000.2 IPV4: Add point intents between h1 and h9 - PASS (tick)
  • 2000.3 Protected: Add point intents between h1 and h9 - PASS (tick)
  • 2000.4 IPV4_2: Add point intents between h1 and h9 - PASS (tick)
  • 2000.5 SDNIP-ICMP: Add point intents between h1 and h9 - PASS (tick)
  • 2000.6 SDNIP-TCP: Add point intents between h1 and h9 - PASS (tick)
  • 2000.7 DUALSTACK1: Add point intents between h3 and h11 - PASS (tick)
  • 2000.8 VLAN: Add point intents between h5 and h21 - PASS (tick)
  • 2000.9 VLAN: Add point intents between h5 and h21 - PASS (tick)
  • 2000.10 1HOP: Add point intents between h1 and h3 - PASS (tick)
  • 2000.11 Add point to point intents using VLAN Encapsulation - PASS (tick)
  • 2000.12 BANDWIDTH ALLOCATION: Checking bandwidth allocation for point intents between h1 and h9 - PASS (tick)

...

using Flow Rules

  • 1000.1 IPV4: Add host intents between h1 and h9 - PASS (tick)
  • 1000.2 DUALSTACK1: Add host intents between h3 and h11 - PASS (tick)
  • 1000.3 DUALSTACK2: Add host intents between h1 and h11 - PASS (tick)
  • 1000.4 1HOP: Add host intents between h1 and h3 - PASS (tick)
  • 1000.5 VLAN1: Add vlan host intents between h4 and h12 - PASS (tick)
  • 1000.6 VLAN2: Add vlan host intents between h4 and h13 - PASS (tick)
  • 1000.7 Encapsulation: Add host intents between h1 and h9 - PASS (tick)
  • 1000.8 Confirm that ONOS leadership is unchanged - PASS (tick)

Case 2000: Point Intents Test - 3 NODE(S) - OF 1.0 - Using Flow Rules - PASS

This test case will test point to point intents using 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.0 OVS running in Mininet and compile intents using Flow Rules

  • 2000.1 NOOPTION: Add point intents between h1 and h9 - PASS (tick)
  • 2000.2 IPV4: Add point intents between h1 and h9 - PASS (tick)
  • 2000.3 Protected: Add point intents between h1 and h9 - PASS (tick)
  • 2000.4 IPV4_2: Add point intents between h1 and h9 - PASS (tick)
  • 2000.5 SDNIP-ICMP: Add point intents between h1 and h9 - PASS (tick)
  • 2000.6 SDNIP-TCP: Add point intents between h1 and h9 - PASS (tick)
  • 2000.7 DUALSTACK1: Add point intents between h3 and h11 - PASS (tick)
  • 2000.8 VLAN: Add point intents between h5 and h21 - PASS (tick)
  • 2000.9 VLAN: Add point intents between h5 and h21 - PASS (tick)
  • 2000.10 1HOP: Add point intents between h1 and h3 - PASS (tick)
  • 2000.11 Add point to point intents using VLAN Encapsulation - PASS (tick)
  • 2000.12 BANDWIDTH ALLOCATION: Checking bandwidth allocation for point intents between h1 and h9 - PASS (tick)

Case 3000: Single to Multi Point Intents Test - 3 NODE(S) - OF 1.0 - Using Flow Rules - PASS

This test case will test single point to multi point intents using 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.0 OVS running in Mininet and compile intents using Flow Rules

  • 3000.1 NOOPTION: Install and test single point to multi point intents - PASS (tick)
  • 3000.2 IPV4: Install and test single point to multi point intents - PASS (tick)
  • 3000.3 IPV4_2: Add single point to multi point intents - PASS (tick)
  • 3000.4 VLAN: Add single point to multi point intents - PASS (tick)
  • 3000.5 VLAN: Add single point to multi point intents - PASS (tick)

Case 4000: Multi To Single Point Intents Test - 3 NODE(S) - OF 1.0 - Using Flow Rules - PASS

This test case will test single point to multi point intents using 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.0 OVS running in Mininet and compile intents using Flow Rules

  • 4000.1 NOOPTION: Add multi point to single point intents - PASS (tick)
  • 4000.2 IPV4: Add multi point to single point intents - PASS (tick)
  • 4000.3 IPV4_2: Add multi point to single point intents - PASS (tick)
  • 4000.4 VLAN: Add multi point to single point intents - PASS (tick)
  • 4000.5 VLAN: Add multi point to single point intents - PASS (tick)
  • 4000.6 ENCAPSULATION: Add multi point to single point intents - PASS (tick)

Case 5000: Test host mobility with host intents - 3 NODE(S) - OF 1.0 - Using Flow Rules - PASS

  • 5000.1 Testing host mobility by moving h1 from s5 to s6 - PASS (tick)
  • 5000.2 IPV4: Add host intents between h1 and h9 - PASS (tick)

Case 6000: Test Multi to Single End Point Failure - 3 NODE(S) - OF 1.0 - Using Flow Rules - FAIL

  • 6000.1 Installing Multi to Single Point intents with no options set - PASS (tick)
  • 6000.2 Installing Multi to Single Point intents with partial failure allowed - PASS (tick)
  • 6000.3 NOOPTION: Install and test single point to multi point intents - FAIL (error)
    • Assertion results for IPV4 single to multi point intent with no options set
    • Install Intent State Passed
    • Flow duration check Passed
    • Initial Intent State Passed
    • Initial Flow State Passed
    • Initial Connectivity Check Passed
    • Link Down Passed
    • Link Down Passed
    • Link Down Intent State Passed
    • Link Down Flow State Passed
    • Link Down Topology State Passed
    • Link Down Connectivity Check Passed
    • Isolation link Down Passed
    • Isolation link Down Intent State Passed
    • Isolation link Down Flow State Passed
    • Isolation link Down Topology State Passed
    • Isolation link Down Connectivity Check Failed
    • Isolation link Down Connectivity Check Passed
    • Link Up Passed
    • Link Up Passed
    • Link Up Passed
    • Link Up Intent State Passed
    • Link Up Flow State Passed
    • Link Up Topology State Passed
    • Link Up Scapy Packet Received Passed
    • Remove Intents Passed
  • 6000.4 NOOPTION: Install and test single point to multi point intents with partial failures allowed - PASS (tick)

Case 18: Stop Mininet and Scapy - PASS

Stopping the current mininet topology to start up fresh

  • 18.1 Stopping and Removing Scapy Host Components - PASS (tick)
  • 18.2 Stopping Mininet - PASS (tick)

Case 19: Copy karaf logs - PASS

Copying the karaf logs to preserve them throughreinstalling ONOS

  • 19.1 Copying karaf logs - PASS (tick)

Case 2: Starting up 1 node(s) ONOS cluster - PASS

Set up ONOS with 1 node(s) ONOS cluster

  • 2.1 Apply cell to environment - PASS (tick)
  • 2.2 Uninstalling ONOS package - PASS (tick)
  • 2.3 Creating ONOS package - PASS (tick)
  • 2.4 Installing ONOS package - PASS (tick)
  • 2.5 Set up ONOS secure SSH - PASS (tick)
  • 2.6 Starting ONOS service - PASS (tick)
  • 2.7 Starting ONOS CLI sessions - PASS (tick)

Case 10: Start Mininet topology with OF 1.0 switches - PASS

Start mininet topology with OF 1.0 switches to test intents, exits out if topology did not start correctly

  • 10.1 Starting Mininet topology with OF 1.0 switches - PASS (tick)

Case 12: Assign switches to controllers - PASS

Assign OF 1.0 switches to ONOS nodes

  • 12.1 Assigning switches to controllers - PASS (tick)

Case 13: Create scapy components - PASS

  • 13.1 Create scapy components - No Result (warning)
  • 13.2 Start scapy components - PASS (tick)

Case 15: Discover all hosts using scapy - PASS

  • 15.1 Send packets from each host to the first host and confirm onos discovery - PASS (tick)
  • 15.2 Populate hostsData - PASS (tick)

Case 16: Balance mastership of switches - PASS

  • 16.1 Balancing mastership of switches - PASS (tick)

Case 17: Enable intent compilation using Flow Objectives - PASS

  • 17.1 Enabling Flow Objectives - PASS (tick)

Case 1000: Host Intents Test - 1 NODE(S) - OF 1.0 - Using Flow Objectives - PASS

This test case tests Host intents using 1 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.0 OVS running in Mininet and compile intents using Flow Objectives

  • 1000.1 IPV4: Add host intents between h1 and h9 - PASS (tick)
  • 1000.2 DUALSTACK1: Add host intents between h3 and h11 - PASS (tick)
  • 1000.3 DUALSTACK2: Add host intents between h1 and h11 - PASS (tick)
  • 1000.4 1HOP: Add host intents between h1 and h3 - PASS (tick)
  • 1000.5 VLAN1: Add vlan host intents between h4 and h12 - PASS (tick)
  • 1000.6 VLAN2: Add vlan host intents between h4 and h13 - PASS (tick)
  • 1000.7 Encapsulation: Add host intents between h1 and h9 - PASS (tick)
  • 1000.8 Confirm that ONOS leadership is unchanged - PASS (tick)

Case 2000: Point Intents Test - 1 NODE(S) - OF 1.0 - Using Flow Objectives - FAIL

This test case will test point to point intents using 1 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.0 OVS running in Mininet and compile intents using Flow Objectives

  • 2000.1 NOOPTION: Add point intents between h1 and h9 - PASS (tick)
  • 2000.2 IPV4: Add point intents between h1 and h9 - PASS (tick)
  • 2000.3 Protected: Add point intents between h1 and h9 - FAIL (error)
    • Assertion Result for protected point intent
  • 2000.4 IPV4_2: Add point intents between h1 and h9 - PASS (tick)
  • 2000.5 SDNIP-ICMP: Add point intents between h1 and h9 - PASS (tick)
  • 2000.6 SDNIP-TCP: Add point intents between h1 and h9 - PASS (tick)
  • 2000.7 DUALSTACK1: Add point intents between h3 and h11 - PASS (tick)
  • 2000.8 VLAN: Add point intents between h5 and h21 - PASS (tick)
  • 2000.9 VLAN: Add point intents between h5 and h21 - PASS (tick)
  • 2000.10 1HOP: Add point intents between h1 and h3 - PASS (tick)
  • 2000.11 Add point to point intents using VLAN Encapsulation - PASS (tick)
  • 2000.12 BANDWIDTH ALLOCATION: Checking bandwidth allocation for point intents between h1 and h9 - FAIL (error)
    • Assertion Result for BANDWIDTH ALLOCATION for point intent
    • Install Intent State Passed
    • Bandwidth Allocation check Passed
    • Flow duration check Passed
    • Initial Intent State Passed
    • Initial Flow State Passed
    • Initial Ping Passed
    • Link Down Passed
    • Link Down Intent State Failed
    • Link Down Flow State Passed
    • Link Down Topology State Passed
    • Link Down Pingall Passed
    • Link Up Passed
    • Link Up Intent State Passed
    • Link Up Flow State Passed
    • Link Up Topology State Passed
    • Link Up Scapy Packet Received Passed
    • Remove Intents Passed

Case 3000: Single to Multi Point Intents Test - 1 NODE(S) - OF 1.0 - Using Flow Objectives - PASS

This test case will test single point to multi point intents using 1 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.0 OVS running in Mininet and compile intents using Flow Objectives

  • 3000.1 NOOPTION: Install and test single point to multi point intents - PASS (tick)
  • 3000.2 IPV4: Install and test single point to multi point intents - PASS (tick)
  • 3000.3 IPV4_2: Add single point to multi point intents - PASS (tick)
  • 3000.4 VLAN: Add single point to multi point intents - PASS (tick)
  • 3000.5 VLAN: Add single point to multi point intents - PASS (tick)

Case 4000: Multi To Single Point Intents Test - 1 NODE(S) - OF 1.0 - Using Flow Objectives - FAIL

This test case will test single point to multi point intents using 1 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.0 OVS running in Mininet and compile intents using Flow Objectives

  • 4000.1 NOOPTION: Add multi point to single point intents - PASS (tick)
  • 4000.2 IPV4: Add multi point to single point intents - PASS (tick)
  • 4000.3 IPV4_2: Add multi point to single point intents - PASS (tick)
  • 4000.4 VLAN: Add multi point to single point intents - PASS (tick)
  • 4000.5 VLAN: Add multi point to single point intents - PASS (tick)
  • 4000.6 ENCAPSULATION: Add multi point to single point intents - FAIL (error)
    • Assertion results for VLAN Encapsulation multi to single point intent
    • Install Intent State Passed
    • Flow duration check Passed
    • Initial Intent State Passed
    • Initial Flow State Passed
    • Initial Ping Passed
    • Bad Sender Ping Passed
    • Bad Recipient Ping Passed
    • Link Down Passed
    • Link Down Intent State Passed
    • Link Down Flow State Passed
    • Link Down Topology State Passed
    • Link Down Pingall Passed
    • Link Up Passed
    • Link Up Intent State Passed
    • Link Up Flow State Passed
    • Link Up Topology State Passed
    • Link Up Scapy Packet Recieved Failed
    • Remove Intents Passed

Case 5000: Test host mobility with host intents - 1 NODE(S) - OF 1.0 - Using Flow Objectives - PASS

  • 5000.1 Testing host mobility by moving h1 from s5 to s6 - PASS (tick)
  • 5000.2 IPV4: Add host intents between h1 and h9 - PASS (tick)

Case 6000: Test Multi to Single End Point Failure - 1 NODE(S) - OF 1.0 - Using Flow Objectives - PASS

  • 6000.1 Installing Multi to Single Point intents with no options set - PASS (tick)
  • 6000.2 Installing Multi to Single Point intents with partial failure allowed - PASS (tick)
  • 6000.3 NOOPTION: Install and test single point to multi point intents - PASS (tick)
  • 6000.4 NOOPTION: Install and test single point to multi point intents with partial failures allowed - PASS (tick)

Case 18: Stop Mininet and Scapy - PASS

Stopping the current mininet topology to start up fresh

  • 18.1 Stopping and Removing Scapy Host Components - PASS (tick)
  • 18.2 Stopping Mininet - PASS (tick)

Case 19: Copy karaf logs - PASS

Copying the karaf logs to preserve them throughreinstalling ONOS

  • 19.1 Copying karaf logs - PASS (tick)

Case 2: Starting up 3 node(s) ONOS cluster - PASS

Set up ONOS with 3 node(s) ONOS cluster

  • 2.1 Apply cell to environment - PASS (tick)
  • 2.2 Uninstalling ONOS package - PASS (tick)
  • 2.3 Creating ONOS package - PASS (tick)
  • 2.4 Installing ONOS package - PASS (tick)
  • 2.5 Set up ONOS secure SSH - PASS (tick)
  • 2.6 Starting ONOS service - PASS (tick)
  • 2.7 Starting ONOS CLI sessions - PASS (tick)

Case 10: Start Mininet topology with OF 1.0 switches - PASS

Start mininet topology with OF 1.0 switches to test intents, exits out if topology did not start correctly

  • 10.1 Starting Mininet topology with OF 1.0 switches - PASS (tick)

Case 12: Assign switches to controllers - PASS

Assign OF 1.0 switches to ONOS nodes

  • 12.1 Assigning switches to controllers - PASS (tick)

Case 13: Create scapy components - PASS

  • 13.1 Create scapy components - No Result (warning)
  • 13.2 Start scapy components - PASS (tick)

Case 15: Discover all hosts using scapy - PASS

  • 15.1 Send packets from each host to the first host and confirm onos discovery - PASS (tick)
  • 15.2 Populate hostsData - PASS (tick)

Case 16: Balance mastership of switches - PASS

  • 16.1 Balancing mastership of switches - PASS (tick)

Case 17: Enable intent compilation using Flow Objectives - PASS

  • 17.1 Enabling Flow Objectives - PASS (tick)

Case 1000: Host Intents Test - 3 NODE(S) - OF 1.0 - Using Flow Objectives - PASS

This test case tests Host intents using 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.0 OVS running in Mininet and compile intents using Flow Objectives

  • 1000.1 IPV4: Add host intents between h1 and h9 - PASS (tick)
  • 1000.2 DUALSTACK1: Add host intents between h3 and h11 - PASS (tick)
  • 1000.3 DUALSTACK2: Add host intents between h1 and h11 - PASS (tick)
  • 1000.4 1HOP: Add host intents between h1 and h3 - PASS (tick)
  • 1000.5 VLAN1: Add vlan host intents between h4 and h12 - PASS (tick)
  • 1000.6 VLAN2: Add vlan host intents between h4 and h13 - PASS (tick)
  • 1000.7 Encapsulation: Add host intents between h1 and h9 - PASS (tick)
  • 1000.8 Confirm that ONOS leadership is unchanged - PASS (tick)

Case 2000: Point Intents Test - 3 NODE(S) - OF 1.0 - Using Flow Objectives - FAIL

This test case will test point to point intents using 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.0 OVS running in Mininet and compile intents using Flow Objectives

  • 2000.1 NOOPTION: Add point intents between h1 and h9 - PASS (tick)
  • 2000.2 IPV4: Add point intents between h1 and h9 - PASS (tick)
  • 2000.3 Protected: Add point intents between h1 and h9 - FAIL (error)
    • Assertion Result for protected point intent
  • 2000.4 IPV4_2: Add point intents between h1 and h9 - PASS (tick)
  • 2000.5 SDNIP-ICMP: Add point intents between h1 and h9 - PASS (tick)
  • 2000.6 SDNIP-TCP: Add point intents between h1 and h9 - PASS (tick)
  • 2000.7 DUALSTACK1: Add point intents between h3 and h11 - PASS (tick)
  • 2000.8 VLAN: Add point intents between h5 and h21 - PASS (tick)
  • 2000.9 VLAN: Add point intents between h5 and h21 - PASS (tick)
  • 2000.10 1HOP: Add point intents between h1 and h3 - PASS (tick)
  • 2000.11 Add point to point intents using VLAN Encapsulation - PASS (tick)
  • 2000.12 BANDWIDTH ALLOCATION: Checking bandwidth allocation for point intents between h1 and h9 - PASS (tick)

Case 3000: Single to Multi Point Intents Test - 3 NODE(S) - OF 1.0 - Using Flow Objectives - PASS

This test case will test single point to multi point intents using 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.0 OVS running in Mininet and compile intents using Flow Objectives

  • 3000.1 NOOPTION: Install and test single point to multi point intents - PASS (tick)
  • 3000.2 IPV4: Install and test single point to multi point intents - PASS (tick)
  • 3000.3 IPV4_2: Add single point to multi point intents - PASS (tick)
  • 3000.4 VLAN: Add single point to multi point intents - PASS (tick)
  • 3000.5 VLAN: Add single point to multi point intents - PASS (tick)

Case 4000: Multi To Single Point Intents Test - 3 NODE(S) - OF 1.0 - Using Flow Objectives - FAIL

This test case will test single point to multi point intents using 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.0 OVS running in Mininet and compile intents using Flow Objectives

  • 4000.1 NOOPTION: Add multi point to single point intents - PASS (tick)
  • 4000.2 IPV4: Add multi point to single point intents - PASS (tick)
  • 4000.3 IPV4_2: Add multi point to single point intents - PASS (tick)
  • 4000.4 VLAN: Add multi point to single point intents - PASS (tick)
  • 4000.5 VLAN: Add multi point to single point intents - PASS (tick)
  • 4000.6 ENCAPSULATION: Add multi point to single point intents - FAIL (error)
    • Assertion results for VLAN Encapsulation multi to single point intent
    • Install Intent State Passed
    • Flow duration check Passed
    • Initial Intent State Passed
    • Initial Flow State Passed
    • Initial Ping Passed
    • Bad Sender Ping Passed
    • Bad Recipient Ping Passed
    • Link Down Passed
    • Link Down Intent State Passed
    • Link Down Flow State Passed
    • Link Down Topology State Passed
    • Link Down Pingall Failed
    • Link Up Passed
    • Link Up Intent State Passed
    • Link Up Flow State Passed
    • Link Up Topology State Passed
    • Link Up Scapy Packet Received Passed
    • Remove Intents Passed

Case 5000: Test host mobility with host intents - 3 NODE(S) - OF 1.0 - Using Flow Objectives - PASS

  • 5000.1 Testing host mobility by moving h1 from s5 to s6 - PASS (tick)
  • 5000.2 IPV4: Add host intents between h1 and h9 - PASS (tick)

Case 6000: Test Multi to Single End Point Failure - 3 NODE(S) - OF 1.0 - Using Flow Objectives - FAIL

  • 6000.1 Installing Multi to Single Point intents with no options set - PASS (tick)
  • 6000.2 Installing Multi to Single Point intents with partial failure allowed - PASS (tick)
  • 6000.3 NOOPTION: Install and test single point to multi point intents - FAIL (error)
    • Assertion results for IPV4 single to multi point intent with no options set
    • Install Intent State Passed
    • Flow duration check Passed
    • Initial Intent State Passed
    • Initial Flow State Passed
    • Initial Connectivity Check Passed
    • Link Down Passed
    • Link Down Passed
    • Link Down Intent State Passed
    • Link Down Flow State Passed
    • Link Down Topology State Passed
    • Link Down Connectivity Check Failed
    • Isolation link Down Passed
    • Isolation link Down Intent State Passed
    • Isolation link Down Flow State Passed
    • Isolation link Down Topology State Passed
    • Isolation link Down Connectivity Check Passed
    • Isolation link Down Connectivity Check Passed
    • Link Up Passed
    • Link Up Passed
    • Link Up Passed
    • Link Up Intent State Passed
    • Link Up Flow State Passed
    • Link Up Topology State Passed
    • Link Up Scapy Packet Received Passed
    • Remove Intents Passed
  • 6000.4 NOOPTION: Install and test single point to multi point intents with partial failures allowed - PASS (tick)

Case 18: Stop Mininet and Scapy - PASS

Stopping the current mininet topology to start up fresh

  • 18.1 Stopping and Removing Scapy Host Components - PASS (tick)
  • 18.2 Stopping Mininet - PASS (tick)

Case 19: Copy karaf logs - PASS

Copying the karaf logs to preserve them throughreinstalling ONOS

  • 19.1 Copying karaf logs - PASS (tick)

Case 2: Starting up 1 node(s) ONOS cluster - PASS

Set up ONOS with 1 node(s) ONOS cluster

  • 2.1 Apply cell to environment - PASS (tick)
  • 2.2 Uninstalling ONOS package - PASS (tick)
  • 2.3 Creating ONOS package - PASS (tick)
  • 2.4 Installing ONOS package - PASS (tick)
  • 2.5 Set up ONOS secure SSH - PASS (tick)
  • 2.6 Starting ONOS service - PASS (tick)
  • 2.7 Starting ONOS CLI sessions - PASS (tick)

Case 11: Start Mininet topology with OF 1.3 switches - PASS

Start mininet topology with OF 1.3 switches to test intents, exits out if topology did not start correctly

  • 11.1 Starting Mininet topology with OF 1.3 switches - PASS (tick)

Case 12: Assign switches to controllers - PASS

Assign OF 1.3 switches to ONOS nodes

  • 12.1 Assigning switches to controllers - PASS (tick)

Case 13: Create scapy components - PASS

  • 13.1 Create scapy components - No Result (warning)
  • 13.2 Start scapy components - PASS (tick)

Case 15: Discover all hosts using scapy - PASS

  • 15.1 Send packets from each host to the first host and confirm onos discovery - PASS (tick)
  • 15.2 Populate hostsData - PASS (tick)

Case 16: Balance mastership of switches - PASS

  • 16.1 Balancing mastership of switches - PASS (tick)

Case 1000: Host Intents Test - 1 NODE(S) - OF 1.3 - Using Flow Rules - PASS

This test case tests Host intents using 1 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet and compile intents using Flow Rules

  • 1000.1 IPV4: Add host intents between h1 and h9 - PASS (tick)
  • 1000.2 DUALSTACK1: Add host intents between h3 and h11 - PASS (tick)
  • 1000.3 DUALSTACK2: Add host intents between h1 and h11 - PASS (tick)
  • 1000.4 1HOP: Add host intents between h1 and h3 - PASS (tick)
  • 1000.5 VLAN1: Add vlan host intents between h4 and h12 - PASS (tick)
  • 1000.6 VLAN2: Add vlan host intents between h4 and h13 - PASS (tick)
  • 1000.7 Encapsulation: Add host intents between h1 and h9 - PASS (tick)
  • 1000.8 Confirm that ONOS leadership is unchanged - PASS (tick)

Case 2000: Point Intents Test - 1 NODE(S) - OF 1.3 - Using Flow Rules - FAIL

This test case will test point to point intents using 1 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet and compile intents using Flow Rules

  • 2000.1 NOOPTION: Add point intents between h1 and h9 - PASS (tick)
  • 2000.2 IPV4: Add point intents between h1 and h9 - PASS (tick)
  • 2000.3 Protected: Add point intents between h1 and h9 - PASS (tick)
  • 2000.4 IPV4_2: Add point intents between h1 and h9 - PASS (tick)
  • 2000.5 SDNIP-ICMP: Add point intents between h1 and h9 - PASS (tick)
  • 2000.6 SDNIP-TCP: Add point intents between h1 and h9 - PASS (tick)
  • 2000.7 DUALSTACK1: Add point intents between h3 and h11 - PASS (tick)
  • 2000.8 VLAN: Add point intents between h5 and h21 - PASS (tick)
  • 2000.9 VLAN: Add point intents between h5 and h21 - PASS (tick)
  • 2000.10 1HOP: Add point intents between h1 and h3 - PASS (tick)
  • 2000.11 Add point to point intents using VLAN Encapsulation - PASS (tick)
  • 2000.12 BANDWIDTH ALLOCATION: Checking bandwidth allocation for point intents between h1 and h9 - FAIL (error)
    • Assertion Result for BANDWIDTH ALLOCATION for point intent
    • Install Intent State Passed
    • Bandwidth Allocation check Passed
    • Flow duration check Passed
    • Initial Intent State Passed
    • Initial Flow State Passed
    • Initial Ping Passed
    • Link Down Passed
    • Link Down Intent State Failed
    • Link Down Flow State Passed
    • Link Down Topology State Passed
    • Link Down Pingall Passed
    • Link Up Passed
    • Link Up Intent State Passed
    • Link Up Flow State Passed
    • Link Up Topology State Passed
    • Link Up Scapy Packet Received Passed
    • Remove Intents Passed

Case 3000: Single to Multi Point Intents Test - 1 NODE(S) - OF 1.3 - Using Flow Rules - PASS

This test case will test single point to multi point intents using 1 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet and compile intents using Flow Rules

  • 3000.1 NOOPTION: Install and test single point to multi point intents - PASS (tick)
  • 3000.2 IPV4: Install and test single point to multi point intents - PASS (tick)
  • 3000.3 IPV4_2: Add single point to multi point intents - PASS (tick)
  • 3000.4 VLAN: Add single point to multi point intents - PASS (tick)
  • 3000.5 VLAN: Add single point to multi point intents - PASS (tick)

Case 4000: Multi To Single Point Intents Test - 1 NODE(S) - OF 1.3 - Using Flow Rules - PASS

This test case will test single point to multi point intents using 1 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet and compile intents using Flow Rules

  • 4000.1 NOOPTION: Add multi point to single point intents - PASS (tick)
  • 4000.2 IPV4: Add multi point to single point intents - PASS (tick)
  • 4000.3 IPV4_2: Add multi point to single point intents - PASS (tick)
  • 4000.4 VLAN: Add multi point to single point intents - PASS (tick)
  • 4000.5 VLAN: Add multi point to single point intents - PASS (tick)
  • 4000.6 ENCAPSULATION: Add multi point to single point intents - PASS (tick)

Case 5000: Test host mobility with host intents - 1 NODE(S) - OF 1.3 - Using Flow Rules - PASS

  • 5000.1 Testing host mobility by moving h1 from s5 to s6 - PASS (tick)
  • 5000.2 IPV4: Add host intents between h1 and h9 - PASS (tick)

Case 6000: Test Multi to Single End Point Failure - 1 NODE(S) - OF 1.3 - Using Flow Rules - PASS

  • 6000.1 Installing Multi to Single Point intents with no options set - PASS (tick)
  • 6000.2 Installing Multi to Single Point intents with partial failure allowed - PASS (tick)
  • 6000.3 NOOPTION: Install and test single point to multi point intents - PASS (tick)
  • 6000.4 NOOPTION: Install and test single point to multi point intents with partial failures allowed - PASS (tick)

Case 18: Stop Mininet and Scapy - PASS

Stopping the current mininet topology to start up fresh

  • 18.1 Stopping and Removing Scapy Host Components - PASS (tick)
  • 18.2 Stopping Mininet - PASS (tick)

Case 19: Copy karaf logs - PASS

Copying the karaf logs to preserve them throughreinstalling ONOS

  • 19.1 Copying karaf logs - PASS (tick)

Case 2: Starting up 3 node(s) ONOS cluster - PASS

Set up ONOS with 3 node(s) ONOS cluster

  • 2.1 Apply cell to environment - PASS (tick)
  • 2.2 Uninstalling ONOS package - PASS (tick)
  • 2.3 Creating ONOS package - PASS (tick)
  • 2.4 Installing ONOS package - PASS (tick)
  • 2.5 Set up ONOS secure SSH - PASS (tick)
  • 2.6 Starting ONOS service - PASS (tick)
  • 2.7 Starting ONOS CLI sessions - PASS (tick)

Case 11: Start Mininet topology with OF 1.3 switches - PASS

Start mininet topology with OF 1.3 switches to test intents, exits out if topology did not start correctly

  • 11.1 Starting Mininet topology with OF 1.3 switches - PASS (tick)

Case 12: Assign switches to controllers - PASS

Assign OF 1.3 switches to ONOS nodes

  • 12.1 Assigning switches to controllers - PASS (tick)

Case 13: Create scapy components - PASS

  • 13.1 Create scapy components - No Result (warning)
  • 13.2 Start scapy components - PASS (tick)

Case 15: Discover all hosts using scapy - PASS

  • 15.1 Send packets from each host to the first host and confirm onos discovery - PASS (tick)
  • 15.2 Populate hostsData - PASS (tick)

Case 16: Balance mastership of switches - PASS

  • 16.1 Balancing mastership of switches - PASS (tick)

Case 1000: Host Intents Test - 3 NODE(S) - OF 1.3 - Using Flow Rules - PASS

This test case tests Host intents using 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet and compile intents using Flow Rules

  • 1000.1 IPV4: Add host intents between h1 and h9 - PASS (tick)
  • 1000.2 DUALSTACK1: Add host intents between h3 and h11 - PASS (tick)
  • 1000.3 DUALSTACK2: Add host intents between h1 and h11 - PASS (tick)
  • 1000.4 1HOP: Add host intents between h1 and h3 - PASS (tick)
  • 1000.5 VLAN1: Add vlan host intents between h4 and h12 - PASS (tick)
  • 1000.6 VLAN2: Add vlan host intents between h4 and h13 - PASS (tick)
  • 1000.7 Encapsulation: Add host intents between h1 and h9 - PASS (tick)
  • 1000.8 Confirm that ONOS leadership is unchanged - PASS (tick)

Case 2000: Point Intents Test - 3 NODE(S) - OF 1.3 - Using Flow Rules - PASS

This test case will test point to point intents using 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet and compile intents using Flow Rules

  • 2000.1 NOOPTION: Add point intents between h1 and h9 - PASS (tick)
  • 2000.2 IPV4: Add point intents between h1 and h9 - PASS (tick)
  • 2000.3 Protected: Add point intents between h1 and h9 - PASS (tick)
  • 2000.4 IPV4_2: Add point intents between h1 and h9 - PASS (tick)
  • 2000.5 SDNIP-ICMP: Add point intents between h1 and h9 - PASS (tick)
  • 2000.6 SDNIP-TCP: Add point intents between h1 and h9 - PASS (tick)
  • 2000.7 DUALSTACK1: Add point intents between h3 and h11 - PASS (tick)
  • 2000.8 VLAN: Add point intents between h5 and h21 - PASS (tick)
  • 2000.9 VLAN: Add point intents between h5 and h21 - PASS (tick)
  • 2000.10 1HOP: Add point intents between h1 and h3 - PASS (tick)
  • 2000.11 Add point to point intents using VLAN Encapsulation - PASS (tick)
  • 2000.12 BANDWIDTH ALLOCATION: Checking bandwidth allocation for point intents between h1 and h9 - PASS (tick)

Case 3000: Single to Multi Point Intents Test - 3 NODE(S) - OF 1.3 - Using Flow Rules - PASS

This test case will test single point to multi point intents using 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet and compile intents using Flow Rules

  • 3000.1 NOOPTION: Install and test single point to multi point intents - PASS (tick)
  • 3000.2 IPV4: Install and test single point to multi point intents - PASS (tick)
  • 3000.3 IPV4_2: Add single point to multi point intents - PASS (tick)
  • 3000.4 VLAN: Add single point to multi point intents - PASS (tick)
  • 3000.5 VLAN: Add single point to multi point intents - PASS (tick)

Case 4000: Multi To Single Point Intents Test - 3 NODE(S) - OF 1.3 - Using Flow Rules - PASS

This test case will test single point to multi point intents using 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet and compile intents using Flow Rules

  • 4000.1 NOOPTION: Add multi point to single point intents - PASS (tick)
  • 4000.2 IPV4: Add multi point to single point intents - PASS (tick)
  • 4000.3 IPV4_2: Add multi point to single point intents - PASS (tick)
  • 4000.4 VLAN: Add multi point to single point intents - PASS (tick)
  • 4000.5 VLAN: Add multi point to single point intents - PASS (tick)
  • 4000.6 ENCAPSULATION: Add multi point to single point intents - PASS (tick)

Case 5000: Test host mobility with host intents - 3 NODE(S) - OF 1.3 - Using Flow Rules - PASS

  • 5000.1 Testing host mobility by moving h1 from s5 to s6 - PASS (tick)
  • 5000.2 IPV4: Add host intents between h1 and h9 - PASS (tick)

Case 6000: Test Multi to Single End Point Failure - 3 NODE(S) - OF 1.3 - Using Flow Rules - PASS

  • 6000.1 Installing Multi to Single Point intents with no options set - PASS (tick)
  • 6000.2 Installing Multi to Single Point intents with partial failure allowed - PASS (tick)
  • 6000.3 NOOPTION: Install and test single point to multi point intents - PASS (tick)
  • 6000.4 NOOPTION: Install and test single point to multi point intents with partial failures allowed - PASS (tick)

Case 18: Stop Mininet and Scapy - PASS

Stopping the current mininet topology to start up fresh

  • 18.1 Stopping and Removing Scapy Host Components - PASS (tick)
  • 18.2 Stopping Mininet - PASS (tick)

Case 19: Copy karaf logs - PASS

Copying the karaf logs to preserve them throughreinstalling ONOS

  • 19.1 Copying karaf logs - PASS (tick)

Case 2: Starting up 1 node(s) ONOS cluster - PASS

Set up ONOS with 1 node(s) ONOS cluster

  • 2.1 Apply cell to environment - PASS (tick)
  • 2.2 Uninstalling ONOS package - PASS (tick)
  • 2.3 Creating ONOS package - PASS (tick)
  • 2.4 Installing ONOS package - PASS (tick)
  • 2.5 Set up ONOS secure SSH - PASS (tick)
  • 2.6 Starting ONOS service - PASS (tick)
  • 2.7 Starting ONOS CLI sessions - PASS (tick)

Case 11: Start Mininet topology with OF 1.3 switches - PASS

Start mininet topology with OF 1.3 switches to test intents, exits out if topology did not start correctly

  • 11.1 Starting Mininet topology with OF 1.3 switches - PASS (tick)

Case 12: Assign switches to controllers - PASS

Assign OF 1.3 switches to ONOS nodes

  • 12.1 Assigning switches to controllers - PASS (tick)

Case 13: Create scapy components - PASS

  • 13.1 Create scapy components - No Result (warning)
  • 13.2 Start scapy components - PASS (tick)

Case 15: Discover all hosts using scapy - PASS

  • 15.1 Send packets from each host to the first host and confirm onos discovery - PASS (tick)
  • 15.2 Populate hostsData - PASS (tick)

Case 16: Balance mastership of switches - PASS

  • 16.1 Balancing mastership of switches - PASS (tick)

Case 17: Enable intent compilation using Flow Objectives - PASS

  • 17.1 Enabling Flow Objectives - PASS (tick)

Case 1000: Host Intents Test - 1 NODE(S) - OF 1.3 - Using Flow Objectives - FAIL

This test case tests Host intents using 1 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet and compile intents using Flow Objectives

  • 1000.1 IPV4: Add host intents between h1 and h9 - PASS (tick)
  • 1000.2 DUALSTACK1: Add host intents between h3 and h11 - PASS (tick)
  • 1000.3 DUALSTACK2: Add host intents between h1 and h11 - PASS (tick)
  • 1000.4 1HOP: Add host intents between h1 and h3 - PASS (tick)
  • 1000.5 VLAN1: Add vlan host intents between h4 and h12 - PASS (tick)
  • 1000.6 VLAN2: Add vlan host intents between h4 and h13 - PASS (tick)
  • 1000.7 Encapsulation: Add host intents between h1 and h9 - FAIL (error)
    • Assertion Result for VLAN Encapsulated host intent
    • Install Intent State Passed
    • Encapsulation intents check Passed
    • Flow duration check Passed
    • Initial Intent State Passed
    • Initial Flow State Passed
    • Initial Ping Passed
    • Link Down Passed
    • Link Down Intent State Passed
    • Link Down Flow State Passed
    • Link Down Topology State Passed
    • Link Down Pingall Passed
    • Link Up Passed
    • Link Up Intent State Passed
    • Link Up Flow State Passed
    • Link Up Topology State Passed
    • Link Up Pingall Failed
    • Remove Intents Passed
  • 1000.8 Confirm that ONOS leadership is unchanged - PASS (tick)

Case 2000: Point Intents Test - 1 NODE(S) - OF 1.3 - Using Flow Objectives - FAIL

This test case will test point to point intents using 1 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet and compile intents using Flow Objectives

  • 2000.1 NOOPTION: Add point intents between h1 and h9 - PASS (tick)
  • 2000.2 IPV4: Add point intents between h1 and h9 - PASS (tick)
  • 2000.3 Protected: Add point intents between h1 and h9 - FAIL (error)
    • Assertion Result for protected point intent
  • 2000.4 IPV4_2: Add point intents between h1 and h9 - PASS (tick)
  • 2000.5 SDNIP-ICMP: Add point intents between h1 and h9 - PASS (tick)
  • 2000.6 SDNIP-TCP: Add point intents between h1 and h9 - PASS (tick)
  • 2000.7 DUALSTACK1: Add point intents between h3 and h11 - PASS (tick)
  • 2000.8 VLAN: Add point intents between h5 and h21 - PASS (tick)
  • 2000.9 VLAN: Add point intents between h5 and h21 - PASS (tick)
  • 2000.10 1HOP: Add point intents between h1 and h3 - PASS (tick)
  • 2000.11 Add point to point intents using VLAN Encapsulation - FAIL (error)
    • Assertion Result for VLAN Encapsulation Point IntentInstall Intent State Passed
    • Encapsulation intents check Passed
    • Flow duration check Passed
    • Initial Intent State Passed
    • Initial Flow State Passed
    • Initial Ping Passed
    • Link Down Passed
    • Link Down Intent State Passed
    • Link Down Flow State Passed
    • Link Down Topology State Passed
    • Link Down Pingall Passed
    • Link Up Passed
    • Link Up Intent State Passed
    • Link Up Flow State Passed
    • Link Up Topology State Passed
    • Link Up Scapy Packet Recieved Failed
    • Remove Intents Passed
  • 2000.12 BANDWIDTH ALLOCATION: Checking bandwidth allocation for point intents between h1 and h9 - FAIL (error)
    • Assertion Result for BANDWIDTH ALLOCATION for point intent
    • Install Intent State Passed
    • Bandwidth Allocation check Passed
    • Flow duration check Passed
    • Initial Intent State Passed
    • Initial Flow State Passed
    • Initial Ping Passed
    • Link Down Passed
    • Link Down Intent State Failed
    • Link Down Flow State Passed
    • Link Down Topology State Passed
    • Link Down Pingall Passed
    • Link Up Passed
    • Link Up Intent State Passed
    • Link Up Flow State Passed
    • Link Up Topology State Passed
    • Link Up Scapy Packet Received Passed
    • Remove Intents Passed

Case 3000: Single to Multi Point Intents Test - 1 NODE(S) - OF 1.3 - Using Flow Objectives - PASS

This test case will test single point to multi point intents using 1 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet and compile intents using Flow Objectives

  • 3000.1 NOOPTION: Install and test single point to multi point intents - PASS (tick)
  • 3000.2 IPV4: Install and test single point to multi point intents - PASS (tick)
  • 3000.3 IPV4_2: Add single point to multi point intents - PASS (tick)
  • 3000.4 VLAN: Add single point to multi point intents - PASS (tick)
  • 3000.5 VLAN: Add single point to multi point intents - PASS (tick)

Case 4000: Multi To Single Point Intents Test - 1 NODE(S) - OF 1.3 - Using Flow Objectives - PASS

This test case will test single point to multi point intents using 3 1 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.0 3 OVS running in Mininet and compile intents using Flow RulesObjectives

  • 3000 4000.1 NOOPTION: Install and test single point to multi point Add multi point to single point intents - PASS (tick)
  • 4000.2 IPV4: Add multi point to single point intents - PASS (tick)
  • 4000.3 IPV4_2: Add multi point to single point intents - PASS (tick) 3000
  • 4000.2 IPV4: Install and test single 4 VLAN: Add multi point to multi single point intents - PASS (tick) 3000
  • .3 IPV4_2 4000.5 VLAN: Add single multi point to multi single point intents - PASS (tick) 3000
  • 4000.4 VLAN6 ENCAPSULATION: Add single multi point to multi single point intents - PASS (tick)

Case 5000: Test host mobility with host intents - 1 NODE(S) - OF 1.3 - Using Flow Objectives - PASS

  • 5000.1 Testing host mobility by moving h1 from s5 to s6 - PASS (tick)
  • 3000 5000.5 VLAN: Add single point to multi point intents 2 IPV4: Add host intents between h1 and h9 - PASS (tick)

Case

...

6000: Test Multi

...

to Single End Point

...

Failure -

...

1 NODE(S) - OF 1.

...

3 - Using Flow

...

Objectives - PASS

This test case will test single point to multi point intents using 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.0 OVS running in Mininet and compile intents using Flow Rules

  • 4000.1 NOOPTION: Add multi point to single point intents 6000.1 Installing Multi to Single Point intents with no options set - PASS (tick) 4000
  • 6000.2 IPV4: Add multi point to single point intents Installing Multi to Single Point intents with partial failure allowed - PASS (tick) 4000
  • 6000.3 IPV4_2: Add multi NOOPTION: Install and test single point to single multi point intents - PASS (tick) 4000
  • 6000.4 VLAN: Add multi point to single point intents NOOPTION: Install and test single point to multi point intents with partial failures allowed - PASS (tick)

Case 18: Stop Mininet and Scapy - PASS

Stopping the current mininet topology to start up fresh

  • 18.1 Stopping and Removing Scapy Host Components - PASS (tick)
  • 4000.5 VLAN: Add multi point to single point intents 18.2 Stopping Mininet - PASS (tick) 4000.6 ENCAPSULATION: Add multi point to single point intents

Case 19: Copy karaf logs - PASS

Copying the karaf logs to preserve them throughreinstalling ONOS

  • 19.1 Copying karaf logs - PASS (tick)

Case

...

2: Starting up 3 node(s) ONOS cluster - PASS

Set up ONOS with 3 node(s) ONOS cluster

  • 2.1 Apply cell to environment 5000.1 Testing host mobility by moving h1 from s5 to s6 - PASS (tick)
  • 5000 2.2 IPV4: Add host intents between h1 and h9 Uninstalling ONOS package - PASS (tick)

Case 6000: Test Multi to Single End Point Failure - 3 NODE(S) - OF 1.0 - Using Flow Rules - PASS

  • 2.3 Creating ONOS package - PASS (tick)
  • 2.4 Installing ONOS package - PASS (tick)
  • 2.5 Set up ONOS secure SSH 6000.1 Installing Multi to Single Point intents with no options set - PASS (tick) 6000.2 Installing Multi to Single Point intents with partial failure allowed
  • 2.6 Starting ONOS service - PASS (tick)
  • 2.7 Starting ONOS CLI sessions - PASS (tick)

Case 11: Start Mininet topology with OF 1.3 switches - PASS

Start mininet topology with OF 1.3 switches to test intents, exits out if topology did not start correctly

  • 11.1 Starting Mininet topology with OF 1.3 switches
  • 6000.3 NOOPTION: Install and test single point to multi point intents - PASS (tick)
  • 6000.4 NOOPTION: Install and test single point to multi point intents with partial failures allowed - PASS (tick)

Case

...

12: Assign switches to controllers - PASS

Stopping the current mininet topology to start up fresh

Assign OF 1.3 switches to ONOS nodes

  • 12.1 Assigning switches to controllers
  • 18.1 Stopping and Removing Scapy Host Components - PASS (tick)
  • 18.2 Stopping Mininet - PASS (tick)

Case

...

13: Create scapy components - PASS

  • 13.1 Create scapy components - No Result (warning)
  • 13.2 Start scapy components

Copying the karaf logs to preserve them throughreinstalling ONOS

  • 19.1 Copying karaf logs - PASS (tick)

Case

...

15: Discover all hosts using scapy - PASS

  • 15.1 Send packets from each host to the first host and confirm onos discovery

Set up ONOS with 1 node(s) ONOS cluster

  • 2.1 Apply cell to environment - PASS (tick)
  • 2 15.2 Uninstalling ONOS package Populate hostsData - PASS (tick) 2.3 Creating ONOS package

Case 16: Balance mastership of switches - PASS

  • 16.1 Balancing mastership of switches - PASS (tick)

Case 17: Enable intent compilation using Flow Objectives - PASS

  • 17.1 Enabling Flow Objectives
  • (tick)
  • 2.4 Installing ONOS package - PASS (tick)
  • 2.5 Set up ONOS secure SSH - PASS (tick)
  • 2.6 Starting ONOS service - PASS (tick)
  • 2.7 Starting ONOS CLI sessions - PASS (tick)

Case

...

1000: Host Intents Test - 3 NODE(S) - OF 1.3 - Using Flow Objectives - FAIL

This test case tests Host intents using 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet and compile intents using Flow Objectives

  • 1000.1 IPV4: Add host intents between h1 and h9 - PASS (tick)
  • 1000.2 DUALSTACK1: Add host intents between h3 and h11 - PASS (tick)
  • 1000.3 DUALSTACK2: Add host intents between h1 and h11 - PASS (tick)
  • 1000.4 1HOP: Add host intents between h1 and h3 - PASS (tick)
  • 1000.5 VLAN1: Add vlan host intents between h4 and h12 - PASS (tick)
  • 1000.6 VLAN2: Add vlan host intents between h4 and h13 - PASS (tick)
  • 1000.7 Encapsulation: Add host intents between h1 and h9 - FAIL (error)
    • Assertion Result for VLAN Encapsulated host intent
    • Install Intent State Passed
    • Encapsulation intents check Passed
    • Flow duration check Passed
    • Initial Intent State Passed
    • Initial Flow State Passed
    • Initial Ping Passed
    • Link Down Passed
    • Link Down Intent State Passed
    • Link Down Flow State Passed
    • Link Down Topology State Passed
    • Link Down Pingall Failed
    • Link Up Passed
    • Link Up Intent State Passed
    • Link Up Flow State Passed
    • Link Up Topology State Passed
    • Link Up Pingall Failed
    • Remove Intents Passed
  • 1000.8 Confirm that ONOS leadership is unchanged - PASS (tick)

Case 2000: Point Intents Test - 3 NODE(S) - OF 1.3 - Using Flow Objectives - FAIL

  • 2000.1 NOOPTION: Add point intents between h1 and h9 - PASS (tick)
  • 2000.2 IPV4: Add point intents between h1 and h9 - PASS (tick)
  • 2000.3 Protected: Add point intents between h1 and h9 - FAIL (error)
    • Assertion Result for protected point intent
  • 2000.4 IPV4_2: Add point intents between h1 and h9 - PASS (tick)
  • 2000.5 SDNIP-ICMP: Add point

Start mininet topology with OF 1.0 switches to test intents, exits out if topology did not start correctly

  • 10.1 Starting Mininet topology with OF 1.0 switches - PASS (tick)

Case 12: Assign switches to controllers - PASS

Assign OF 1.0 switches to ONOS nodes

  • 12.1 Assigning switches to controllers - PASS (tick)

Case 13: Create scapy components - PASS

  • 13.1 Create scapy components - No Result (warning)
  • 13.2 Start scapy components - PASS (tick)

Case 15: Discover all hosts using scapy - PASS

  • 15.1 Send packets from each host to the first host and confirm onos discovery - PASS (tick)
  • 15.2 Populate hostsData - PASS (tick)

Case 16: Balance mastership of switches - PASS

  • 16.1 Balancing mastership of switches - PASS (tick)

Case 17: Enable intent compilation using Flow Objectives - PASS

  • 17.1 Enabling Flow Objectives - PASS (tick)

Case 1000: Host Intents Test - 1 NODE(S) - OF 1.0 - Using Flow Objectives - PASS

  • 1000.1 IPV4: Add host intents between h1 and h9 - PASS (tick) 1000.2 DUALSTACK1
  • 2000.6 SDNIP-TCP: Add host point intents between h3 h1 and h11 h9 - PASS (tick) 1000
  • 2000.3 DUALSTACK27 DUALSTACK1: Add host point intents between h1 h3 and h11 - PASS (tick) 1000
  • 2000.4 1HOP8 VLAN: Add host point intents between h1 h5 and h3 h21 - PASS (tick)
  • 1000 2000.5 VLAN19 VLAN: Add vlan host point intents between h4 h5 and h12 h21 - PASS (tick) 1000
  • 2000.6 VLAN210 1HOP: Add vlan host point intents between h4 h1 and h13 h3 - PASS (tick)