Due to a ransomware attack, the wiki was reverted to a July 2022 version. . We apologize for the lack of a more recent valid backup.
...
HTML |
---|
<img src="https://jenkins.onosproject.org/view/QA/job/postjob-Fabric/lastSuccessfulBuild/artifact/SRDhcprelay_master_20-builds_graph.jpg", alt="SRDhcprelay", style="width:525px;height:350px;border:0"> |
commit 4d5c5c3fab0ce67dfb0f698f391ba5e7a3df4f02 f853a59d2e10db978a3b10b69ccb9942bd6a12fd (HEAD -] master, origin/master, origin/HEAD)
Author: Jian Li Devin Lim [pyguni@gmaildevin@opennetworking.comorg]
AuthorDate: Mon Fri Apr 2 166 18:3821:18 11 2018 +0900-0700
Commit: Jian Li [pyguni@gmail.comYuta HIGUCHI [y-higuchi@opennetworking.org]
CommitDate: Wed Sat Apr 4 137 01:3921:57 32 2018 +0000
Refactor: simplify setoutput port to controller using punt method
Revert back to the way group capable was checking to handle null
Case 1: DHCP v4 tests with 4 clients attached to switch directly and 1 server attached to switch directly, with 3 ONOS instances - PASS
...
- 2.1 Apply cell to environment - PASS
- 2.2 Uninstalling ONOS package - PASS
- 2.3 Installing ONOS package - PASS
- 2.4 Set up ONOS secure SSH - PASS
- 2.5 Checking ONOS service - PASS
- 2.6 Starting ONOS CLI sessions - PASS
- 2.7 Starting Mininet Topology - PASS
- 2.8 Verify host IP address assignment in ONOS - PASS
- 2.9 Verify IP address assignment from hosts - PASS
- 2.10 Stopping Mininet - PASS
- 2.11 Copying karaf logs - PASS
Case 11: DHCP v6 tests with 4 clients attached to switch directly and 1 server attached to switch directly, with 3 ONOS instances -
...
FAIL
- 11.1 Apply cell to environment - PASS
- 11.2 Uninstalling ONOS package - PASS
- 11.3 Installing ONOS package - PASS
- 11.4 Set up ONOS secure SSH - PASS
- 11.5 Checking ONOS service - PASS
- 11.6 Starting ONOS CLI sessions - PASS
- 11.7 Starting Mininet Topology - PASS
- 11.8 Verify host IP address assignment in ONOS - PASS FAIL
- Verify ONOS host IP failed
- 11.9 Verify IP address assignment from hosts - PASS FAIL
- Verify network host IP failed
- 11.10 Stopping Mininet - PASS
- 11.11 Copying karaf logs - PASS
...
- 41.1 Apply cell to environment - PASS
- 41.2 Uninstalling ONOS package - PASS
- 41.3 Installing ONOS package - PASS
- 41.4 Set up ONOS secure SSH - PASS
- 41.5 Checking ONOS service - PASS
- 41.6 Starting ONOS CLI sessions - PASS
- 41.7 Starting Mininet Topology - PASS
- 41.8 Verify host IP address assignment in ONOS - PASS
- 41.9 Verify IP address assignment from hosts - PASS
- 41.10 Stopping Mininet - PASS
- 41.11 Copying karaf logs - PASS
Case 51: DHCP v6 tests with dual-homed hosts: 4 clients attached to switch directly and 1 server attached to switch directly, with 3 ONOS instances -
...
PASS
- 51.1 Apply cell to environment - PASS
- 51.2 Uninstalling ONOS package - PASS
- 51.3 Installing ONOS package - PASS
- 51.4 Set up ONOS secure SSH - PASS
- 51.5 Checking ONOS service - PASS
- 51.6 Starting ONOS CLI sessions - PASS
- 51.7 Starting Mininet Topology - PASS
- 51.8 Verify host IP address assignment in ONOS - FAIL Verify ONOS host IP failed
- PASS
- 51.9 Verify IP address assignment from hosts - PASS
- 51.10 Stopping Mininet - PASS
- 51.11 Copying karaf logs - PASS
...