Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

HTML
<img src="https://jenkins.onosproject.org/view/QA/job/postjob-Fabric4/lastSuccessfulBuild/artifact/SRDhcprelay-stratum_master_20-builds_graph.jpg", alt="SRDhcprelay-stratum", style="width:525px;height:350px;border:0">

commit 8a9feb5716acd365a102e742d41d8c8ae799f3cc a1b624eaa1d0241b2c8161c7854f012664908353 (HEAD -] master, origin/master, origin/HEAD)
Author: Anurag Chadha Thomas Vachuska [anuragtom@opennetworking.chadha@hsc.comorg]
AuthorDate: Tue Fri Jul 28 1831 14:3520:05 32 2020 +0530-0700
Commit: Andrea Campanella Sean Condon [andrea@opennetworkingsean@opennetworking.org]
CommitDate: Fri Jul 31 08:59:19 Mon Aug 3 07:55:09 2020 +0000
[ONOS-8111]Fix for passwordless ssh to netconf device without sshkey
Removing the host drop-shadow from the topo GUI2

Case 1: DHCP v4 tests with 4 clients attached to switch directly and 1 server attached to switch directly, with 3 ONOS instances - PASS

...

  • 12.1 Apply cell to environment - PASS (tick)
  • 12.2 Uninstalling Atomix - PASS (tick)
  • 12.3 Uninstalling ONOS package - PASS (tick)
  • 12.4 Installing Atomix - PASS (tick)
  • 12.5 Installing ONOS package - PASS (tick)
  • 12.6 Set up ONOS secure SSH - PASS (tick)
  • 12.7 Checking ONOS service - PASS (tick)
  • 12.8 Starting ONOS CLI sessions - PASS (tick)
  • 12.9 Checking ONOS nodes - PASS (tick)
  • 12.10 Checking ONOS applications - PASS (tick)
  • 12.11 Set logging levels - PASS (tick)
  • 12.12 Set ONOS configurations - PASS (tick)
  • 12.13 Starting Mininet Topology - PASS (tick)
  • 12.14 Verify host IP address assignment in ONOS - FAIL (error)
    • Verify ONOS host IP failed
  • 12.15 Stopping Mininet - PASS (tick)
    • Skipping the rest of this case.

Case 21: DHCP v4 tests with tagged hosts: 4 clients attached to switch directly and 1 server attached to switch directly, with 3 ONOS instances -

...

FAIL

  • 21.1 Apply cell to environment - PASS (tick)
  • 21.2 Uninstalling Atomix - PASS (tick)
  • 21.3 Uninstalling ONOS package - PASS (tick)
  • 21.4 Installing Atomix - PASS (tick)
  • 21.5 Installing ONOS package - PASS (tick)
  • 21.6 Set up ONOS secure SSH - PASS (tick)
  • 21.7 Checking ONOS service - PASS (tick)
  • 21.8 Starting ONOS CLI sessions - PASS (tick)
  • 21.9 Checking ONOS nodes - PASS (tick)
  • 21.10 Checking ONOS applications - PASS (tick)
  • 21.11 Set logging levels - PASS (tick)
  • 21.12 Set ONOS configurations - PASS (tick)
  • 21.13 Starting Mininet Topology - PASS (tick)
  • 21.14 Verify host IP address assignment in ONOS - PASS (tick)
  • 21.15 Verify IP address assignment from hosts - PASS (tick)
  • 21.16 Stopping Mininet - PASS (tick)
  • 21.17 Copying karaf logs - PASS (tick)

Case 22: DHCP v4 tests with tagged hosts: 4 clients attached to switch directly and 1 server attached to switch indirectly (via gateway), with 3 ONOS instances - FAIL

  • 22.1 Apply cell to environment - PASS (tick)
  • 22.2 Uninstalling Atomix - PASS (tick)
  • 22.3 Uninstalling ONOS package - PASS (tick)
  • 22.4 Installing Atomix - PASS (tick)
  • 22.5 Installing ONOS package - PASS (tick)
  • 22.6 Set up ONOS secure SSH - PASS (tick)
  • 22.7 Checking ONOS service - PASS (tick)
  • 22.8 Starting ONOS CLI sessions - PASS (tick)
  • 22.9 Checking ONOS nodes - PASS (tick)
  • 22.10 Checking ONOS applications - PASS (tick)
  • 22.11 Set logging levels - PASS (tick)
  • 22.12 Set ONOS configurations - PASS (tick)
  • 22.13 Starting Mininet Topology - PASS (tick)
  • 22.14 Verify host IP address assignment in ONOS - FAIL (error)
    • Verify ONOS host IP failed
  • 22.15 Stopping Mininet - PASS (tick)
    • Skipping the rest of this case.

Case 31: DHCP v6 tests with tagged hosts: 4 clients attached to switch directly and 1 server attached to switch directly, with 3 ONOS instances - FAIL

  • 31.1 Apply cell to environment - PASS (tick)
  • 31.2 Uninstalling Atomix - PASS (tick)
  • 31.3 Uninstalling ONOS package - PASS (tick)
  • 31.4 Installing Atomix - PASS (tick)
  • 31.5 Installing ONOS package - PASS (tick)
  • 31.6 Set up ONOS secure SSH - PASS (tick)
  • 31.7 Checking ONOS service - PASS (tick)
  • 31.8 Starting ONOS CLI sessions - PASS (tick)
  • 31.9 Checking ONOS nodes - PASS (tick)
  • 31.10 Checking ONOS applications - PASS (tick)
  • 31.11 Set logging levels - PASS (tick)
  • 31.12 Set ONOS configurations - PASS (tick)
  • 31.13 Starting Mininet Topology - PASS (tick)
  • 31.14 Verify host IP address assignment in ONOS - FAIL (error)
    • Verify ONOS host IP failed
  • 31.15 Stopping Mininet - PASS (tick)
    • Skipping the rest of this case.

Case 41: DHCP v4 tests with dual-homed hosts: 4 clients attached to switch directly and 1 server attached to switch directly, with 3 ONOS instances - PASS

  • 41.1 Apply cell to environment - PASS (tick)
  • 41.2 Uninstalling Atomix - PASS (tick)
  • 41.3 Uninstalling ONOS package - PASS (tick)
  • 41.4 Installing Atomix - PASS (tick)
  • 41.5 Installing ONOS package - PASS (tick)
  • 41.6 Set up ONOS secure SSH - PASS (tick)
  • 41.7 Checking ONOS service - PASS (tick)
  • 41.8 Starting ONOS CLI sessions - PASS (tick)
  • 41.9 Checking ONOS nodes - PASS (tick)
  • 41.10 Checking ONOS applications - PASS (tick)
  • 41.11 Set logging levels - PASS (tick)
  • 41.12 Set ONOS configurations - PASS (tick)
  • 41.13 Starting Mininet Topology - PASS (tick)
  • 41.14 Verify host IP address assignment in ONOS - PASS (tick)
  • 41.15 Verify IP address assignment from hosts - PASS (tick)
  • 41.16 Stopping Mininet - PASS (tick)
  • 41.17 Copying karaf logs - PASS (tick)

Case 51: DHCP v6 tests with dual-homed hosts: 4 clients attached to switch directly and 1 server attached to switch directly, with 3 ONOS instances - FAIL

  • 51.1 Apply cell to environment - PASS (tick)
  • 51.2 Uninstalling Atomix - PASS (tick)
  • 51.3 Uninstalling ONOS package - PASS (tick)
  • 51.4 Installing Atomix - PASS (tick)
  • 51.5 Installing ONOS package - PASS (tick)
  • 51.6 Set up ONOS secure SSH - PASS (tick)
  • 51.7 Checking ONOS service - PASS (tick)
  • 51.8 Starting ONOS CLI sessions - PASS (tick)
  • 51.9 Checking ONOS nodes - PASS (tick)
  • 51.10 Checking ONOS applications - PASS (tick)
  • 51.11 Set logging levels - PASS (tick)
  • 51.12 Set ONOS configurations - PASS (tick)
  • 51.13 Starting Mininet Topology - PASS (tick)
  • 51.14 Verify host IP address assignment in ONOS - FAIL (error)
    • Verify ONOS host IP failed
  • 51. 21.15 Stopping Mininet - PASS (tick)
    • Skipping the rest of this case.

...