Due to a ransomware attack, the wiki was reverted to a July 2022 version. . We apologize for the lack of a more recent valid backup.
...
HTML |
---|
<img src="https://jenkins.onosproject.org/view/QA/job/postjob-Fabric4/lastSuccessfulBuild/artifact/SRDhcprelay_master_20-builds_graph.jpg", alt="SRDhcprelay", style="width:525px;height:350px;border:0"> |
commit e3141545bae9480dc9f7a7158f8cc1d55912b121 7981a32f37d64225a5b641725ba172cdc32e2f0d (HEAD -] master, origin/master, origin/HEAD)
Author: Jian Li Ray Milkey [pyguni@gmailray@opennetworking.comorg]
AuthorDate: Mon Thu Aug 13 1816 14:0555:43 46 2018 +0900-0700
Commit: Jian Li Ray Milkey [pyguni@gmailray@opennetworking.comorg]
CommitDate: Thu Aug 16 0123:5852:10 44 2018 +0000
Auto-generate an intg-bridge ID if it is not specified via net-cfg
Fix NPE when component can't be found
Case 1: DHCP v4 tests with 4 clients attached to switch directly and 1 server attached to switch directly, with 3 ONOS instances - PASS
...
- 2.1 Apply cell to environment - PASS
- 2.2 Uninstalling Atomix - PASS
- 2.3 Uninstalling ONOS package - PASS
- 2.4 Installing Atomix - PASS
- 2.5 Installing ONOS package - PASS
- 2.6 Set up ONOS secure SSH - PASS
- 2.7 Checking ONOS service - PASS
- 2.8 Starting ONOS CLI sessions - PASS
- 2.9 Checking ONOS nodes - PASS
- 2.10 Checking ONOS applications - PASS
- 2.11 Starting Mininet Topology - PASS
- 2.12 Verify host IP address assignment in ONOS - PASS
- 2.13 Verify IP address assignment from hosts - PASS
- 2.14 Stopping Mininet - PASS
- 2.15 Copying karaf logs - PASS
Case 11: DHCP v6 tests with 4 clients attached to switch directly and 1 server attached to switch directly, with 3 ONOS instances -
...
FAIL
- 11.1 Apply cell to environment - PASS
- 11.2 Uninstalling Atomix - PASS
- 11.3 Uninstalling ONOS package - PASS
- 11.4 Installing Atomix - PASS
- 11.5 Installing ONOS package - PASS
- 11.6 Set up ONOS secure SSH - PASS
- 11.7 Checking ONOS service - PASS
- 11.8 Starting ONOS CLI sessions - PASS
- 11.9 Checking ONOS nodes - PASS
- 11.10 Checking ONOS applications - PASS
- 11.11 Starting Mininet Topology - PASS
- 11.12 Verify host IP address assignment in ONOS - PASS 11.13 Verify IP address assignment from hosts - PASS FAIL
- Verify ONOS host IP failed
- 11.14 13 Stopping Mininet - PASS 11.15 Copying karaf logs - PASS
- Skipping the rest of this case.
Case 12: DHCP v6 tests with 4 clients attached to switch directly and 1 server attached to switch indirectly (via gateway), with 3 ONOS instances - FAIL
...