Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: Published from Jenkins build: https://jenkins.onosproject.org/job/FUNC-pipeline-master/1237/

...

HTML
<img src="https://jenkins.onosproject.org/view/QA/job/postjob-VM/lastSuccessfulBuild/artifact/FUNCintentRest_master_20-builds_graph.jpg", alt="FUNCintentRest", style="width:525px;height:350px;border:0">

commit 59cf0c877c74f0bd08d826dd8d1eb759a5014e33 4bf427f58aa30770272a3ccccfaf218fe4c7f8a8 (HEAD -] master, origin/master, origin/HEAD)
Author: Yuta HIGUCHI [y-higuchi@ak.jp.nec.comCarmelo Cascone [carmelo@opennetworking.org]
AuthorDate: Wed May Tue Jun 19 23 14:1623:59 32 2018 -0700+0200
Commit: Yuta HIGUCHI [y-higuchi@opennetworkingCarmelo Cascone [carmelo@opennetworking.org]
CommitDate: Thu Tue Jun 14 1619 21:0447:29 16 2018 +0000
Update dependencies
Recompiled P4 tutorial pipeconf to work with new P4 tools revisions

Case 1: Pull onos branch and build onos on Teststation. - PASS

...

  • 17.1 Enabling Flow Objectives - PASS (tick)

Case 1000: Host Intents Test - 3 NODE(S) - OF 1.0 - Using Flow Objectives -

...

FAIL

This test case tests Host intents using 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.0 OVS running in Mininet and compile intents using Flow Objectives

  • 1000.1 IPV4: Add and test host intents between h1 and h9 - PASS (tick)FAIL (error)
    • Assertion result for IPV4 host intent with mac addresses
    • Install Intent State Passed
    • Flow duration check Passed
    • Initial Intent State Passed
    • Initial Flow State Passed
    • Initial Ping Failed
    • Link Down Passed
    • Link Down Intent State Passed
    • Link Down Flow State Passed
    • Link Down Topology State Passed
    • Link Down Pingall Passed
    • Link Up Passed
    • Link Up Intent State Passed
    • Link Up Flow State Passed
    • Link Up Topology State Passed
    • Link Up Pingall Passed
    • Remove Intents Passed
  • 1000.2 DUALSTACK1: Add host intents between h3 and h11 - PASS (tick)
  • 1000.3 DUALSTACK2: Add host intents between h1 and h11 - PASS (tick)
  • 1000.4 1HOP: Add host intents between h1 and h3 - PASS (tick)
  • 1000.5 VLAN1: Add vlan host intents between h4 and h12 - PASS (tick)
  • 1000.6 Confirm that ONOS leadership is unchanged - PASS (tick)

...