Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: Published from Jenkins build: https://onos-jenkins.onlab.us/job/Pipeline_postjob_VM/1952/

...

HTML
<img src="https://onos-jenkins.onlab.us/job/Pipeline_postjob_VM/lastSuccessfulBuild/artifact/FUNCintentRest_master_20-builds_graph.jpg", alt="FUNCintentRest", style="width:525px;height:350px;border:0">

commit c29f74827d1f6650620335c1ce5a7e9f5c6a5b6e 50443e87177452963cb00e13ff746beb6b894cc7 (HEAD, origin/master, origin/HEAD, master)
Author: Ray Milkey Charles Chan [ray@opennetworkingrascov@gmail.orgcom]
AuthorDate: Fri Dec 22 Wed Jan 3 16:38:08 2017 +000026:32 2018 -0800
Commit: Ray Milkey Charles Chan [ray@opennetworkingcharles@opennetworking.org]
CommitDate: Fri Dec 22 19:22:05 2017 +0000
Revert "Bump up buck version"
--
This reverts commit e743babd01c5cbfc3f580a4c77993bc7047d0846.
Change-Id: Ida34fc6fb6faba624b93b9b01a98e9f5d2bb4d33
Thu Jan 4 18:36:14 2018 +0000

Ignore irrelevant events in SegmentRoutingManager and DhcpRelayManager

Case 1: Pull onos branch and build onos on Teststation. - PASS

...

  • 2000.1 NOOPTION: Add point intents between h1 and h9 - PASS (tick)
  • 2000.2 IPV4: Add point intents between h1 and h9 - PASS (tick)
  • 2000.3 IPV4_2: Add point intents between h1 and h9 - PASS (tick)
  • 2000.4 SDNIP-ICMP: Add point intents between h1 and h9 - PASS (tick)
  • 2000.5 SDNIP-TCP: Add point intents between h1 and h9 - PASS (tick)
  • 2000.6 DUALSTACK1: Add point intents between h3 and h11 - PASS (tick)
  • 2000.7 VLAN: Add point intents between h5 and h21 - PASS (tick)
  • 2000.8 1HOP: Add point intents between h1 and h3 - PASS (tick)

Case 3000: Single to Multi Point Intents Test - 3 NODE(S) - OF 1.0 - Using Flow Objectives -

...

FAIL

This test case will test single point to multi point intents using 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.0 OVS running in Mininet and compile intents using Flow Objectives

  • 3000.1 NOOPTION: Install and test single point to multi point intents - PASS (tick)
  • 3000.2 IPV4: Install and test single point to multi point intents - PASS (tick)
  • 3000.3 IPV4_2: Add single point to multi point intents - PASS (tick)
  • 3000.4 VLAN: Add single point to multi point intents - PASS (tick)
  • 3000.5 VLAN: Add single point to multi point intents - PASS (tick)FAIL (error)
    • Assertion results for single to multi point intent with VLAN treatment
    • Initial Intent State Passed
    • Initial Flow State Passed
    • Initial Ping Passed
    • Bad Sender Ping Passed
    • Bad Recipient Ping Passed
    • Link Down Passed
    • Link Down Intent State Passed
    • Link Down Flow State Passed
    • Link Down Topology State Passed
    • Link Down Pingall Failed
    • Link Up Passed
    • Link Up Intent State Passed
    • Link Up Flow State Passed
    • Link Up Topology State Passed
    • Link Up Scapy Packet Recieved Failed
    • Remove Intents Passed

Case 5000: Test host mobility with host intents - PASS

  • 5000.1 Testing host mobility by moving h1 from s5 to s6 - PASS (tick)
  • 5000.2 IPV4: Add host intents between h1 and h9 - PASS (tick)

Case 18: Stop Mininet and Scapy - PASS

Stopping the current mininet topology to start up fresh

  • 18.1 Stopping and Removing Scapy Host Components - PASS (tick)
  • 18.2 Stopping Mininet - PASS (tick)

Case 19: Copy karaf logs - PASS

Copying the karaf logs to preserve them throughreinstalling ONOS

  • 19.1 Copying karaf logs - PASS (tick)

Case 2: Starting up 1 node(s) ONOS cluster - PASS

Set up ONOS with 1 node(s) ONOS cluster

  • 2.1 Apply cell to environment - PASS (tick)
  • 2.2 Uninstalling ONOS package - PASS (tick)
  • 2.3 Creating ONOS package - PASS (tick)
  • 2.4 Installing ONOS package - PASS (tick)
  • 2.5 Set up ONOS secure SSH - PASS (tick)
  • 2.6 Checking ONOS service - PASS (tick)
  • 2.7 Starting ONOS CLI sessions - PASS (tick)

Case 11: Start Mininet topology with OF 1.3 switches - PASS

Start mininet topology with OF 1.3 switches to test intents, exits out if topology did not start correctly

  • 11.1 Starting Mininet topology with OF 1.3 switches - PASS (tick)

Case 12: Assign switches to controllers - PASS

Assign OF 1.3 switches to ONOS nodes

  • 12.1 Assigning switches to controllers - PASS (tick)

Case 13: Create scapy components - PASS

  • 13.1 Create scapy components - No Result (warning)
  • 13.2 Start scapy components - PASS (tick)

Case 15: Discover all hosts using scapy - PASS

  • 15.1 Send packets from each host to the first host and confirm onos discovery - PASS (tick)
  • 15.2 Populate hostsData - PASS (tick)

Case 16: Balance mastership of switches - PASS

  • 16.1 Balancing mastership of switches - PASS (tick)

Case 1000: Host Intents Test - 1 NODE(S) - OF 1.3 - Using Flow Rules - PASS

This test case tests Host intents using 1 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet and compile intents using Flow Rules

  • 1000.1 IPV4: Add and test host intents between h1 and h9 - PASS (tick)
  • 1000.2 DUALSTACK1: Add host intents between h3 and h11 - PASS (tick)
  • 1000.3 DUALSTACK2: Add host intents between h1 and h11 - PASS (tick)
  • 1000.4 1HOP: Add host intents between h1 and h3 - PASS (tick)
  • 1000.5 VLAN1: Add vlan host intents between h4 and h12 - PASS (tick)
  • 1000.6 Confirm that ONOS leadership is unchanged - PASS (tick)

Case 2000: Point Intents Test - 1 NODE(S) - OF 1.3 - Using Flow Rules - PASS

This test case will test point to point intents using 1 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet and compile intents using Flow Rules

  • 2000.1 NOOPTION: Add point intents between h1 and h9 - PASS (tick)
  • 2000.2 IPV4: Add point intents between h1 and h9 - PASS (tick)
  • 2000.3 IPV4_2: Add point intents between h1 and h9 - PASS (tick)
  • 2000.4 SDNIP-ICMP: Add point intents between h1 and h9 - PASS (tick)
  • 2000.5 SDNIP-TCP: Add point intents between h1 and h9 - PASS (tick)
  • 2000.6 DUALSTACK1: Add point intents between h3 and h11 - PASS (tick)
  • 2000.7 VLAN: Add point intents between h5 and h21 - PASS (tick)
  • 2000.8 1HOP: Add point intents between h1 and h3 - PASS (tick)

Case 3000: Single to Multi Point Intents Test - 1 NODE(S) - OF 1.3 - Using Flow Rules - PASS

This test case will test single point to multi point intents using 1 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet and compile intents using Flow Rules

  • 3000.1 NOOPTION: Install and test single point to multi point intents - PASS (tick)
  • 3000.2 IPV4: Install and test single point to multi point intents - PASS (tick)
  • 3000.3 IPV4_2: Add single point to multi point intents - PASS (tick)
  • 3000.4 VLAN: Add single point to multi point intents - PASS (tick)
  • 3000.5 VLAN: Add single point to multi point intents - PASS (tick)

Case 5000: Test host mobility with host intents - PASS

  • 5000.1 Testing host mobility by moving h1 from s5 to s6 - PASS (tick)
  • 5000.2 IPV4: Add host intents between h1 and h9 - PASS (tick)

Case 18: Stop Mininet and Scapy - PASS

Stopping the current mininet topology to start up fresh

  • 18.1 Stopping and Removing Scapy Host Components - PASS (tick)
  • 18.2 Stopping Mininet - PASS (tick)

Case 19: Copy karaf logs - PASS

Copying the karaf logs to preserve them throughreinstalling ONOS

  • 19.1 Copying karaf logs - PASS (tick)

Case 2: Starting up

...

3 node(s) ONOS cluster - PASS

Set up ONOS with 1 3 node(s) ONOS cluster

  • 2.1 Apply cell to environment - PASS (tick)
  • 2.2 Uninstalling ONOS package - PASS (tick)
  • 2.3 Creating ONOS package - PASS (tick)
  • 2.4 Installing ONOS package - PASS (tick)
  • 2.5 Set up ONOS secure SSH - PASS (tick)
  • 2.6 Checking ONOS service - PASS (tick)
  • 2.7 Starting ONOS CLI sessions - PASS (tick)

Case 11: Start Mininet topology with OF 1.3 switches - PASS

Start mininet topology with OF 1.3 switches to test intents, exits out if topology did not start correctly

  • 11.1 Starting Mininet topology with OF 1.3 switches - PASS (tick)

Case 12: Assign switches to controllers - PASS

Assign OF 1.3 switches to ONOS nodes

  • 12.1 Assigning switches to controllers - PASS (tick)

Case 13: Create scapy components - PASS

  • 13.1 Create scapy components - No Result (warning)
  • 13.2 Start scapy components - PASS (tick)

Case 15: Discover all hosts using scapy - PASS

  • 15.1 Send packets from each host to the first host and confirm onos discovery - PASS (tick)
  • 15.2 Populate hostsData - PASS (tick)

Case 16: Balance mastership of switches - PASS

  • 16.1 Balancing mastership of switches - PASS (tick)

Case 1000: Host Intents Test -

...

3 NODE(S) - OF 1.3 - Using Flow Rules - PASS

This test case tests Host intents using 1 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet and compile intents using Flow Rules

  • 1000.1 IPV4: Add and test host intents between h1 and h9 - PASS (tick)
  • 1000.2 DUALSTACK1: Add host intents between h3 and h11 - PASS (tick)
  • 1000.3 DUALSTACK2: Add host intents between h1 and h11 - PASS (tick)
  • 1000.4 1HOP: Add host intents between h1 and h3 - PASS (tick)
  • 1000.5 VLAN1: Add vlan host intents between h4 and h12 - PASS (tick)
  • 1000.6 Confirm that ONOS leadership is unchanged - PASS (tick)

Case 2000: Point Intents Test -

...

3 NODE(S) - OF 1.3 - Using Flow Rules - PASS

This test case will test point to point intents using 1 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet and compile intents using Flow Rules

  • 2000.1 NOOPTION: Add point intents between h1 and h9 - PASS (tick)
  • 2000.2 IPV4: Add point intents between h1 and h9 - PASS (tick)
  • 2000.3 IPV4_2: Add point intents between h1 and h9 - PASS (tick)
  • 2000.4 SDNIP-ICMP: Add point intents between h1 and h9 - PASS (tick)
  • 2000.5 SDNIP-TCP: Add point intents between h1 and h9 - PASS (tick)
  • 2000.6 DUALSTACK1: Add point intents between h3 and h11 - PASS (tick)
  • 2000.7 VLAN: Add point intents between h5 and h21 - PASS (tick)
  • 2000.8 1HOP: Add point intents between h1 and h3 - PASS (tick)

Case 3000: Single to Multi Point Intents Test -

...

3 NODE(S) - OF 1.3 - Using Flow Rules - PASS

This test case will test single point to multi point intents using 1 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet and compile intents using Flow Rules

  • 3000.1 NOOPTION: Install and test single point to multi point intents - PASS (tick)
  • 3000.2 IPV4: Install and test single point to multi point intents - PASS (tick)
  • 3000.3 IPV4_2: Add single point to multi point intents - PASS (tick)
  • 3000.4 VLAN: Add single point to multi point intents - PASS (tick)
  • 3000.5 VLAN: Add single point to multi point intents - PASS (tick)

Case 5000: Test host mobility with host intents - PASS

  • 5000.1 Testing host mobility by moving h1 from s5 to s6 - PASS (tick)
  • 5000.2 IPV4: Add host intents between h1 and h9 - PASS (tick)

Case 18: Stop Mininet and Scapy - PASS

Stopping the current mininet topology to start up fresh

  • 18.1 Stopping and Removing Scapy Host Components - PASS (tick)
  • 18.2 Stopping Mininet - PASS (tick)

Case 19: Copy karaf logs - PASS

Copying the karaf logs to preserve them throughreinstalling ONOS

  • 19.1 Copying karaf logs - PASS (tick)

Case 2: Starting up

...

1 node(s) ONOS cluster - PASS

Set up ONOS with 3 1 node(s) ONOS cluster

  • 2.1 Apply cell to environment - PASS (tick)
  • 2.2 Uninstalling ONOS package - PASS (tick)
  • 2.3 Creating ONOS package - PASS (tick)
  • 2.4 Installing ONOS package - PASS (tick)
  • 2.5 Set up ONOS secure SSH - PASS (tick)
  • 2.6 Checking ONOS service - PASS (tick)
  • 2.7 Starting ONOS CLI sessions - PASS (tick)

Case 11: Start Mininet topology with OF 1.3 switches - PASS

Start mininet topology with OF 1.3 switches to test intents, exits out if topology did not start correctly

  • 11.1 Starting Mininet topology with OF 1.3 switches - PASS (tick)

Case 12: Assign switches to controllers - PASS

Assign OF 1.3 switches to ONOS nodes

  • 12.1 Assigning switches to controllers - PASS (tick)

Case 13: Create scapy components - PASS

  • 13.1 Create scapy components - No Result (warning)
  • 13.2 Start scapy components - PASS (tick)

Case 15: Discover all hosts using scapy - PASS

  • 11.1 Starting Mininet topology with OF 1.3 switches
  • 15.1 Send packets from each host to the first host and confirm onos discovery - PASS (tick)
  • 15.2 Populate hostsData - PASS (tick)

Case

...

12:

...

Assign switches to controllers - PASS

Assign OF 1.3 switches to ONOS nodes

  • 12 16.1 Balancing mastership of Assigning switches to controllers - PASS (tick)

Case

...

13: Create scapy components - PASS

  • 13.1 Create scapy components - No Result (warning)
  • 13.2 Start scapy components - PASS (tick)

Case 15: Discover all hosts using scapy - PASS

  • 15.1 Send packets from each host to the first host and confirm onos discovery - PASS (tick)
  • 15.2 Populate hostsData - PASS (tick)

Case 16: Balance mastership of switches - PASS

  • 16.1 Balancing mastership of switches - PASS (tick)

Case 17: Enable intent compilation using Flow Objectives - PASS

  • 17.1 Enabling Flow Objectives - PASS (tick)

Case 1000: Host Intents Test - 1

This test case tests Host intents using 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet and compile intents using Flow Rules

  • 1000.1 IPV4: Add and test host intents between h1 and h9 - PASS (tick)
  • 1000.2 DUALSTACK1: Add host intents between h3 and h11 - PASS (tick)
  • 1000.3 DUALSTACK2: Add host intents between h1 and h11 - PASS (tick)
  • 1000.4 1HOP: Add host intents between h1 and h3 - PASS (tick)
  • 1000.5 VLAN1: Add vlan host intents between h4 and h12 - PASS (tick)
  • 1000.6 Confirm that ONOS leadership is unchanged - PASS (tick)

...

NODE(S) - OF 1.3 - Using Flow

...

Objectives - PASS

This test case will test point to point tests Host intents using 3 1 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet and compile intents using Flow RulesObjectives

  • 2000 1000.1 NOOPTION: Add point intents between h1 and h9 - PASS (tick) 2000.2 IPV4: Add point intents between h1 and h9 - PASS (tick)
  • 2000.3 IPV4_2: Add point intents between h1 and h9 - PASS (tick)
  • 2000.4 SDNIP-ICMP: Add point intents between h1 and h9 - PASS (tick)
  • 2000.5 SDNIP-TCP: Add point and test host intents between h1 and h9 - PASS (tick)
  • 2000 1000.6 2 DUALSTACK1: Add point host intents between h3 and h11 - PASS (tick) 2000
  • 1000.7 VLAN3 DUALSTACK2: Add point host intents between h5 h1 and h21 h11 - PASS (tick)
  • 2000 1000.8 4 1HOP: Add point host intents between h1 and h3 - PASS (tick)
  • 1000.5 VLAN1: Add vlan host intents between h4 and h12 - PASS (tick)

...

  • 1000.6 Confirm that ONOS leadership is unchanged - PASS (tick)

Case 2000: Point Intents Test -

...

1 NODE(S) - OF 1.3 - Using Flow

...

Objectives - PASS

This test case will test single point to multi point intents using 3 1 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet and compile intents using Flow RulesObjectives

  • 3000 2000.1 NOOPTION: Install and test single point to multi Add point intents between h1 and h9 - PASS (tick) 3000
  • 2000.2 IPV4: Install and test single point to multi point intents Add point intents between h1 and h9 - PASS (tick)
  • 3000 2000.3 IPV4_2: Add single point to multi point intents intents between h1 and h9 - PASS (tick) 3000
  • 2000.4 VLANSDNIP-ICMP: Add single point to multi point intents between h1 and h9 - PASS (tick) 3000
  • 2000.5 VLANSDNIP-TCP: Add single point to multi point intents - PASS (tick)

Case 5000: Test host mobility with host intents - PASS

  • 5000.1 Testing host mobility by moving h1 from s5 to s6 - PASS (tick)
  • 5000.2 IPV4: Add host intents between h1 and h9 - PASS (tick)

Case 18: Stop Mininet and Scapy - PASS

Stopping the current mininet topology to start up fresh

  • 2000.6 DUALSTACK1: Add point intents between h3 and h11 - PASS (tick)
  • 2000.7 VLAN: Add point intents between h5 and h21 18.1 Stopping and Removing Scapy Host Components - PASS (tick) 18.2 Stopping Mininet
  • 2000.8 1HOP: Add point intents between h1 and h3 - PASS (tick)

Case

...

3000: Single to Multi Point Intents Test - 1 NODE(S) - OF 1.3 - Using Flow Objectives - PASS

This test case will test single point to multi point intents using

Copying the karaf logs to preserve them throughreinstalling ONOS

  • 19.1 Copying karaf logs - PASS (tick)

Case 2: Starting up 1 node(s) ONOS cluster - PASS

Set up ONOS with 1 node(s) ONOS cluster

  • 2.1 Apply cell to environment - PASS (tick)
  • 2.2 Uninstalling ONOS package - PASS (tick)
  • 2.3 Creating ONOS package - PASS (tick)
  • 2.4 Installing ONOS package - PASS (tick)
  • 2.5 Set up ONOS secure SSH - PASS (tick)
  • 2.6 Checking ONOS service - PASS (tick)
  • 2.7 Starting ONOS CLI sessions - PASS (tick)

Case 11: Start Mininet topology with OF 1.3 switches - PASS

Start mininet topology with OF 1.3 switches to test intents, exits out if topology did not start correctly

  • 11.1 Starting Mininet topology with OF 1.3 switches - PASS (tick)

Case 12: Assign switches to controllers - PASS

Assign OF 1.3 switches to ONOS nodes

  • 12.1 Assigning switches to controllers - PASS (tick)

Case 13: Create scapy components - PASS

  • 13.1 Create scapy components - No Result (warning)
  • 13.2 Start scapy components - PASS (tick)

Case 15: Discover all hosts using scapy - PASS

  • 15.1 Send packets from each host to the first host and confirm onos discovery - PASS (tick)
  • 15.2 Populate hostsData - PASS (tick)

Case 16: Balance mastership of switches - PASS

  • 16.1 Balancing mastership of switches - PASS (tick)

Case 17: Enable intent compilation using Flow Objectives - PASS

  • 17.1 Enabling Flow Objectives - PASS (tick)

Case 1000: Host Intents Test - 1 NODE(S) - OF 1.3 - Using Flow Objectives - PASS

This test case tests Host intents using 1 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet and compile intents using Flow Objectives

  • 1000.1 IPV4: Add and test host intents between h1 and h9 - PASS (tick)
  • 1000.2 DUALSTACK1: Add host intents between h3 and h11 - PASS (tick)
  • 1000.3 DUALSTACK2: Add host intents between h1 and h11 - PASS (tick)
  • 1000.4 1HOP: Add host intents between h1 and h3 - PASS (tick)
  • 1000.5 VLAN1: Add vlan host intents between h4 and h12 - PASS (tick)
  • 1000.6 Confirm that ONOS leadership is unchanged - PASS (tick)

Case 2000: Point Intents Test - 1 NODE(S) - OF 1.3 - Using Flow Objectives - PASS

This test case will test point to point intents using 1 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet and compile intents using Flow Objectives

  • 2000.1 NOOPTION: Add point intents between h1 and h9 - PASS (tick)
  • 2000.2 IPV4: Add point intents between h1 and h9 - PASS (tick)
  • 2000.3 IPV4_2: Add point intents between h1 and h9 - PASS (tick)
  • 2000.4 SDNIP-ICMP: Add point intents between h1 and h9 - PASS (tick)
  • 2000.5 SDNIP-TCP: Add point intents between h1 and h9 - PASS (tick)
  • 2000.6 DUALSTACK1: Add point intents between h3 and h11 - PASS (tick)
  • 2000.7 VLAN: Add point intents between h5 and h21 - PASS (tick)
  • 2000.8 1HOP: Add point intents between h1 and h3 - PASS (tick)

...

cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet and compile intents using Flow Objectives

  • 3000.1 NOOPTION: Install and test single point to multi point intents - PASS (tick)
  • 3000.2 IPV4: Install and test single point to multi point intents - PASS (tick)
  • 3000.3 IPV4_2: Add single point to multi point intents - PASS (tick)
  • 3000.4 VLAN: Add single point to multi point intents - PASS (tick)
  • 3000.5 VLAN: Add single point to multi point intents - PASS (tick)

Case 5000: Test host mobility with host intents - PASS

  • 5000.1 Testing host mobility by moving h1 from s5 to s6 - PASS (tick)
  • 5000.2 IPV4: Add host intents between h1 and h9 - PASS (tick)

Case 18: Stop Mininet and Scapy - PASS

Stopping the current mininet topology to start up fresh

  • 18.1 Stopping and Removing Scapy Host Components - PASS (tick)
  • 18.2 Stopping Mininet - PASS (tick)

Case 19: Copy karaf logs - PASS

Copying the karaf logs to preserve them throughreinstalling ONOS

  • 19.1 Copying karaf logs - PASS (tick)

Case 2: Starting up 3 node(s) ONOS cluster - PASS

Set up ONOS with 3 node(s) ONOS cluster

  • 2.1 Apply cell to environment - PASS (tick)
  • 2.2 Uninstalling ONOS package - PASS (tick)
  • 2.3 Creating ONOS package - PASS (tick)
  • 2.4 Installing ONOS package - PASS (tick)
  • 2.5 Set up ONOS secure SSH - PASS (tick)
  • 2.6 Checking ONOS service - PASS (tick)
  • 2.7 Starting ONOS CLI sessions - PASS (tick)

Case 11: Start Mininet topology with OF 1.3 switches - PASS

Start mininet topology with OF 1.3 switches to test intents, exits out if topology did not start correctly

  • 11.1 Starting Mininet topology with OF 1.3 switches - PASS (tick)

Case 12: Assign switches to controllers - PASS

Assign OF 1.3 switches to ONOS nodes

  • 12.1 Assigning switches to controllers - PASS (tick)

Case 13: Create scapy components - PASS

  • 13.1 Create scapy components - No Result (warning)
  • 13.2 Start scapy components - PASS (tick)

Case 15: Discover all hosts using scapy - PASS

  • 15.1 Send packets from each host to the first host and confirm onos discovery - PASS (tick)
  • 15.2 Populate hostsData - PASS (tick)

Case 16: Balance mastership of switches - PASS

  • 16.1 Balancing mastership of switches - PASS (tick)

Case 17: Enable intent compilation using Flow Objectives - PASS

  • 17.1 Enabling Flow Objectives - PASS (tick)

Case 1000: Host Intents Test - 3 NODE(S) - OF 1.3 - Using Flow Objectives - PASS

This test case will test single point to multi point tests Host intents using 1 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet and compile intents using Flow Objectives

  • 3000.1 NOOPTION: Install and test single point to multi point intents - PASS (tick)
  • 3000.2 IPV4: Install and test single point to multi point intents - PASS (tick)
  • 3000.3 IPV4_2: Add single point to multi point intents - PASS (tick)
  • 3000.4 VLAN: Add single point to multi point intents - PASS (tick)
  • 3000.5 VLAN: Add single point to multi point intents - PASS (tick)

Case 5000: Test host mobility with host intents - PASS

IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet and compile intents using Flow Objectives

  • 1000.1 IPV4: Add and test host intents between h1 and h9 - PASS (tick)
  • 1000.2 DUALSTACK1: Add host intents between h3 and h11 - PASS (tick)
  • 1000.3 DUALSTACK2
  • 5000.1 Testing host mobility by moving h1 from s5 to s6 - PASS (tick)
  • 5000.2 IPV4: Add host intents between h1 and h9 h11 - PASS (tick)

Case 18: Stop Mininet and Scapy - PASS

Stopping the current mininet topology to start up fresh

  • 1000.4 1HOP: Add host intents between h1 and h3 - PASS (tick)
  • 1000.5 VLAN1: Add vlan host intents between h4 and h12 - PASS (tick)
  • 1000.6 Confirm that ONOS leadership is unchanged
  • 18.1 Stopping and Removing Scapy Host Components - PASS (tick)
  • 18.2 Stopping Mininet - PASS (tick)

Case

...

Copying the karaf logs to preserve them throughreinstalling ONOS

  • 19.1 Copying karaf logs - PASS (tick)

...

2000: Point Intents Test - 3 NODE(S) - OF 1.3 - Using Flow Objectives - PASS

This test case will test point to point intents using 3 node(s)

...

cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet and compile intents using Flow Objectives

  • 2000.1 NOOPTION: Add point intents between h1 and h9

Set up ONOS with 3 node(s) ONOS cluster

  • 2.1 Apply cell to environment - PASS (tick) 2
  • 2000.2 Uninstalling ONOS package IPV4: Add point intents between h1 and h9 - PASS (tick) 2
  • 2000.3 Creating ONOS package - PASS (tick)
  • 2.4 Installing ONOS package - PASS (tick)
  • 2.5 Set up ONOS secure SSH IPV4_2: Add point intents between h1 and h9 - PASS (tick) 2.6 Checking ONOS service
  • 2000.4 SDNIP-ICMP: Add point intents between h1 and h9 - PASS (tick)
  • 2.7 Starting ONOS CLI sessions - PASS (tick)

Case 11: Start Mininet topology with OF 1.3 switches - PASS

Start mininet topology with OF 1.3 switches to test intents, exits out if topology did not start correctly

  • 11.1 Starting Mininet topology with OF 1.3 switches - PASS (tick)

Case 12: Assign switches to controllers - PASS

Assign OF 1.3 switches to ONOS nodes

  • 2000.5 SDNIP-TCP: Add point intents between h1 and h9 - PASS (tick)
  • 2000.6 DUALSTACK1: Add point intents between h3 and h11 - PASS (tick)
  • 2000.7 VLAN: Add point intents between h5 and h21 - PASS (tick)
  • 2000.8 1HOP: Add point intents between h1 and h3 12.1 Assigning switches to controllers - PASS (tick)

Case

...

3000: Single to Multi Point Intents Test - 3 NODE(S) - OF 1.3 - Using Flow Objectives - PASS

This test case will test single point to multi point intents using 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet and compile intents using Flow Objectives

  • 3000.1 NOOPTION: Install and test single point to multi point intents - PASS (tick)
  • 3000.2 IPV4: Install and test single point to multi point intents - PASS (tick)
  • 3000.3 IPV4_2: Add single point to multi point intents - PASS (tick)
  • 3000.4 VLAN: Add single point to multi point intents - PASS (tick)
  • 3000.5 VLAN: Add single point to multi point intents - PASS (tick)

Case 5000: Test host mobility with host intents - PASS

  • 5000.1 Testing host mobility by moving h1 from s5 to s6 - PASS (tick)
  • 5000.2 IPV4: Add host intents between h1 and h9 - PASS (tick)
  • 13.1 Create scapy components - No Result (warning)
  • 13.2 Start scapy components - PASS (tick)

Case 15: Discover all hosts using scapy - FAIL

  • 15.1 Send packets from each host to the first host and confirm onos discovery - FAIL (error)
    • ONOS incorrectly discovered hosts
    • Skipping the rest of this case.

Case 16: - FAIL

    • Skipping the rest of this case.

Case 17: - FAIL

    • Skipping the rest of this case.

Case 1000: - FAIL

    • Skipping the rest of this case.

Case 2000: - FAIL

    • Skipping the rest of this case.

Case 3000: - FAIL

    • Skipping the rest of this case.

Case 5000: - FAIL

    Skipping the rest of this case.

Case 18: Stop Mininet and Scapy - PASS

...