Due to a ransomware attack, the wiki was reverted to a July 2022 version. . We apologize for the lack of a more recent valid backup.
...
HTML |
---|
<img src="https://jenkins.onosproject.org/view/QA/job/postjob-Fabric3/lastSuccessfulBuild/artifact/SRRouting_onos-1.14_20-builds_graph.jpg", alt="SRRouting", style="width:525px;height:350px;border:0"> |
commit 44d8e1f269cfcaa63f0493f086a3d713a984e2bd 4ec2c16489377b1699037bdcf5ca6c19e27b15cc (HEAD -] onos-1.14, origin/onos-1.14)
Author: Ray Milkey Charles Chan [ray@opennetworkingrascov@gmail.orgcom]
AuthorDate: Fri Tue Nov 16 1527 21:1533:14 33 2018 -+0800
Commit: Ray Milkey Charles Chan [ray@opennetworkingrascov@gmail.orgcom]
CommitDate: Mon Nov Wed Dec 19 0815:5615:31 58 2018 -0800
Prevent NPE if an event comes in during start up
Address StackOverflow by offloading cache listener to a separate thread
Case 101: Test link failures with IPv4 hosts - PASS
...
- 101.1 Constructing test variables - PASS
- 101.2 Apply cell to environment - PASS
- 101.3 Uninstalling Atomix - PASS
- 101.4 Uninstalling ONOS package - PASS
- 101.5 Creating ONOS package - PASS
- 101.6 Installing Atomix - PASS
- 101.7 Installing ONOS package - PASS
- 101.8 Set up ONOS secure SSH - PASS
- 101.9 Checking ONOS service - PASS
- 101.10 Starting ONOS CLI sessions - PASS
- 101.11 Checking ONOS nodes - PASS
- 101.12 Checking ONOS applications - PASS
- 101.13 Starting Mininet Topology - PASS
- 101.14 Verify host IP address assignment in ONOS - PASS
- 101.15 Verify IP address assignment from hosts - PASS
- 101.16 Verify reachability of connected internal IPv4 hosts - PASS
- 101.17 Killing a batch of links [['spine103', 'spine101'], ['leaf2', 'spine101'], ['leaf3', 'spine101'], ['leaf4', 'spine101'], ['leaf5', 'spine101']] - PASS
- 101.18 Verify host IP address assignment in ONOS - PASS
- 101.19 Verify IP address assignment from hosts - PASS
- 101.20 Verify reachability of connected internal IPv4 hosts - PASS
- 101.21 Restoring a batch of links [['spine103', 'spine101'], ['leaf2', 'spine101'], ['leaf3', 'spine101'], ['leaf4', 'spine101'], ['leaf5', 'spine101']] - PASS
- 101.22 Verify host IP address assignment in ONOS - PASS
- 101.23 Verify IP address assignment from hosts - PASS
- 101.24 Verify reachability of connected internal IPv4 hosts - PASS
- 101.25 Killing a batch of links [['spine104', 'spine102'], ['leaf2', 'spine102'], ['leaf3', 'spine102'], ['leaf4', 'spine102'], ['leaf5', 'spine102']] - PASS
- 101.26 Verify host IP address assignment in ONOS - PASS
- 101.27 Verify IP address assignment from hosts - PASS
- 101.28 Verify reachability of connected internal IPv4 hosts - PASS
- 101.29 Restoring a batch of links [['spine104', 'spine102'], ['leaf2', 'spine102'], ['leaf3', 'spine102'], ['leaf4', 'spine102'], ['leaf5', 'spine102']] - PASS
- 101.30 Verify host IP address assignment in ONOS - PASS
- 101.31 Verify IP address assignment from hosts - PASS
- 101.32 Verify reachability of connected internal IPv4 hosts - PASS
- 101.33 Stopping Mininet - PASS
Case 102: Test link failures with IPv6 hosts -
...
FAIL
- 102.1 Apply cell to environment - PASS
- 102.2 Uninstalling Atomix - PASS
- 102.3 Uninstalling ONOS package - PASS
- 102.4 Installing Atomix - PASS
- 102.5 Installing ONOS package - PASS
- 102.6 Set up ONOS secure SSH - PASS
- 102.7 Checking ONOS service - PASS
- 102.8 Starting ONOS CLI sessions - PASS
- 102.9 Checking ONOS nodes - PASS
- 102.10 Checking ONOS applications - PASS
- 102.11 Starting Mininet Topology - PASS
- 102.12 Verify host IP address assignment in ONOS - PASS
- 102.13 Verify IP address assignment from hosts - PASS
- 102.14 Verify reachability of connected internal IPv6 hosts - PASS
- 102.15 Killing a batch of links [['spine103', 'spine101'], ['leaf2', 'spine101'], ['leaf3', 'spine101'], ['leaf4', 'spine101'], ['leaf5', 'spine101']] - PASS
- 102.16 Verify host IP address assignment in ONOS - PASS
- 102.17 Verify IP address assignment from hosts - PASS
- 102.18 Verify reachability of connected internal IPv6 hosts - PASS
- 102.19 Restoring a batch of links [['spine103', 'spine101'], ['leaf2', 'spine101'], ['leaf3', 'spine101'], ['leaf4', 'spine101'], ['leaf5', 'spine101']] - PASS
- 102.20 Verify host IP address assignment in ONOS - PASS
- 102.21 Verify IP address assignment from hosts - PASS
- 102.22 Verify reachability of connected internal IPv6 hosts - PASS
- 102.23 Killing a batch of links [['spine104', 'spine102'], ['leaf2', 'spine102'], ['leaf3', 'spine102'], ['leaf4', 'spine102'], ['leaf5', 'spine102']] - PASS
- 102.24 Verify host IP address assignment in ONOS - PASS
- 102.25 Verify IP address assignment from hosts - PASS
- 102.26 Verify reachability of connected internal IPv6 hosts - PASS
- 102.27 Restoring a batch of links [['spine104', 'spine102'], ['leaf2', 'spine102'], ['leaf3', 'spine102'], ['leaf4', 'spine102'], ['leaf5', 'spine102']] - PASS
- 102.28 Verify host IP address assignment in ONOS - PASS
- 102.29 Verify IP address assignment from hosts - PASS
- 102.30 Verify reachability of connected internal IPv6 hosts - PASS FAIL
- Verify reachability of connected internal IPv6 hosts: Fail
- 102.31 Stopping Mininet - PASS
- Skipping the rest of this case.
Case 103: Test link failures with IPv4 and IPv6 hosts -
...
FAIL
- 103.1 Apply cell to environment - PASS
- 103.2 Uninstalling Atomix - PASS
- 103.3 Uninstalling ONOS package - PASS
- 103.4 Installing Atomix - PASS
- 103.5 Installing ONOS package - PASS
- 103.6 Set up ONOS secure SSH - PASS
- 103.7 Checking ONOS service - PASS
- 103.8 Starting ONOS CLI sessions - PASS
- 103.9 Checking ONOS nodes - PASS
- 103.10 Checking ONOS applications - PASS
- 103.11 Starting Mininet Topology - PASS
- 103.12 Verify host IP address assignment in ONOS - PASS
- 103.13 Verify IP address assignment from hosts - PASS
- 103.14 Verify reachability of connected internal IPv4 hosts - PASS
- 103.15 Verify reachability of connected internal IPv6 hosts - PASS
- 103.16 Killing a batch of links [['spine103', 'spine101'], ['leaf2', 'spine101'], ['leaf3', 'spine101'], ['leaf4', 'spine101'], ['leaf5', 'spine101']] - PASS
- 103.17 Verify host IP address assignment in ONOS - PASS
- 103.18 Verify IP address assignment from hosts - PASS
- 103.19 Verify reachability of connected internal IPv4 hosts - PASS
- 103.20 Verify reachability of connected internal IPv6 hosts - PASS
- 103.21 Restoring a batch of links [['spine103', 'spine101'], ['leaf2', 'spine101'], ['leaf3', 'spine101'], ['leaf4', 'spine101'], ['leaf5', 'spine101']] - PASS
- 103.22 Verify host IP address assignment in ONOS - PASS
- 103.23 Verify IP address assignment from hosts - PASS
- 103.24 Verify reachability of connected internal IPv4 hosts - PASS
- 103.25 Verify reachability of connected internal IPv6 hosts - PASS
- 103.26 Killing a batch of links [['spine104', 'spine102'], ['leaf2', 'spine102'], ['leaf3', 'spine102'], ['leaf4', 'spine102'], ['leaf5', 'spine102']] - PASS
- 103.27 Verify host IP address assignment in ONOS - PASS
- 103.28 Verify IP address assignment from hosts - PASS
- 103.29 Verify reachability of connected internal IPv4 hosts - PASS 103.30 FAIL
- Verify reachability of connected internal
- 103.31 Restoring a batch of links [['spine104', 'spine102'], ['leaf2', 'spine102'], ['leaf3', 'spine102'], ['leaf4', 'spine102'], ['leaf5', 'spine102']] - PASS
- 103.32 Verify host IP address assignment in ONOS - PASS
- 103.33 Verify IP address assignment from hosts - PASS
- 103.34 Verify reachability of connected internal IPv4 hosts - PASS
- 103.35 Verify reachability of connected internal IPv6 hosts - PASS 103.36 Stopping Mininet - PASS
- IPv4 hosts: Fail
- 103.30 Stopping Mininet - PASS
- Skipping the rest of this case.
Case 104: Test link failures with IPv4 hosts including external hosts -
...
PASS
- 104.1 Apply cell to environment - PASS
- 104.2 Uninstalling Atomix - PASS
- 104.3 Uninstalling ONOS package - PASS
- 104.4 Installing Atomix - PASS
- 104.5 Installing ONOS package - PASS
- 104.6 Set up ONOS secure SSH - PASS
- 104.7 Checking ONOS service - PASS
- 104.8 Starting ONOS CLI sessions - PASS
- 104.9 Checking ONOS nodes - PASS
- 104.10 Checking ONOS applications - PASS
- 104.11 Starting Mininet Topology - PASS
- 104.12 Verify host IP address assignment in ONOS - PASS
- 104.13 Verify IP address assignment from hosts - PASS
- 104.14 Verify reachability of connected internal IPv4 hosts - PASS
- 104.15 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 104.16 Killing a batch of links [['spine103', 'spine101'], ['leaf2', 'spine101'], ['leaf3', 'spine101'], ['leaf4', 'spine101'], ['leaf5', 'spine101']] - PASS
- 104.17 Verify host IP address assignment in ONOS - PASS
- 104.18 Verify IP address assignment from hosts - PASS
- 104.19 Verify reachability of connected internal IPv4 hosts - PASS
- 104.20 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 104.21 Restoring a batch of links [['spine103', 'spine101'], ['leaf2', 'spine101'], ['leaf3', 'spine101'], ['leaf4', 'spine101'], ['leaf5', 'spine101']] - PASS
- 104.22 Verify host IP address assignment in ONOS - PASS
- 104.23 Verify IP address assignment from hosts - PASS
- 104.24 Verify reachability of connected internal IPv4 hosts - PASS
- 104.25 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 104.26 Killing a batch of links [['spine104', 'spine102'], ['leaf2', 'spine102'], ['leaf3', 'spine102'], ['leaf4', 'spine102'], ['leaf5', 'spine102']] - PASS
- 104.27 Verify host IP address assignment in ONOS - PASS
- 104.28 Verify IP address assignment from hosts - PASS
- 104.29 Verify reachability of connected internal IPv4 hosts - PASS
- 104.30 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 104.31 Restoring a batch of links [['spine104', 'spine102'], ['leaf2', 'spine102'], ['leaf3', 'spine102'], ['leaf4', 'spine102'], ['leaf5', 'spine102']] - PASS
- 104.32 Verify host IP address assignment in ONOS - PASS
- 104.33 Verify IP address assignment from hosts - PASS
- 104.34 Verify reachability of connected internal IPv4 hosts - FAIL PASS
- 104.35 Verify reachability of
- from connected internal IPv4 hosts : Fail
- to external IPv4 hosts - PASS
- 104.35 36 Stopping Mininet - PASS Skipping the rest of this case.
Case 105: Test link failures with IPv6 hosts including external hosts - PASS
...
- 105.1 Apply cell to environment - PASS
- 105.2 Uninstalling Atomix - PASS
- 105.3 Uninstalling ONOS package - PASS
- 105.4 Installing Atomix - PASS
- 105.5 Installing ONOS package - PASS
- 105.6 Set up ONOS secure SSH - PASS
- 105.7 Checking ONOS service - PASS
- 105.8 Starting ONOS CLI sessions - PASS
- 105.9 Checking ONOS nodes - PASS
- 105.10 Checking ONOS applications - PASS
- 105.11 Starting Mininet Topology - PASS
- 105.12 Verify host IP address assignment in ONOS - PASS
- 105.13 Verify IP address assignment from hosts - PASS
- 105.14 Verify reachability of connected internal IPv6 hosts - PASS
- 105.15 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 105.16 Killing a batch of links [['spine103', 'spine101'], ['leaf2', 'spine101'], ['leaf3', 'spine101'], ['leaf4', 'spine101'], ['leaf5', 'spine101']] - PASS
- 105.17 Verify host IP address assignment in ONOS - PASS
- 105.18 Verify IP address assignment from hosts - PASS
- 105.19 Verify reachability of connected internal IPv6 hosts - PASS
- 105.20 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 105.21 Restoring a batch of links [['spine103', 'spine101'], ['leaf2', 'spine101'], ['leaf3', 'spine101'], ['leaf4', 'spine101'], ['leaf5', 'spine101']] - PASS
- 105.22 Verify host IP address assignment in ONOS - PASS
- 105.23 Verify IP address assignment from hosts - PASS
- 105.24 Verify reachability of connected internal IPv6 hosts - PASS
- 105.25 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 105.26 Killing a batch of links [['spine104', 'spine102'], ['leaf2', 'spine102'], ['leaf3', 'spine102'], ['leaf4', 'spine102'], ['leaf5', 'spine102']] - PASS
- 105.27 Verify host IP address assignment in ONOS - PASS
- 105.28 Verify IP address assignment from hosts - PASS
- 105.29 Verify reachability of connected internal IPv6 hosts - PASS
- 105.30 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 105.31 Restoring a batch of links [['spine104', 'spine102'], ['leaf2', 'spine102'], ['leaf3', 'spine102'], ['leaf4', 'spine102'], ['leaf5', 'spine102']] - PASS
- 105.32 Verify host IP address assignment in ONOS - PASS
- 105.33 Verify IP address assignment from hosts - PASS
- 105.34 Verify reachability of connected internal IPv6 hosts - PASS
- 105.35 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 105.36 Stopping Mininet - PASS
Case 106: Test link failures with IPv4 and IPv6 hosts including external hosts -
...
PASS
- 106.1 Apply cell to environment - PASS
- 106.2 Uninstalling Atomix - PASS
- 106.3 Uninstalling ONOS package - PASS
- 106.4 Installing Atomix - PASS
- 106.5 Installing ONOS package - PASS
- 106.6 Set up ONOS secure SSH - PASS
- 106.7 Checking ONOS service - PASS
- 106.8 Starting ONOS CLI sessions - PASS
- 106.9 Checking ONOS nodes - PASS
- 106.10 Checking ONOS applications - PASS
- 106.11 Starting Mininet Topology - PASS
- 106.12 Verify host IP address assignment in ONOS - PASS
- 106.13 Verify IP address assignment from hosts - PASS
- 106.14 Verify reachability of connected internal IPv4 hosts - PASS
- 106.15 Verify reachability of connected internal IPv6 hosts - PASS
- 106.16 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 106.17 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 106.18 Killing a batch of links [['spine103', 'spine101'], ['leaf2', 'spine101'], ['leaf3', 'spine101'], ['leaf4', 'spine101'], ['leaf5', 'spine101']] - PASS
- 106.19 Verify host IP address assignment in ONOS - PASS
- 106.20 Verify IP address assignment from hosts - PASS
- 106.21 Verify reachability of connected internal IPv4 hosts - PASS
- 106.22 Verify reachability of connected internal IPv6 hosts - FAIL PASS
- 106.23 Verify reachability of
- from connected internal IPv6 hosts: Fail
- 106.23 Stopping Mininet IPv4 hosts to external IPv4 hosts - PASS
- Skipping the rest of this case.
Case 107: Test link failures with IPv4 hosts including external hosts configured with route-add command - PASS
- 107.1 Apply cell to environment 106.24 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 107.2 Uninstalling Atomix - PASS
- 107.3 Uninstalling ONOS package 106.25 Restoring a batch of links [['spine103', 'spine101'], ['leaf2', 'spine101'], ['leaf3', 'spine101'], ['leaf4', 'spine101'], ['leaf5', 'spine101']] - PASS
- 107.4 Installing Atomix - PASS
- 107.5 Installing ONOS package 106.26 Verify host IP address assignment in ONOS - PASS 107.6 Set up ONOS secure SSH
- 106.27 Verify IP address assignment from hosts - PASS 107.
- 7 Checking ONOS service 106.28 Verify reachability of connected internal IPv4 hosts - PASS
- 107.8 Starting ONOS CLI sessions 106.29 Verify reachability of connected internal IPv6 hosts - PASS 107.9 Checking ONOS nodes
- 106.30 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS 107
- .10 Checking ONOS applications 106.31 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 107.11 Add static route for subnet 10.0.88.0/24 towards router interface 10.0.1.1 - PASS
- 107.12 Add static route for subnet 10.0.88.0/24 towards router interface 10.0.5.1 - PASS
- 107.13 Starting Mininet Topology - PASS
- 106.32 Killing a batch of links [['spine104', 'spine102'], ['leaf2', 'spine102'], ['leaf3', 'spine102'], ['leaf4', 'spine102'], ['leaf5', 'spine102']] - PASS
- 106.33 107.14 Verify host IP address assignment in ONOS - PASS
- 107 106.15 34 Verify IP address assignment from hosts - PASS
- 107 106.16 35 Verify reachability of connected internal IPv4 hosts - PASS
- 106.36 Verify reachability of connected internal IPv6 hosts - PASS
- 107 106.17 37 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 106.38 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 107 106.18 Killing 39 Restoring a batch of links [['spine103spine104', 'spine101spine102'], ['leaf2', 'spine101spine102'], ['leaf3', 'spine101spine102'], ['leaf4', 'spine101spine102'], ['leaf5', 'spine101spine102']] - PASS
- 107 106.19 40 Verify host IP address assignment in ONOS - PASS
- 107 106.20 41 Verify IP address assignment from hosts - PASS
- 107 106.21 42 Verify reachability from of connected internal IPv4 hosts to external IPv4 hosts - PASS
- 107.22 Restoring a batch of links [['spine103', 'spine101'], ['leaf2', 'spine101'], ['leaf3', 'spine101'], ['leaf4', 'spine101'], ['leaf5', 'spine101']] 106.43 Verify reachability of connected internal IPv6 hosts - PASS
- 107 106.23 Verify host IP address assignment in ONOS - PASS 107.24 Verify IP address assignment from 44 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 107 106.25 45 Verify reachability from connected internal IPv4 IPv6 hosts to external IPv4 IPv6 hosts - PASS
- 107.26 Killing a batch of links [['spine104', 'spine102'], ['leaf2', 'spine102'], ['leaf3', 'spine102'], ['leaf4', 'spine102'], ['leaf5', 'spine102']] 106.46 Stopping Mininet - PASS
- 107.27 Verify host IP address assignment in ONOS - PASS
- 107.28 Verify IP address assignment from hosts - PASS
- 107.29 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 107.30 Restoring a batch of links [['spine104', 'spine102'], ['leaf2', 'spine102'], ['leaf3', 'spine102'], ['leaf4', 'spine102'], ['leaf5', 'spine102']] - PASS
- 107.31 Verify host IP address assignment in ONOS - PASS
- 107.32 Verify IP address assignment from hosts - PASS
- 107.33 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 107.34 Stopping Mininet - PASS
...
Case 107: Test link failures with
...
IPv4 hosts including external hosts configured with route-add command - PASS
- 108 107.1 Apply cell to environment - PASS
- 108 107.2 Uninstalling Atomix - PASS
- 108 107.3 Uninstalling ONOS package - PASS
- 108 107.4 Installing Atomix - PASS
- 108 107.5 Installing ONOS package - PASS
- 108 107.6 Set up ONOS secure SSH - PASS
- 108 107.7 Checking ONOS service - PASS
- 108 107.8 Starting ONOS CLI sessions - PASS
- 108 107.9 Checking ONOS nodes - PASS
- 108 107.10 Checking ONOS applications - PASS
- 108 107.11 Add static route for subnet 2000::8700/120 towards router interface 2000::101 10.0.88.0/24 towards router interface 10.0.1.1 - PASS 108
- 107.12 Add static route for subnet 2000::8700/120 towards router interface 2000::501 10.0.88.0/24 towards router interface 10.0.5.1 - PASS
- 108 107.13 Starting Mininet Topology - PASS
- 108 107.14 Verify host IP address assignment in ONOS - PASS
- 108 107.15 Verify IP address assignment from hosts - PASS
- 108 107.16 Verify reachability of connected internal IPv6 IPv4 hosts - PASS
- 108 107.17 Verify reachability from connected internal IPv6 IPv4 hosts to external IPv6 IPv4 hosts - PASS
- 108 107.18 Killing a batch of links [['spine103', 'spine101'], ['leaf2', 'spine101'], ['leaf3', 'spine101'], ['leaf4', 'spine101'], ['leaf5', 'spine101']] - PASS
- 108 107.19 Verify host IP address assignment in ONOS - PASS
- 108 107.20 Verify IP address assignment from hosts - PASS
- 108 107.21 Verify reachability from connected internal IPv6 IPv4 hosts to external IPv6 IPv4 hosts - PASS
- 108 107.22 Restoring a batch of links [['spine103', 'spine101'], ['leaf2', 'spine101'], ['leaf3', 'spine101'], ['leaf4', 'spine101'], ['leaf5', 'spine101']] - PASS
- 108 107.23 Verify host IP address assignment in ONOS - PASS
- 108 107.24 Verify IP address assignment from hosts - PASS
- 108 107.25 Verify reachability from connected internal IPv6 IPv4 hosts to external IPv6 IPv4 hosts - PASS
- 108 107.26 Killing a batch of links [['spine104', 'spine102'], ['leaf2', 'spine102'], ['leaf3', 'spine102'], ['leaf4', 'spine102'], ['leaf5', 'spine102']] - PASS
- 108 107.27 Verify host IP address assignment in ONOS - PASS
- 108 107.28 Verify IP address assignment from hosts - PASS
- 108 107.29 Verify reachability from connected internal IPv6 IPv4 hosts to external IPv6 IPv4 hosts - PASS
- 108 107.30 Restoring a batch of links [['spine104', 'spine102'], ['leaf2', 'spine102'], ['leaf3', 'spine102'], ['leaf4', 'spine102'], ['leaf5', 'spine102']] - PASS
- 108 107.31 Verify host IP address assignment in ONOS - PASS
- 108 107.32 Verify IP address assignment from hosts - PASS
- 108 107.33 Verify reachability from connected internal IPv6 IPv4 hosts to external IPv6 IPv4 hosts - PASS
- 108 107.34 Stopping Mininet - PASS
Case
...
108: Test link failures with
...
IPv6 hosts including external hosts configured with route-add command -
...
FAIL
- 109 108.1 Apply cell to environment - PASS
- 109 108.2 Uninstalling Atomix - PASS
- 109 108.3 Uninstalling ONOS package - PASS
- 109 108.4 Installing Atomix - PASS
- 109 108.5 Installing ONOS package - PASS
- 109 108.6 Set up ONOS secure SSH - PASS
- 109 108.7 Checking ONOS service - PASS
- 109 108.8 Starting ONOS CLI sessions - PASS
- 109 108.9 Checking ONOS nodes - PASS
- 109 108.10 Checking ONOS applications - PASS
- 109 108.11 Add static route for subnet 10.0.88.0/24 towards router interface 10.0.1.1 2000::8700/120 towards router interface 2000::101 - PASS
- 109.12 Add static route for subnet 10.0.88.0/24 towards router interface 10.0.5.1 - PASS
- 109.13 Add static route for subnet 2000::8700/120 towards router interface 2000::101 - PASS
- 109.14 108.12 Add static route for subnet 2000::8700/120 towards router interface 2000::501 - PASS
- 109 108.15 13 Starting Mininet Topology - PASS
- 109 108.16 14 Verify host IP address assignment in ONOS - FAIL
- Verify ONOS host IP failed
- 108.15 Stopping Mininet - PASS
- Skipping the rest of this case.
Case 109: Test link failures with IPv4 and IPv6 hosts including external hosts configured with route-add command - PASS
- 109.1 Apply cell to environment
- 109.17 Verify IP address assignment from hosts - PASS
- 109.18 Verify reachability of connected internal IPv4 hosts - PASS
- 109.19 Verify reachability of connected internal IPv6 hosts 2 Uninstalling Atomix - PASS
- 109.20 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts 3 Uninstalling ONOS package - PASS
- 109.21 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts 4 Installing Atomix - PASS
- 109.22 Killing a batch of links [['spine103', 'spine101'], ['leaf2', 'spine101'], ['leaf3', 'spine101'], ['leaf4', 'spine101'], ['leaf5', 'spine101']] 5 Installing ONOS package - PASS
- 109.23 Verify host IP address assignment in ONOS 6 Set up ONOS secure SSH - PASS
- 109.24 Verify IP address assignment from hosts 7 Checking ONOS service - PASS
- 109.25 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts 8 Starting ONOS CLI sessions - PASS
- 109.26 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts 9 Checking ONOS nodes - PASS
- 109.27 Restoring a batch of links [['spine103', 'spine101'], ['leaf2', 'spine101'], ['leaf3', 'spine101'], ['leaf4', 'spine101'], ['leaf5', 'spine101']] 10 Checking ONOS applications - PASS
- 109.11 Add static route for subnet 10.0.88.0/24 towards router interface 10.0.1.1 - PASS
- 109.12 Add static route for subnet 10.0.88.0/24 towards router interface 10.0.5.1 - PASS
- 109.13 Add static route for subnet 2000::8700/120 towards router interface 2000::101 - PASS
- 109.14 Add static route for subnet 2000::8700/120 towards router interface 2000::501 - PASS
- 109.15 Starting Mininet Topology - PASS
- 109.16 28 Verify host IP address assignment in ONOS - PASS
- 109.29 17 Verify IP address assignment from hosts - PASS
- 109.18 Verify reachability of connected internal IPv4 hosts - PASS
- 109.19 Verify reachability of connected internal IPv6 hosts - PASS
- 109.30 20 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 109.31 21 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 109.32 22 Killing a batch of links [['spine104spine103', 'spine102spine101'], ['leaf2', 'spine102spine101'], ['leaf3', 'spine102spine101'], ['leaf4', 'spine102spine101'], ['leaf5', 'spine102spine101']] - PASS
- 109.33 23 Verify host IP address assignment in ONOS - PASS
- 109.34 24 Verify IP address assignment from hosts - PASS
- 109.35 25 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 109.36 26 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 109.37 27 Restoring a batch of links [['spine104spine103', 'spine102spine101'], ['leaf2', 'spine102spine101'], ['leaf3', 'spine102spine101'], ['leaf4', 'spine102spine101'], ['leaf5', 'spine102spine101']] - PASS
- 109.38 28 Verify host IP address assignment in ONOS - PASS
- 109.39 29 Verify IP address assignment from hosts - PASS
- 109.40 30 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 109.41 31 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 109.42 Stopping Mininet 32 Killing a batch of links [['spine104', 'spine102'], ['leaf2', 'spine102'], ['leaf3', 'spine102'], ['leaf4', 'spine102'], ['leaf5', 'spine102']] - PASS
Case 201: Test switch failures with IPv4 hosts - PASS
- 201.1 Apply cell to environment 109.33 Verify host IP address assignment in ONOS - PASS 201.2 Uninstalling
- Atomix 109.34 Verify IP address assignment from hosts - PASS 201.3 Uninstalling ONOS
- package 109.35 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 201.4 Installing Atomix 109.36 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 201.5 Installing ONOS package - PASS
- 201.6 Set up ONOS secure SSH 109.37 Restoring a batch of links [['spine104', 'spine102'], ['leaf2', 'spine102'], ['leaf3', 'spine102'], ['leaf4', 'spine102'], ['leaf5', 'spine102']] - PASS
- 201.7 Checking ONOS service - PASS
- 201.8 Starting ONOS CLI sessions - PASS
- 201.9 Checking ONOS nodes - PASS
- 201.10 Checking ONOS applications - PASS
- 201.11 Starting Mininet Topology - PASS
- 201.12 109.38 Verify host IP address assignment in ONOS - PASS
- 201 109.13 39 Verify IP address assignment from hosts - PASS
- 201 109.14 40 Verify reachability of from connected internal IPv4 hosts to external IPv4 hosts - PASS 201.15 Kill ['spine101']
- 109.41 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 201.16 Verify host IP address assignment in ONOS 109.42 Stopping Mininet - PASS 201.17 Verify IP address assignment from
Case 201: Test switch failures with IPv4 hosts - PASS
- 201.1 Apply cell to environment - PASS
- 201.2 Uninstalling Atomix - PASS
- 201.3 Uninstalling ONOS package - PASS
- 201.4 Installing Atomix - PASS
- 201.5 Installing ONOS package - PASS
- 201.6 Set up ONOS secure SSH - PASS
- 201.7 Checking ONOS service - PASS
- 201.8 Starting ONOS CLI sessions - PASS
- 201.9 Checking ONOS nodes - PASS
- 201.10 Checking ONOS applications - PASS
- 201.11 Starting Mininet Topology - PASS
- 201.12 Verify host IP address assignment in ONOS - PASS
- 201.13 Verify IP address assignment from hosts - PASS
- 201.14 201.18 Verify reachability of connected internal IPv4 hosts - PASS
- 201.19 Recovering 15 Kill ['spine101'] - PASS
- 201.20 16 Verify host IP address assignment in ONOS - PASS
- 201.21 17 Verify IP address assignment from hosts - PASS
- 201.22 18 Verify reachability of connected internal IPv4 hosts - PASS
- 201.23 Kill 19 Recovering ['spine102spine101'] - PASS
- 201.24 20 Verify host IP address assignment in ONOS - PASS
- 201.25 21 Verify IP address assignment from hosts - PASS
- 201.26 22 Verify reachability of connected internal IPv4 hosts - PASS
- 201.27 Recovering 23 Kill ['spine102'] - PASS
- 201.28 24 Verify host IP address assignment in ONOS - PASS
- 201.29 25 Verify IP address assignment from hosts - PASS
- 201.30 26 Verify reachability of connected internal IPv4 hosts - PASS
- 201.27 Recovering ['spine102'] - PASS
- 201.28 Verify host IP address assignment in ONOS - PASS
- 201.29 Verify IP address assignment from hosts - PASS
- 201.30 Verify reachability of connected internal IPv4 hosts - PASS
- 201.31 31 Stopping Mininet - PASS
Case 202: Test switch failures with IPv6 hosts -
...
FAIL
- 202.1 Apply cell to environment - PASS
- 202.2 Uninstalling Atomix - PASS
- 202.3 Uninstalling ONOS package - PASS
- 202.4 Installing Atomix - PASS
- 202.5 Installing ONOS package - PASS
- 202.6 Set up ONOS secure SSH - PASS
- 202.7 Checking ONOS service - PASS
- 202.8 Starting ONOS CLI sessions - PASS
- 202.9 Checking ONOS nodes - PASS
- 202.10 Checking ONOS applications - PASS
- 202.11 Starting Mininet Topology - PASS
- 202.12 Verify host IP address assignment in ONOS - PASS
- 202.13 Verify IP address assignment from hosts - PASS
- 202.14 Verify reachability of connected internal IPv6 hosts - PASS
- 202.15 Kill ['spine101'] - PASS
- 202.16 Verify host IP address assignment in ONOS - PASS
- 202.17 Verify IP address assignment from hosts - PASS
- 202.18 Verify reachability of connected internal IPv6 hosts - PASS
- 202.19 Recovering ['spine101'] - PASS FAIL
- Failed to recover switch?
- 202.20 Verify host IP address assignment in ONOS - PASS
- 202.21 Verify IP address assignment from hosts - PASS
- 202.22 Verify reachability of connected internal IPv6 hosts - PASS FAIL
- Verify reachability of connected internal IPv6 hosts: Fail
- 202.23 Kill ['spine102'] Stopping Mininet - PASS
- 202.24 Verify host IP address assignment in ONOS - PASS
- 202.25 Verify IP address assignment from hosts - PASS
- Skipping the rest of this case.
Case 203: Test switch failures with IPv4 and IPv6 hosts - PASS
- 203.1 Apply cell to environment 202.26 Verify reachability of connected internal IPv6 hosts - PASS
- 202.27 Recovering ['spine102'] 203.2 Uninstalling Atomix - PASS
- 202.28 Verify host IP address assignment in ONOS 203.3 Uninstalling ONOS package - PASS
- 202.29 Verify IP address assignment from hosts - PASS
- 202.30 Verify reachability of connected internal IPv6 hosts - PASS
- 202.31 Stopping Mininet - PASS
Case 203: Test switch failures with IPv4 and IPv6 hosts - PASS
- 203.4 Installing Atomix - PASS
- 203
- 203.1 Apply cell to environment - PASS
- 203.2 Uninstalling Atomix - PASS
- 203.3 Uninstalling ONOS package - PASS
- 203.4 Installing Atomix - PASS
- 203.5 Installing ONOS package - PASS
- 203.6 Set up ONOS secure SSH - PASS
- 203.7 Checking ONOS service - PASS
- 203.8 Starting ONOS CLI sessions - PASS
- 203.9 Checking ONOS nodes - PASS
- 203.10 Checking ONOS applications - PASS
- 203.11 Starting Mininet Topology - PASS
- 203.12 Verify host IP address assignment in ONOS - PASS
- 203.13 Verify IP address assignment from hosts - PASS
- 203.14 Verify reachability of connected internal IPv4 hosts - PASS
- 203.15 Verify reachability of connected internal IPv6 hosts - PASS
- 203.16 Kill ['spine101'] - PASS
- 203.17 Verify host IP address assignment in ONOS - PASS
- 203.18 Verify IP address assignment from hosts - PASS
- 203.19 Verify reachability of connected internal IPv4 hosts - PASS
- 203.20 Verify reachability of connected internal IPv6 hosts - PASS
- 203.21 Recovering ['spine101'] - PASS
- 203.22 Verify host IP address assignment in ONOS - PASS
- 203.23 Verify IP address assignment from hosts - PASS
- 203.24 Verify reachability of connected internal IPv4 hosts - PASS
- 203.25 Verify reachability of connected internal IPv6 hosts - PASS
- 203.26 Kill ['spine102'] - PASS
- 203.27 Verify host IP address assignment in ONOS - PASS
- 203.28 Verify IP address assignment from hosts - PASS
- 203.29 Verify reachability of connected internal IPv4 hosts - PASS
- 203.30 Verify reachability of connected internal IPv6 hosts - PASS
- 203.31 Recovering ['spine102'] - PASS
- 203.32 Verify host IP address assignment in ONOS - PASS
- 203.33 Verify IP address assignment from hosts - PASS
- 203.34 Verify reachability of connected internal IPv4 hosts - PASS
- 203.35 Verify reachability of connected internal IPv6 hosts - PASS
- 203.36 Stopping Mininet - PASS
...
- 204.1 Apply cell to environment - PASS
- 204.2 Uninstalling Atomix - PASS
- 204.3 Uninstalling ONOS package - PASS
- 204.4 Installing Atomix - PASS
- 204.5 Installing ONOS package - PASS
- 204.6 Set up ONOS secure SSH - PASS
- 204.7 Checking ONOS service - PASS
- 204.8 Starting ONOS CLI sessions - PASS
- 204.9 Checking ONOS nodes - PASS
- 204.10 Checking ONOS applications - PASS
- 204.11 Starting Mininet Topology - PASS
- 204.12 Verify host IP address assignment in ONOS - PASS
- 204.13 Verify IP address assignment from hosts - PASS
- 204.14 Verify reachability of connected internal IPv4 hosts - PASS
- 204.15 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 204.16 Kill ['spine101'] - PASS
- 204.17 Verify host IP address assignment in ONOS - PASS
- 204.18 Verify IP address assignment from hosts - PASS
- 204.19 Verify reachability of connected internal IPv4 hosts - PASS
- 204.20 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 204.21 Recovering ['spine101'] - PASS
- 204.22 Verify host IP address assignment in ONOS - PASS
- 204.23 Verify IP address assignment from hosts - PASS
- 204.24 Verify reachability of connected internal IPv4 hosts - PASS
- 204.25 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 204.26 Kill ['spine102'] - PASS
- 204.27 Verify host IP address assignment in ONOS - PASS
- 204.28 Verify IP address assignment from hosts - PASS
- 204.29 Verify reachability of connected internal IPv4 hosts - PASS
- 204.30 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 204.31 Recovering ['spine102'] - PASS
- 204.32 Verify host IP address assignment in ONOS - PASS
- 204.33 Verify IP address assignment from hosts - PASS
- 204.34 Verify reachability of connected internal IPv4 hosts - PASS
- 204.35 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 204.36 Stopping Mininet - PASS
Case 205: Test switch failures with IPv6 hosts including external hosts -
...
FAIL
- 205.1 Apply cell to environment - PASS
- 205.2 Uninstalling Atomix - PASS
- 205.3 Uninstalling ONOS package - PASS
- 205.4 Installing Atomix - PASS
- 205.5 Installing ONOS package - PASS
- 205.6 Set up ONOS secure SSH - PASS
- 205.7 Checking ONOS service - PASS
- 205.8 Starting ONOS CLI sessions - PASS
- 205.9 Checking ONOS nodes - PASS
- 205.10 Checking ONOS applications - PASS
- 205.11 Starting Mininet Topology - PASS
- 205.12 Verify host IP address assignment in ONOS - PASS
- 205.13 Verify IP address assignment from hosts - PASS
- FAIL
- Verify ONOS host IP failed
- 205.13 Stopping Mininet 205.14 Verify reachability of connected internal IPv6 hosts - PASS 205.15 Verify reachability from connected internal IPv6 hosts to external IPv6
- Skipping the rest of this case.
Case 206: Test switch failures with IPv4 and IPv6 hosts including external hosts - PASS
...
- 205.16 Kill ['spine101'] 206.1 Apply cell to environment - PASS
- 205.17 Verify host IP address assignment in ONOS 206.2 Uninstalling Atomix - PASS 205.18 Verify IP address assignment from hosts
- 206.3 Uninstalling ONOS package - PASS
- 206.4 Installing Atomix - PASS
- 206.5 Installing ONOS package - PASS
- 206.6 Set up ONOS secure SSH - PASS
- 206.7 Checking ONOS service - PASS
- 206.8 Starting ONOS CLI sessions - PASS
- 206.9 Checking ONOS nodes 205.19 Verify reachability of connected internal IPv6 hosts - PASS 205.20 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts
- 206.10 Checking ONOS applications - PASS 205
- .21 Recovering ['spine101'] 206.11 Starting Mininet Topology - PASS
- 205 206.22 12 Verify host IP address assignment in ONOS - PASS
- 205 206.23 13 Verify IP address assignment from hosts - PASS
- 206.14 Verify reachability of connected internal IPv4 hosts - PASS
- 205 206.24 15 Verify reachability of connected internal IPv6 hosts - PASS
- 206.16 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 205 206.25 17 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 205 206.26 18 Kill ['spine102spine101'] - PASS
- 205 206.27 19 Verify host IP address assignment in ONOS - PASS
- 205 206.28 20 Verify IP address assignment from hosts - PASS
- 205 206.29 21 Verify reachability of connected internal IPv6 IPv4 hosts - PASS
- 205 206.30 22 Verify reachability from of connected internal IPv6 hosts to external IPv6 hosts - PASS
- 206.23 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 206.24 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 206.25 205.31 Recovering ['spine102spine101'] - PASS
- 205 206.32 26 Verify host IP address assignment in ONOS - PASS
- 205 206.33 27 Verify IP address assignment from hosts - PASS
- 205 206.34 28 Verify reachability of connected internal IPv6 IPv4 hosts - PASS
- 205 206.35 29 Verify reachability from of connected internal IPv6 hosts to external IPv6 hosts - PASS 205.36 Stopping Mininet
- 206.30 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
...
- 206.31 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 206.1 Apply cell to environment 32 Kill ['spine102'] - PASS
- 206.2 Uninstalling Atomix 33 Verify host IP address assignment in ONOS - PASS
- 206.3 Uninstalling ONOS package 34 Verify IP address assignment from hosts - PASS
- 206.4 Installing Atomix 35 Verify reachability of connected internal IPv4 hosts - PASS
- 206.5 Installing ONOS package 36 Verify reachability of connected internal IPv6 hosts - PASS
- 206.6 Set up ONOS secure SSH 37 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 206.7 Checking ONOS service 38 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 206.8 Starting ONOS CLI sessions 39 Recovering ['spine102'] - PASS
- 206.9 Checking ONOS nodes - PASS
- 206.10 Checking ONOS applications - PASS
- 206.11 Starting Mininet Topology - PASS
- 206.12 40 Verify host IP address assignment in ONOS - PASS
- 206.13 41 Verify IP address assignment from hosts - PASS
- 206.14 42 Verify reachability of connected internal IPv4 hosts - PASS
- 206.15 43 Verify reachability of connected internal IPv6 hosts - PASS
- 206.16 44 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 206.17 45 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 206.18 Kill ['spine101'] 46 Stopping Mininet - PASS
Case 207: Test switch failures with IPv4 hosts including external hosts configured with route-add command - PASS
- 207.1 Apply cell to environment 206.19 Verify host IP address assignment in ONOS - PASS 206.20 Verify IP address assignment from hosts
- 207.2 Uninstalling Atomix - PASS 206.
- 21 Verify reachability of connected internal IPv4 hosts 207.3 Uninstalling ONOS package - PASS 206.22 Verify reachability of connected internal IPv6 hosts
- 207.4 Installing Atomix - PASS 206.
- 23 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts 207.5 Installing ONOS package - PASS
- 206.24 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 206.25 Recovering ['spine101'] - PASS
- 207.6 Set up ONOS secure SSH - PASS
- 207.7 Checking ONOS service - PASS
- 207.8 Starting ONOS CLI sessions - PASS
- 207.9 Checking ONOS nodes - PASS
- 207.10 Checking ONOS applications - PASS
- 207.11 Add static route for subnet 10.0.88.0/24 towards router interface 10.0.1.1 - PASS
- 207.12 Add static route for subnet 10.0.88.0/24 towards router interface 10.0.5.1 - PASS
- 207.13 Starting Mininet Topology - PASS
- 207.14 206.26 Verify host IP address assignment in ONOS - PASS
- 206 207.27 15 Verify IP address assignment from hosts - PASS
- 206 207.28 16 Verify reachability of connected internal IPv4 hosts - PASS
- 206.29 Verify reachability of connected internal IPv6 hosts - PASS
- 206.30 207.17 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS 206.31 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts
- 207.18 Kill ['spine101'] - PASS
- 206.32 Kill ['spine102'] - PASS
- 206.33 207.19 Verify host IP address assignment in ONOS - PASS
- 206 207.34 20 Verify IP address assignment from hosts - PASS
- 206 207.35 21 Verify reachability of from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 207.22 Recovering ['spine101'] - PASS
- 206 207.36 Verify reachability of connected internal IPv6 hosts 23 Verify host IP address assignment in ONOS - PASS 206
- 207.37 24 Verify reachability from connected internal IPv4 hosts to external IPv4 IP address assignment from hosts - PASS
- 206 207.38 25 Verify reachability from connected internal IPv6 IPv4 hosts to external IPv6 IPv4 hosts - PASS
- 206 207.39 Recovering 26 Kill ['spine102'] - PASS
- 206 207.40 27 Verify host IP address assignment in ONOS - PASS
- 206 207.41 28 Verify IP address assignment from hosts - PASS
- 206 207.42 29 Verify reachability of from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 207.30 Recovering ['spine102'] - PASS
- 206 207.43 Verify reachability of connected internal IPv6 hosts 31 Verify host IP address assignment in ONOS - PASS 206
- 207.44 32 Verify reachability from connected internal IPv4 hosts to external IPv4 IP address assignment from hosts - PASS
- 206 207.45 33 Verify reachability from connected internal IPv6 IPv4 hosts to external IPv6 IPv4 hosts - PASS
- 206 207.46 34 Stopping Mininet - PASS
Case
...
208: Test switch failures with
...
IPv6 hosts including external hosts configured with route-add command -
...
FAIL
- 207 208.1 Apply cell to environment - PASS
- 207 208.2 Uninstalling Atomix - PASS
- 207 208.3 Uninstalling ONOS package - PASS
- 207 208.4 Installing Atomix - PASS
- 207 208.5 Installing ONOS package - PASS
- 207 208.6 Set up ONOS secure SSH - PASS
- 207 208.7 Checking ONOS service - PASS
- 207 208.8 Starting ONOS CLI sessions - PASS
- 207 208.9 Checking ONOS nodes - PASS
- 207 208.10 Checking ONOS applications - PASS
- 207 208.11 Add static route for subnet 10.0.88.0/24 towards router interface 10.0.1.1 2000::8700/120 towards router interface 2000::101 - PASS 207
- 208.12 Add static route for subnet 10.0.88.0/24 towards router interface 10.0.5.1 2000::8700/120 towards router interface 2000::501 - PASS
- 207 208.13 Starting Mininet Topology - PASS
- 207 208.14 Verify host IP address assignment in ONOS - PASS
- 207 208.15 Verify IP address assignment from hosts - PASS
- 207 208.16 Verify reachability of connected internal IPv4 IPv6 hosts - PASS
- 207 208.17 Verify reachability from connected internal IPv4 IPv6 hosts to external IPv4 IPv6 hosts - PASS
- 207 208.18 Kill ['spine101'] - PASS
- 207 208.19 Verify host IP address assignment in ONOS - PASS
- 207 208.20 Verify IP address assignment from hosts - PASS
- 207 208.21 Verify reachability from connected internal IPv4 IPv6 hosts to external IPv4 IPv6 hosts - PASS
- 207 208.22 Recovering ['spine101'] - PASS FAIL
- Failed to recover switch?
- 208 207.23 Verify host IP address assignment in ONOS - PASS
- 207 208.24 Verify IP address assignment from hosts - PASS
- 207 208.25 Verify reachability from connected internal IPv4 IPv6 hosts to external IPv4 hosts - PASS
- 207.26 Kill ['spine102'] - PASS
- 207.27 Verify host IP address assignment in ONOS - PASS
- 207.28 Verify IP address assignment from hosts - PASS 207.29
- IPv6 hosts - FAIL
- Verify reachability from connected internal
- IPv6 hosts to external
- 207.30 Recovering ['spine102'] - PASS
- 207.31 Verify host IP address assignment in ONOS - PASS
- 207.32 Verify IP address assignment from hosts - PASS
- 207.33 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 207.34 Stopping Mininet - PASS
...
- IPv6 hosts: Fail
- 208.26 Stopping Mininet - PASS
- Skipping the rest of this case.
Case 209: Test switch failures with IPv4 and IPv6 hosts including external hosts configured with route-add command -
...
PASS
- 208 209.1 Apply cell to environment - PASS
- 208 209.2 Uninstalling Atomix - PASS
- 208 209.3 Uninstalling ONOS package - PASS
- 208 209.4 Installing Atomix - PASS
- 208 209.5 Installing ONOS package - PASS
- 208 209.6 Set up ONOS secure SSH - PASS
- 208 209.7 Checking ONOS service - PASS
- 208 209.8 Starting ONOS CLI sessions - PASS
- 208 209.9 Checking ONOS nodes - PASS
- 208 209.10 Checking ONOS applications - PASS
- 209.11 Add static route for subnet 10.0.88.0/24 towards router interface 10.0.1.1 - PASS
- 209.12 Add static route for subnet 10.0.88.0/24 towards router interface 10.0.5.1 - PASS
- 209.13 208.11 Add static route for subnet 2000::8700/120 towards router interface 2000::101 - PASS
- 208 209.12 14 Add static route for subnet 2000::8700/120 towards router interface 2000::501 - PASS
- 208 209.13 15 Starting Mininet Topology - PASS
- 208 209.14 16 Verify host IP address assignment in ONOS - PASS
- 208 209.15 17 Verify IP address assignment from hosts - PASS
- 208 209.16 18 Verify reachability of connected internal IPv6 IPv4 hosts - FAIL PASS
- 209.19 Verify reachability of connected internal IPv6 hosts : Fail
- 208.17 Stopping Mininet - PASS
- Skipping the rest of this case.
Case 209: Test switch failures with IPv4 and IPv6 hosts including external hosts configured with route-add command - PASS
- 209.20 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 209.21 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts 209.1 Apply cell to environment - PASS
- 209.2 Uninstalling Atomix 22 Kill ['spine101'] - PASS
- 209.3 Uninstalling ONOS package 23 Verify host IP address assignment in ONOS - PASS
- 209.4 Installing Atomix 24 Verify IP address assignment from hosts - PASS
- 209.5 Installing ONOS package 25 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 209.6 Set up ONOS secure SSH 26 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 209.7 Checking ONOS service 27 Recovering ['spine101'] - PASS
- 209.8 Starting ONOS CLI sessions 28 Verify host IP address assignment in ONOS - PASS
- 209.9 Checking ONOS nodes 29 Verify IP address assignment from hosts - PASS
- 209.10 Checking ONOS applications 30 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 209.11 Add static route for subnet 10.0.88.0/24 towards router interface 10.0.1.1 31 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 209.12 Add static route for subnet 10.0.88.0/24 towards router interface 10.0.5.1 32 Kill ['spine102'] - PASS
- 209.13 Add static route for subnet 2000::8700/120 towards router interface 2000::101 - PASS
- 209.14 Add static route for subnet 2000::8700/120 towards router interface 2000::501 - PASS
- 209.15 Starting Mininet Topology - PASS
- 209.16 33 Verify host IP address assignment in ONOS - PASS
- 209.17 34 Verify IP address assignment from hosts - PASS
- 209.18 Verify reachability of connected internal IPv4 hosts - PASS
- 209.19 Verify reachability of connected internal IPv6 hosts - PASS
- 209.20 35 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 209.21 36 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 209.22 Kill 37 Recovering ['spine101spine102'] - PASS
- 209.23 38 Verify host IP address assignment in ONOS - PASS
- 209.24 39 Verify IP address assignment from hosts - PASS
- 209.25 40 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 209.26 41 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 209.27 Recovering ['spine101'] .42 Stopping Mininet - PASS
Case 301: Test onos failures with IPv4 hosts - PASS
- 301.1 Apply cell to environment - PASS
- 301.2 Uninstalling Atomix - PASS
- 301.3 Uninstalling ONOS package - PASS
- 301.4 Installing Atomix - PASS
- 301.5 Installing ONOS package - PASS
- 301.6 Set up ONOS secure SSH - PASS
- 209.28 Verify host IP address assignment in ONOS 301.7 Checking ONOS service - PASS 209.29 Verify IP address assignment from hosts
- 301.8 Starting ONOS CLI sessions - PASS
- 209.30 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts 301.9 Checking ONOS nodes - PASS 209.31 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts
- 301.10 Checking ONOS applications - PASS 209
- .32 Kill ['spine102'] 301.11 Starting Mininet Topology - PASS
- 209 301.33 12 Verify host IP address assignment in ONOS - PASS
- 209 301.34 13 Verify IP address assignment from hosts - PASS
- 209 301.35 14 Verify reachability from of connected internal IPv4 hosts to external IPv4 hosts - PASS 209.36 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts
- 301.15 Killing ONOS instances with index(es): [0] - PASS 209.37 Recovering ['spine102']
- 301.16 Check number of topology elements - PASS
- 209 301.38 17 Verify host IP address assignment in ONOS - PASS
- 209 301.39 18 Verify IP address assignment from hosts - PASS
- 209 301.40 19 Verify reachability from of connected internal IPv4 hosts to external IPv4 hosts - PASS 209.41 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts
- 301.20 Recovering ONOS instances with index(es): [0] - PASS
- 209.42 Stopping Mininet 301.21 Checking if ONOS CLI is ready - PASS
...
- 301.1 Apply cell to environment 22 Checking ONOS nodes - PASS
- 301.2 Uninstalling Atomix 23 Check number of topology elements - PASS
- 301.3 Uninstalling ONOS package 24 Verify host IP address assignment in ONOS - PASS
- 301.4 Installing Atomix 25 Verify IP address assignment from hosts - PASS
- 301.5 Installing ONOS package 26 Verify reachability of connected internal IPv4 hosts - PASS
- 301.6 Set up ONOS secure SSH - PASS
- 301.7 Checking ONOS service - PASS
- 301.8 Starting ONOS CLI sessions - PASS
- 301.9 Checking ONOS nodes - PASS
- 301.10 Checking ONOS applications - PASS
- 301.11 Starting Mininet Topology - PASS
- 301.12 Verify host IP address assignment in ONOS - PASS
- 301.13 Verify IP address assignment from hosts - PASS
- 301.14 Verify reachability of connected internal IPv4 hosts - PASS
- 301.15 Killing ONOS 27 Killing ONOS instances with index(es): [01] - PASS
- 301.16 28 Check number of topology elements - PASS
- 301.17 29 Verify host IP address assignment in ONOS - PASS
- 301.18 30 Verify IP address assignment from hosts - PASS
- 301.19 31 Verify reachability of connected internal IPv4 hosts - PASS
- 301.20 32 Recovering ONOS instances with index(es): [01] - PASS
- 301.21 33 Checking if ONOS CLI is ready - PASS
- 301.22 34 Checking ONOS nodes - PASS
- 301.23 35 Check number of topology elements - PASS
- 301.24 36 Verify host IP address assignment in ONOS - PASS
- 301.25 37 Verify IP address assignment from hosts - PASS
- 301.26 38 Verify reachability of connected internal IPv4 hosts - PASS
- 301.27 39 Killing ONOS instances with index(es): [12] - PASS
- 301.28 40 Check number of topology elements - PASS
- 301.29 41 Verify host IP address assignment in ONOS - PASS
- 301.30 42 Verify IP address assignment from hosts - PASS
- 301.31 43 Verify reachability of connected internal IPv4 hosts - PASS
- 301.32 44 Recovering ONOS instances with index(es): [12] - PASS
- 301.33 45 Checking if ONOS CLI is ready - PASS
- 301.34 46 Checking ONOS nodes - PASS
- 301.35 47 Check number of topology elements - PASS
- 301.36 48 Verify host IP address assignment in ONOS - PASS
- 301.37 49 Verify IP address assignment from hosts - PASS
- 301.38 50 Verify reachability of connected internal IPv4 hosts - PASS
- 301.39 Killing ONOS instances with index(es): [2] - PASS
- 301.40 Check number of topology elements - PASS
- 301.41 Verify host IP address assignment in ONOS - PASS
- 301.42 Verify IP address assignment from hosts - PASS
- 301.43 Verify reachability of connected internal IPv4 hosts - PASS
- 301.44 Recovering ONOS instances with index(es): [2] - PASS
- 301.45 Checking if ONOS CLI is ready - PASS
- 301.46 Checking ONOS nodes - PASS
- 301.47 Check number of topology elements - PASS
- 301.48 Verify host IP address assignment in ONOS - PASS
- 301.49 Verify IP address assignment from hosts - PASS
- 301.50 Verify reachability of connected internal IPv4 hosts - PASS
- 301.51 Stopping Mininet - PASS
- 51 Stopping Mininet - PASS
Case 302Case 302: Test onos failures with IPv6 hosts - PASS
...
- 306.1 Apply cell to environment - PASS
- 306.2 Uninstalling Atomix - PASS
- 306.3 Uninstalling ONOS package - PASS
- 306.4 Installing Atomix - PASS
- 306.5 Installing ONOS package - PASS
- 306.6 Set up ONOS secure SSH - PASS
- 306.7 Checking ONOS service - PASS
- 306.8 Starting ONOS CLI sessions - PASS
- 306.9 Checking ONOS nodes - PASS
- 306.10 Checking ONOS applications - PASS
- 306.11 Starting Mininet Topology - PASS
- 306.12 Verify host IP address assignment in ONOS - PASS
- 306.13 Verify IP address assignment from hosts - PASS
- 306.14 Verify reachability of connected internal IPv4 hosts - PASS
- 306.15 Verify reachability of connected internal IPv6 hosts - PASS
- 306.16 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 306.17 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 306.18 Killing ONOS instances with index(es): [0] - PASS
- 306.19 Check number of topology elements - PASS
- 306.20 Verify host IP address assignment in ONOS - PASS
- 306.21 Verify IP address assignment from hosts - PASS
- 306.22 Verify reachability of connected internal IPv4 hosts - PASS
- 306.23 Verify reachability of connected internal IPv6 hosts - PASS
- 306.24 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 306.25 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 306.26 Recovering ONOS instances with index(es): [0] - PASS
- 306.27 Checking if ONOS CLI is ready - PASS
- 306.28 Checking ONOS nodes - PASS
- 306.29 Check number of topology elements - PASS
- 306.30 Verify host IP address assignment in ONOS - PASS
- 306.31 Verify IP address assignment from hosts - PASS
- 306.32 Verify reachability of connected internal IPv4 hosts - PASS
- 306.33 Verify reachability of connected internal IPv6 hosts - PASS
- 306.34 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 306.35 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 306.36 Killing ONOS instances with index(es): [1] - PASS
- 306.37 Check number of topology elements - PASS
- 306.38 Verify host IP address assignment in ONOS - PASS
- 306.39 Verify IP address assignment from hosts - PASS
- 306.40 Verify reachability of connected internal IPv4 hosts - PASS
- 306.41 Verify reachability of connected internal IPv6 hosts - PASS
- 306.42 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 306.43 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 306.44 Recovering ONOS instances with index(es): [1] - PASS
- 306.45 Checking if ONOS CLI is ready - PASS
- 306.46 Checking ONOS nodes - PASS
- 306.47 Check number of topology elements - PASS
- 306.48 Verify host IP address assignment in ONOS - PASS
- 306.49 Verify IP address assignment from hosts - PASS
- 306.50 Verify reachability of connected internal IPv4 hosts - PASS
- 306.51 Verify reachability of connected internal IPv6 hosts - PASS
- 306.52 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 306.53 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 306.54 Killing ONOS instances with index(es): [2] - PASS
- 306.55 Check number of topology elements - PASS
- 306.56 Verify host IP address assignment in ONOS - PASS
- 306.57 Verify IP address assignment from hosts - PASS
- 306.58 Verify reachability of connected internal IPv4 hosts - PASS
- 306.59 Verify reachability of connected internal IPv6 hosts - PASS
- 306.60 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 306.61 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 306.62 Recovering ONOS instances with index(es): [2] - PASS
- 306.63 Checking if ONOS CLI is ready - PASS
- 306.64 Checking ONOS nodes - PASS
- 306.65 Check number of topology elements - PASS
- 306.66 Verify host IP address assignment in ONOS - PASS
- 306.67 Verify IP address assignment from hosts - PASS
- 306.68 Verify reachability of connected internal IPv4 hosts - PASS
- 306.69 Verify reachability of connected internal IPv6 hosts - PASS
- 306.70 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 306.71 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 306.72 Stopping Mininet - PASS
Case 307: Test onos failures with IPv4 hosts including external hosts configured with route-add command -
...
PASS
- 307.1 Apply cell to environment - PASS
- 307.2 Uninstalling Atomix - PASS
- 307.3 Uninstalling ONOS package - PASS
- 307.4 Installing Atomix - PASS
- 307.5 Installing ONOS package - PASS
- 307.6 Set up ONOS secure SSH - PASS
- 307.7 Checking ONOS service - PASS
- 307.8 Starting ONOS CLI sessions - PASS
- 307.9 Checking ONOS nodes - PASS
- 307.10 Checking ONOS applications - PASS
- 307.11 Add static route for subnet 10.0.88.0/24 towards router interface 10.0.1.1 - PASS
- 307.12 Add static route for subnet 10.0.88.0/24 towards router interface 10.0.5.1 - PASS
- 307.13 Starting Mininet Topology - PASS
- 307.14 Verify host IP address assignment in ONOS - PASS
- 307.15 Verify IP address assignment from hosts - PASS
- 307.16 Verify reachability of connected internal IPv4 hosts - PASS
- 307.17 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 307.18 Killing ONOS instances with index(es): [0] - PASS
- 307.19 Check number of topology elements - PASS
- 307.20 Verify host IP address assignment in ONOS - PASS
- 307.21 Verify IP address assignment from hosts - PASS
- 307.22 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 307.23 Recovering ONOS instances with index(es): [0] - PASS
- 307.24 Checking if ONOS CLI is ready - PASS
- 307.25 Checking ONOS nodes - PASS
- 307.26 Check number of topology elements - PASS
- 307.27 Verify host IP address assignment in ONOS - PASS
- 307.28 Verify IP address assignment from hosts - PASS
- 307.29 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 307.30 Killing ONOS instances with index(es): [1] - PASS
- 307.31 Check number of topology elements - PASS
- 307.32 Verify host IP address assignment in ONOS - PASS
- 307.33 Verify IP address assignment from hosts - PASS
- 307.34 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 307.35 Recovering ONOS instances with index(es): [1] - PASS
- 307.36 Checking if ONOS CLI is ready - PASS
- 307.37 Checking ONOS nodes - PASS
- 307.38 Check number of topology elements - PASS
- 307.39 Verify host IP address assignment in ONOS - PASS
- 307.40 Verify IP address assignment from hosts - PASS
- 307.41 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 307.42 Killing ONOS instances with index(es): [2] - PASS
- 307.43 Check number of topology elements - FAIL Unexpected number of links, switches, and/or controllers
- PASS
- 307.44 Verify host IP address assignment in ONOS - PASS
- 307.45 Verify IP address assignment from hosts - PASS
- 307.46 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - FAIL PASS
- 307.47 Recovering ONOS instances with index(es): [2] - PASS
- 307.48 Checking if ONOS CLI is ready - PASS
- 307.49 Checking ONOS nodes - PASS
- 307.50 Check number of topology elements - PASS
- 307.51 Verify host IP address assignment in ONOS - PASS
- 307.52 Verify IP address assignment from hosts - PASS
- 307.53 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts : Fail
- - PASS
- 307.47 54 Stopping Mininet - PASS Skipping the rest of this case.
Case 308: Test onos failures with IPv6 hosts including external hosts configured with route-add command -
...
FAIL
- 308.1 Apply cell to environment - PASS
- 308.2 Uninstalling Atomix - PASS
- 308.3 Uninstalling ONOS package - PASS
- 308.4 Installing Atomix - PASS
- 308.5 Installing ONOS package - PASS
- 308.6 Set up ONOS secure SSH - PASS
- 308.7 Checking ONOS service - PASS
- 308.8 Starting ONOS CLI sessions - PASS
- 308.9 Checking ONOS nodes - PASS
- 308.10 Checking ONOS applications - PASS
- 308.11 Add static route for subnet 2000::8700/120 towards router interface 2000::101 - PASS
- 308.12 Add static route for subnet 2000::8700/120 towards router interface 2000::501 - PASS
- 308.13 Starting Mininet Topology - PASS
- 308.14 Verify host IP address assignment in ONOS - PASS FAIL
- Verify ONOS host IP failed
- 308.15 Verify IP address assignment from hosts Stopping Mininet - PASS
- Skipping the rest of this case.
Case 309: Test onos failures with IPv4 and IPv6 hosts including external hosts configured with route-add command - PASS
- 309.1 Apply cell to environment
- 308.16 Verify reachability of connected internal IPv6 hosts - PASS
- 308.17 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 308.18 Killing ONOS instances with index(es): [0] 309.2 Uninstalling Atomix - PASS
- 308.19 Check number of topology elements 309.3 Uninstalling ONOS package - PASS 308.
- 20 Verify host IP address assignment in ONOS 309.4 Installing Atomix - PASS 308.21 Verify IP address assignment from hosts
- 309.5 Installing ONOS package - PASS 308.22
- Verify reachability from connected internal IPv6 hosts to external IPv6 hosts 309.6 Set up ONOS secure SSH - PASS
- 308 309.23 Recovering ONOS instances with index(es): [0] 7 Checking ONOS service - PASS
- 308.24 Checking if 309.8 Starting ONOS CLI is ready sessions - PASS
- 308 309.25 9 Checking ONOS nodes - PASS 308.26 Check number
- of topology elements 309.10 Checking ONOS applications - PASS
- 308.27 Verify host IP address assignment in ONOS - PASS
- 308.28 Verify IP address assignment from hosts 309.11 Add static route for subnet 10.0.88.0/24 towards router interface 10.0.1.1 - PASS 308.29 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts
- 309.12 Add static route for subnet 10.0.88.0/24 towards router interface 10.0.5.1 - PASS
- 309.13 Add static route for subnet 2000::8700/120 towards router interface 2000::101 - PASS 308.
- 30 Killing ONOS instances with index(es): [1] 309.14 Add static route for subnet 2000::8700/120 towards router interface 2000::501 - PASS
- 308.31 Check number of topology elements 309.15 Starting Mininet Topology - PASS
- 308 309.32 16 Verify host IP address assignment in ONOS - PASS
- 308 309.33 17 Verify IP address assignment from hosts - PASS
- 309.18 Verify reachability of connected internal IPv4 hosts - PASS
- 309.19 Verify reachability of connected internal IPv6 hosts - PASS
- 309.20 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 308 309.34 21 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 308 309.35 Recovering 22 Killing ONOS instances with index(es): [10] - PASS 308.36 Checking if ONOS CLI is
- ready 309.23 Check number of topology elements - PASS
- 308.37 Checking ONOS nodes 309.24 Verify host IP address assignment in ONOS - PASS
- 308.38 Check number of topology elements - PASS
- 308.39 Verify host 309.25 Verify IP address assignment in ONOS from hosts - PASS 308
- 309.40 26 Verify IP address assignment from reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 308 309.41 27 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 308 309.42 Killing 28 Recovering ONOS instances with index(es): [2] 0] - PASS
- 309.29 Checking if ONOS CLI is ready - PASS
- 309.30 Checking ONOS nodes - PASS
- 308 309.43 31 Check number of topology elements - PASS
- 308 309.44 32 Verify host IP address assignment in ONOS - PASS
- 308 309.45 33 Verify IP address assignment from hosts - PASS
- 309.34 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 308 309.46 35 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 308 309.47 Recovering 36 Killing ONOS instances with index(es): [21] - PASS
- 308.48 Checking if ONOS CLI is ready - PASS
- 308.49 Checking ONOS nodes - PASS
- 308.50 309.37 Check number of topology elements - PASS
- 308 309.51 38 Verify host IP address assignment in ONOS - PASS
- 308 309.52 39 Verify IP address assignment from hosts - PASS
- 308 309.53 40 Verify reachability from connected internal IPv6 IPv4 hosts to external IPv6 IPv4 hosts - PASS 308.54 Stopping Mininet
- 309.41 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
Case 309: Test onos failures with IPv4 and IPv6 hosts including external hosts configured with route-add command - PASS
- 309.42 Recovering ONOS instances with index(es): [1] - PASS
- 309.43 Checking if ONOS CLI is ready - PASS
- 309.44 Checking ONOS nodes 309.1 Apply cell to environment - PASS
- 309.2 Uninstalling Atomix 45 Check number of topology elements - PASS
- 309.3 Uninstalling ONOS package 46 Verify host IP address assignment in ONOS - PASS
- 309.4 Installing Atomix 47 Verify IP address assignment from hosts - PASS
- 309.5 Installing ONOS package 48 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 309.6 Set up ONOS secure SSH 49 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 309.7 Checking ONOS service 50 Killing ONOS instances with index(es): [2] - PASS
- 309.8 Starting ONOS CLI sessions 51 Check number of topology elements - PASS
- 309.9 Checking ONOS nodes 52 Verify host IP address assignment in ONOS - PASS
- 309.10 Checking ONOS applications 53 Verify IP address assignment from hosts - PASS
- 309.11 Add static route for subnet 10.0.88.0/24 towards router interface 10.0.1.1 - PASS
- 309.12 Add static route for subnet 10.0.88.0/24 towards router interface 10.0.5.1 - PASS
- 309.13 Add static route for subnet 2000::8700/120 towards router interface 2000::101 - PASS
- 309.14 Add static route for subnet 2000::8700/120 towards router interface 2000::501 - PASS
- 54 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 309.55 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 309.56 Recovering ONOS instances with index(es): [2] - PASS
- 309.57 Checking if ONOS CLI is ready - PASS
- 309.58 Checking ONOS nodes - PASS
- 309.59 Check number of topology elements 309.15 Starting Mininet Topology - PASS
- 309.16 60 Verify host IP address assignment in ONOS - PASS
- 309.17 61 Verify IP address assignment from hosts - PASS
- 309.18 62 Verify reachability of from connected internal IPv4 hosts - PASS 309.19 Verify reachability of connected internal IPv6 to external IPv4 hosts - PASS
- 309.20 63 Verify reachability from connected internal IPv4 IPv6 hosts to external IPv4 IPv6 hosts - PASS
- 309.21 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts 64 Stopping Mininet - PASS
Case 601: Bring down all switches then recover - FAIL
- 601.1 Apply cell to environment 309.22 Killing ONOS instances with index(es): [0] - PASS
- 309.23 Check number of topology elements 601.2 Uninstalling Atomix - PASS
- 309.24 Verify host IP address assignment in ONOS 601.3 Uninstalling ONOS package - PASS 309.25 Verify IP address assignment from hosts
- 601.4 Installing Atomix - PASS 309.
- 26 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts 601.5 Installing ONOS package - PASS 309.27 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts
- 601.6 Set up ONOS secure SSH - PASS
- 309 601.28 Recovering ONOS instances with index(es): [0] 7 Checking ONOS service - PASS
- 309.29 Checking if 601.8 Starting ONOS CLI is ready sessions - PASS
- 309 601.30 9 Checking ONOS nodes - PASS
- 601.10 Checking ONOS applications - PASS 309
- .31 Check number of topology elements 601.11 Starting Mininet Topology - PASS
- 309 601.32 12 Verify host IP address assignment in ONOS - PASS
- 309 601.33 13 Verify IP address assignment from hosts - PASS
- 309 601.34 14 Verify reachability from of connected internal IPv4 hosts to external IPv4 hosts - PASS 309
- 601.35 15 Verify reachability from of connected internal IPv6 hosts to external IPv6 hosts - PASS
- 309.36 Killing ONOS instances with index(es): [1] 601.16 Stopping switches - iteration 1 - PASS
- 309 601.37 17 Check number of topology elements - PASS
- 601.18 Starting switches - iteration 1 - PASS
- 601.19 Check number of topology elements - FAIL
- Unexpected number of links, switches, and/or controllers
- 601.20 Verify reachability of connected internal IPv4 hosts 309.38 Verify host IP address assignment in ONOS - PASS 309
- 601.39 Verify IP address assignment from 21 Verify reachability of connected internal IPv6 hosts - PASS
- 309 601.40 22 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 309 601.41 23 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 309.42 Recovering ONOS instances with index(es): [1] 601.24 Verify host IP address assignment in ONOS - PASS 309.43 Checking if ONOS
- CLI is ready 601.25 Verify IP address assignment from hosts - PASS
- 309.44 Checking ONOS nodes 601.26 Verify reachability of connected internal IPv4 hosts - PASS
- 309.45 Check number of topology elements - PASS
- 309.46 Verify host IP address assignment in ONOS - PASS
- 309.47 Verify IP address assignment from hosts - PASS
- 309.48 Verify reachability from connected internal IPv4 hosts to external IPv4 601.27 Verify reachability of connected internal IPv6 hosts - PASS
- 309.49 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 309.50 Killing ONOS instances with index(es): [2] 601.28 Stopping switches - iteration 2 - PASS
- 309 601.51 29 Check number of topology elements - PASS 309.52 Verify host IP
- address assignment in ONOS 601.30 Starting switches - iteration 2 - PASS
- 309.53 Verify IP address assignment from hosts - PASS
- 309.54 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 309.55 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 309.56 Recovering ONOS instances with index(es): [2] - PASS
- 309.57 Checking if ONOS CLI is ready - PASS
- 309.58 Checking ONOS nodes - PASS
- 309.59 Check number of topology elements - PASS
- 309.60 Verify host IP address assignment in ONOS - PASS
- 309.61 Verify IP address assignment from hosts - PASS
- 309.62 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 309.63 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 309.64 Stopping Mininet - PASS
Case 601: Bring down all switches then recover - FAIL
- 601.31 Check number of topology elements - FAIL
- Unexpected number of links, switches, and/or controllers
- 601.32 Verify reachability of connected internal IPv4 hosts - FAIL
- Verify reachability of connected internal IPv4 hosts: Fail
- 601.33 Stopping Mininet - PASS
- Skipping the rest of this case.
Case 602: Drop a leaf switch that is paired and has a dual homed host. - PASS
- 602 601.1 Apply cell to environment - PASS
- 601 602.2 Uninstalling Atomix - PASS
- 601 602.3 Uninstalling ONOS package - PASS
- 601 602.4 Installing Atomix - PASS
- 601 602.5 Installing ONOS package - PASS
- 601 602.6 Set up ONOS secure SSH - PASS
- 601 602.7 Checking ONOS service - PASS
- 601 602.8 Starting ONOS CLI sessions - PASS
- 601 602.9 Checking ONOS nodes - PASS
- 601 602.10 Checking ONOS applications - PASS
- 601 602.11 Starting Mininet Topology - PASS
- 601 602.12 Verify host IP address assignment in ONOS - PASS
- 601 602.13 Verify IP address assignment from hosts - PASS
- 601 602.14 Verify reachability of connected internal IPv4 hosts - PASS
- 601 602.15 Verify reachability of connected internal IPv6 hosts - PASS 601.16 Stopping switches
- - iteration 1 602.16 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 601.17 Check number of topology elements 602.17 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 601 602.18 Starting switches - iteration 1 - Disable a batch of ports - PASS 601
- 602.19 Check number of topology elements - FAIL
- Unexpected number of links, switches, and/or controllers
- Kill ['leaf2'] - PASS
- 602.20 Verify locations of hosts ['h5v6', 'h5v4', 'h4v6', 'h4v4'] - PASS
- 602.21 Verify host IP address assignment in ONOS - PASS
- 602.22 Verify IP address assignment from hosts - PASS
- 602.23 601.20 Verify reachability of connected internal IPv4 hosts - PASS
- 601 602.21 24 Verify reachability of connected internal IPv6 hosts - PASS
- 602.25 Verify unreachability of disconnected internal IPv4 hosts - PASS
- 602.26 Verify unreachability of disconnected internal IPv6 hosts - PASS
- 601 602.22 27 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - FAIL PASS
- 602.28 Verify reachability from connected internal IPv4
- IPv6 hosts to external IPv4 hosts: Fail
- 601.23 Stopping Mininet - PASS
- Skipping the rest of this case.
Case 602: Drop a leaf switch that is paired and has a dual homed host. - PASS
- IPv6 hosts - PASS
- 602.29 Verify unreachability of disconnected internal IPv4 hosts to connected external IPv4 hosts - PASS
- 602.30 Verify unreachability of disconnected internal IPv6 hosts to connected external IPv6 hosts - PASS
- 602.31 Recovering ['leaf2'] - PASS
- 602.32 Verify locations of hosts ['h5v6', 'h5v4', 'h4v6', 'h4v4']
- 602.1 Apply cell to environment - PASS
- 602.2 Uninstalling Atomix - PASS
- 602.3 Uninstalling ONOS package 33 Verify host IP address assignment in ONOS - PASS
- 602.4 Installing Atomix 34 Verify IP address assignment from hosts - PASS
- 602.5 Installing ONOS package 35 Verify reachability of connected internal IPv4 hosts - PASS
- 602.6 Set up ONOS secure SSH 36 Verify reachability of connected internal IPv6 hosts - PASS
- 602.7 Checking ONOS service 37 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 602.8 Starting ONOS CLI sessions 38 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 602.9 Checking ONOS nodes - PASS
- 602.10 Checking ONOS applications - PASS
- 602.11 Starting Mininet Topology - PASS
- 602.12 Verify host IP address assignment in ONOS - PASS
- 602.13 Verify IP address assignment from hosts - PASS
- 602.14 Verify reachability of connected internal IPv4 hosts - PASS
- 602.15 Verify reachability of connected internal IPv6 hosts - PASS
- 602.16 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 602.17 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 602.18 Disable a batch 39 Disable a batch of ports - PASS
- 602.19 40 Kill ['leaf2leaf4'] - PASS
- 602.20 41 Verify locations of hosts ['h5v6h10v4', 'h5v4h9v6', 'h4v6h10v6', 'h4v4h9v4'] - PASS
- 602.21 42 Verify host IP address assignment in ONOS - PASS
- 602.22 43 Verify IP address assignment from hosts - PASS
- 602.23 44 Verify reachability of connected internal IPv4 hosts - PASS
- 602.24 45 Verify reachability of connected internal IPv6 hosts - PASS
- 602.25 46 Verify unreachability of disconnected internal IPv4 hosts - PASS
- 602.26 47 Verify unreachability of disconnected internal IPv6 hosts - PASS
- 602.27 48 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 602.28 49 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 602.29 50 Verify unreachability of disconnected internal IPv4 hosts to connected external IPv4 hosts - PASS
- 602.30 51 Verify unreachability of disconnected internal IPv6 hosts to connected external IPv6 hosts - PASS
- 602.31 52 Recovering ['leaf2leaf4'] - PASS
- 602.32 53 Verify locations of hosts ['h5v6h10v4', 'h5v4h9v6', 'h4v6h10v6', 'h4v4h9v4'] - PASS
- 602.33 54 Verify host IP address assignment in ONOS - PASS
- 602.34 55 Verify IP address assignment from hosts - PASS
- 602.35 56 Verify reachability of connected internal IPv4 hosts - PASS
- 602.36 57 Verify reachability of connected internal IPv6 hosts - PASS
- 602.37 58 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 602.38 59 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 602.39 Disable a batch of ports 60 Stopping Mininet - PASS
Case 603: Drop hagg spine switch along with dass leaf switch. - FAIL
- 603.1 Apply cell to environment 602.40 Kill ['leaf4'] - PASS 602.41 Verify locations of hosts ['h10v4', 'h9v6', 'h10v6', 'h9v4'
- ] 603.2 Uninstalling Atomix - PASS
- 602.42 Verify host IP address assignment in ONOS 603.3 Uninstalling ONOS package - PASS 602.43 Verify IP address assignment from hosts
- 603.4 Installing Atomix - PASS 602.
- 44 Verify reachability of connected internal IPv4 hosts 603.5 Installing ONOS package - PASS 602.45 Verify reachability of connected internal IPv6 hosts
- 603.6 Set up ONOS secure SSH - PASS
- 602.46 Verify unreachability of disconnected internal IPv4 hosts 603.7 Checking ONOS service - PASS 602.47 Verify unreachability of disconnected internal IPv6 hosts
- 603.8 Starting ONOS CLI sessions - PASS
- 602.48 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts 603.9 Checking ONOS nodes - PASS 602.49
- 603.10 Checking ONOS applications - PASS
- 603.11 Starting Mininet Topology - PASS
- 603.12 Verify host IP address assignment in ONOS - PASS
- 603.13 Verify IP address assignment from hosts - PASS
- 603.14 Verify reachability of connected internal IPv4 hosts - PASS
- 603.15 Verify reachability of connected internal Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 602 603.50 Verify unreachability of disconnected 16 Verify reachability from connected internal IPv4 hosts to connected external IPv4 hosts - PASS 602
- 603.51 Verify unreachability of disconnected 17 Verify reachability from connected internal IPv6 hosts to connected external IPv6 hosts - PASS
- 602 603.52 Recovering 18 Kill ['leaf4spine103'] - PASS
- 602.53 Verify locations of hosts ['h10v4', 'h9v6', 'h10v6', 'h9v4'] - PASS
- 602.54 603.19 Verify host IP address assignment in ONOS - PASS
- 602 603.55 20 Verify IP address assignment from hosts - PASS
- 602 603.56 21 Verify reachability of connected internal IPv4 hosts - PASS
- 602 603.57 22 Verify reachability of connected internal IPv6 hosts - PASS
- 602 603.58 23 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 602 603.59 24 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS 602.60 Stopping
- Mininet 603.25 Kill ['leaf6'] - PASS
...
- 603
...
- 603.1 Apply cell to environment .26 Verify host IP address assignment in ONOS - PASS
- 603.2 Uninstalling Atomix 27 Verify IP address assignment from hosts - PASS
- 603.3 Uninstalling ONOS package 28 Verify reachability of connected internal IPv4 hosts - PASS
- 603.4 Installing Atomix 29 Verify reachability of connected internal IPv6 hosts - PASS
- 603.5 Installing ONOS package 30 Verify unreachability of disconnected internal IPv4 hosts - PASS
- 603.6 Set up ONOS secure SSH 31 Verify unreachability of disconnected internal IPv6 hosts - PASS
- 603.7 Checking ONOS service 32 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 603.8 Starting ONOS CLI sessions 33 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 603.9 Checking ONOS nodes 34 Verify unreachability of disconnected internal IPv4 hosts to connected external IPv4 hosts - PASS
- 603.10 Checking ONOS applications 35 Verify unreachability of disconnected internal IPv6 hosts to connected external IPv6 hosts - PASS
- 603.11 Starting Mininet Topology 36 Recovering ['leaf6'] - PASS
- 603.12 37 Verify host IP address assignment in ONOS - PASS
- 603.13 38 Verify IP address assignment from hosts - PASS
- 603.14 39 Verify reachability of connected internal IPv4 hosts - FAIL PASS
- 603.40 Verify reachability of connected internal IPv4 hosts: Fail
- 603.15 Stopping Mininet IPv6 hosts - PASS
- Skipping the rest of this case.
Case 604: Drop hagg spine switches. - PASS
- 604.1 Apply cell to environment 603.41 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS 604.2 Uninstalling Atomix
- 603.42 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 604.3 Uninstalling ONOS package - PASS
- 604.4 Installing Atomix - PASS
- 604.5 Installing ONOS package - PASS
- 604.6 Set up ONOS secure SSH - PASS
- 604.7 Checking ONOS service - PASS
- 604.8 Starting ONOS CLI sessions - PASS
- 604.9 Checking ONOS nodes - PASS
- 604.10 Checking ONOS applications - PASS
- 604.11 Starting Mininet Topology - PASS
- 603.43 Recovering ['spine103'] - FAIL
- Failed to recover switch?
- 603.44 604.12 Verify host IP address assignment in ONOS - PASS
- 604 603.13 45 Verify IP address assignment from hosts - PASS
- 604 603.14 46 Verify reachability of connected internal IPv4 hosts - PASS
- 604 603.15 47 Verify reachability of connected internal IPv6 hosts - PASS
- 604 603.16 48 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 604 603.17 49 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 604 603.18 50 Kill ['spine103spine104'] - PASS FAIL
- Failed to kill switch?
- 603.51 604.19 Verify host IP address assignment in ONOS - PASS
- 604 603.20 52 Verify IP address assignment from hosts - PASS
- 604 603.21 53 Verify reachability of connected internal IPv4 hosts - PASS 604.22 FAIL
- Verify reachability of connected internal IPv4 hosts: Fail
- 603.54 Stopping Mininet IPv6 hosts - PASS
- Skipping the rest of this case.
Case 604: Drop hagg spine switches. - PASS
- 604.1 Apply cell to environment .23 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS 604.24 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 604.25 Recovering ['spine103'] 2 Uninstalling Atomix - PASS
- 604.26 Verify host IP address assignment in ONOS 3 Uninstalling ONOS package - PASS
- 604.27 Verify IP address assignment from hosts 4 Installing Atomix - PASS
- 604.28 Verify reachability of connected internal IPv4 hosts 5 Installing ONOS package - PASS
- 604.29 Verify reachability of connected internal IPv6 hosts 6 Set up ONOS secure SSH - PASS
- 604.30 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts 7 Checking ONOS service - PASS
- 604.8 Starting ONOS CLI sessions - PASS
- 604.9 Checking ONOS nodes - PASS
- 604.10 Checking ONOS applications 31 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 604.32 Kill ['spine104'] 11 Starting Mininet Topology - PASS
- 604.33 12 Verify host IP address assignment in ONOS - PASS
- 604.34 13 Verify IP address assignment from hosts - PASS
- 604.35 14 Verify reachability of connected internal IPv4 hosts - PASS
- 604.36 15 Verify reachability of connected internal IPv6 hosts - PASS
- 604.37 16 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 604.38 17 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 604.39 Recovering 18 Kill ['spine104spine103'] - PASS
- 604.40 19 Verify host IP address assignment in ONOS - PASS
- 604.41 20 Verify IP address assignment from hosts - PASS
- 604.42 21 Verify reachability of connected internal IPv4 hosts - PASS
- 604.43 22 Verify reachability of connected internal IPv6 hosts - PASS
- 604.44 23 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 604.45 24 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 604.46 Stopping Mininet 25 Recovering ['spine103'] - PASS
Case 605: Drop one hagg and all leafs in big fabric - PASS
- 604.26 Verify host IP address assignment in ONOS - PASS
- 604.27 Verify IP address assignment from hosts 605.1 Apply cell to environment - PASS 605.2 Uninstalling Atomix
- 604.28 Verify reachability of connected internal IPv4 hosts - PASS 605
- .3 Uninstalling ONOS package 604.29 Verify reachability of connected internal IPv6 hosts - PASS
- 605.4 Installing Atomix 604.30 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS 605.5 Installing ONOS package
- 604.31 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 605.6 Set up ONOS secure SSH 604.32 Kill ['spine104'] - PASS
- 605.7 Checking ONOS service - PASS
- 605.8 Starting ONOS CLI sessions - PASS
- 605.9 Checking ONOS nodes - PASS
- 605.10 Checking ONOS applications - PASS
- 605.11 Starting Mininet Topology - PASS
- 605.12 604.33 Verify host IP address assignment in ONOS - PASS
- 605 604.13 34 Verify IP address assignment from hosts - PASS
- 605 604.14 35 Verify reachability of connected internal IPv4 hosts - PASS
- 605 604.15 36 Verify reachability of connected internal IPv6 hosts - PASS
- 605 604.16 37 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 605 604.17 38 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 605 604.18 Kill 39 Recovering ['spine103spine104'] - PASS
- 605 604.19 40 Verify host IP address assignment in ONOS - PASS
- 605 604.20 41 Verify IP address assignment from hosts - PASS
- 605 604.21 42 Verify reachability of connected internal IPv4 hosts - PASS
- 605 604.22 43 Verify reachability of connected internal IPv6 hosts - PASS
- 605 604.23 44 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 605 604.24 45 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 605.25 Kill ['leaf2', 'leaf3', 'leaf4', 'leaf5'] 604.46 Stopping Mininet - PASS
Case 605: Drop one hagg and all leafs in big fabric - FAIL
- 605.1 Apply cell to environment
- 605.26 Verify host IP address assignment in ONOS - PASS
- 605.27 Verify IP address assignment from hosts - PASS
- 605.28 Verify reachability of connected internal IPv4 hosts 2 Uninstalling Atomix - PASS
- 605.29 Verify reachability of connected internal IPv6 hosts 3 Uninstalling ONOS package - PASS
- 605.30 Verify unreachability of disconnected internal IPv4 hosts 4 Installing Atomix - PASS
- 605.31 Verify unreachability of disconnected internal IPv6 hosts 5 Installing ONOS package - PASS
- 605.32 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts 6 Set up ONOS secure SSH - PASS
- 605.33 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts 7 Checking ONOS service - PASS
- 605.34 Verify unreachability of disconnected internal IPv4 hosts to connected external IPv4 hosts 8 Starting ONOS CLI sessions - PASS
- 605.35 Verify unreachability of disconnected internal IPv6 hosts to connected external IPv6 hosts 9 Checking ONOS nodes - PASS
- 605.36 Verify unreachability of connected internal IPv4 hosts to disconnected external IPv4 hosts 10 Checking ONOS applications - PASS
- 605.37 Verify unreachability of connected internal IPv6 hosts to disconnected external IPv6 hosts 11 Starting Mininet Topology - PASS
- 605.38 Recovering ['spine103'] - PASS 605.39 12 Verify host IP address assignment in ONOS - PASS
- 605.40 13 Verify IP address assignment from hosts - PASS
- 605.41 14 Verify reachability of connected internal IPv4 hosts - PASS
- 605.42 15 Verify reachability of connected internal IPv6 hosts - PASS
- 605.43 Verify unreachability of disconnected 16 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 605.44 Verify unreachability of disconnected internal IPv6 hosts 17 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 605.18 Kill ['spine103'] - PASS
- 605.45 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts 19 Verify host IP address assignment in ONOS - PASS
- 605.46 20 Verify reachability from connected internal IPv6 hosts to external IPv6 IP address assignment from hosts - PASS
- 605.47 21 Verify unreachability reachability of disconnected connected internal IPv4 hosts to connected external IPv4 hosts - PASS
- 605.48 22 Verify unreachability reachability of disconnected connected internal IPv6 hosts to connected external IPv6 hosts - PASS
- 605.49 23 Verify unreachability of reachability from connected internal IPv4 hosts to disconnected external IPv4 hosts - PASS
- 605.50 24 Verify unreachability of reachability from connected internal IPv6 hosts to disconnected external IPv6 hosts - PASS
- 605.51 Recovering 25 Kill ['leaf2', 'leaf3', 'leaf4', 'leaf5'] - PASS
- 605.52 26 Verify host IP address assignment in ONOS - PASS
- 605.53 27 Verify IP address assignment from hosts - PASS
- 605.54 28 Verify reachability of connected internal IPv4 hosts - PASS
- 605.55 29 Verify reachability of connected internal IPv6 hosts - PASS
- 605.30 Verify unreachability of disconnected internal IPv4 hosts - PASS
- 605.31 Verify unreachability of disconnected internal IPv6 hosts - PASS
- 605.56 32 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 605.57 33 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 605.58 Kill ['spine104'] - PASS 605.59 Verify host IP address assignment in ONOS 34 Verify unreachability of disconnected internal IPv4 hosts to connected external IPv4 hosts - PASS
- 605.60 Verify IP address assignment from hosts - PASS
- 605.61 Verify reachability of connected internal IPv4 hosts - PASS
- 605.62 Verify reachability of connected internal 35 Verify unreachability of disconnected internal IPv6 hosts to connected external IPv6 hosts - PASS
- 605.63 36 Verify reachability from unreachability of connected internal IPv4 hosts to disconnected external IPv4 hosts - PASS
- 605.64 37 Verify reachability from unreachability of connected internal IPv6 hosts to disconnected external IPv6 hosts - PASS
- 605.65 Kill 38 Recovering ['leaf2', 'leaf3', 'leaf4', 'leaf5'spine103'] - PASS
- 605.66 39 Verify host IP address assignment in ONOS - PASS
- 605.67 40 Verify IP address assignment from hosts - PASS
- 605.68 41 Verify reachability of connected internal IPv4 hosts - PASS
- 605.69 42 Verify reachability of connected internal IPv6 hosts - PASS
- 605.70 43 Verify unreachability of disconnected internal IPv4 hosts - PASS
- 605.71 44 Verify unreachability of disconnected internal IPv6 hosts - PASS
- 605.72 45 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 605.73 46 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 605.74 47 Verify unreachability of disconnected internal IPv4 hosts to connected external IPv4 hosts - PASS
- 605.75 48 Verify unreachability of disconnected internal IPv6 hosts to connected external IPv6 hosts - PASS
- 605.76 49 Verify unreachability of connected internal IPv4 hosts to disconnected external IPv4 hosts - PASS
- 605.77 50 Verify unreachability of connected internal IPv6 hosts to disconnected external IPv6 hosts - PASS
- 605.78 51 Recovering ['spine104'leaf2', 'leaf3', 'leaf4', 'leaf5'] - PASS FAIL
- Failed to recover switch?
- 605.79 52 Verify host IP address assignment in ONOS - PASS FAIL
- Verify ONOS host IP failed
- 605.80 Verify IP address assignment from hosts 53 Stopping Mininet - PASS
- 605.81 Verify reachability of connected internal IPv4 hosts - PASS
- Skipping the rest of this case.
Case 606: Drop spine and paired leaf - FAIL
- 606.1 Apply cell to environment 605.82 Verify reachability of connected internal IPv6 hosts - PASS 605.83 Verify unreachability of disconnected internal IPv4 hosts
- 606.2 Uninstalling Atomix - PASS 605.
- 84 Verify unreachability of disconnected internal IPv6 hosts 606.3 Uninstalling ONOS package - PASS
- 605.85 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts 606.4 Installing Atomix - PASS 605.86 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts
- 606.5 Installing ONOS package - PASS 605.87
- Verify unreachability of disconnected internal IPv4 hosts to connected external IPv4 hosts 606.6 Set up ONOS secure SSH - PASS 605.88 Verify unreachability of disconnected internal IPv6 hosts to connected external IPv6 hosts
- 606.7 Checking ONOS service - PASS 605.
- 89 Verify unreachability of connected internal IPv4 hosts to disconnected external IPv4 hosts 606.8 Starting ONOS CLI sessions - PASS 605.90 Verify unreachability of connected internal IPv6 hosts to disconnected external IPv6 hosts
- 606.9 Checking ONOS nodes - PASS 605
- .91 Recovering ['leaf2', 'leaf3', 'leaf4', 'leaf5'] 606.10 Checking ONOS applications - PASS
- 606.11 Starting Mininet Topology - PASS
- 606.12 Verify host IP 605.92 Verify host IP address assignment in ONOS - PASS
- 605 606.93 13 Verify IP address assignment from hosts - PASS
- 605 606.94 14 Verify reachability of connected internal IPv4 hosts - PASS 605.95 FAIL
- Verify reachability of
- connected internal IPv4 hosts: Fail
- 606.15 Stopping Mininet to external IPv4 hosts - PASS 605.97 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 605.98 Stopping Mininet - PASS
Case 606: Drop spine and paired leaf - FAIL
- Skipping the rest of this case.
Case 620: Take down one of double links towards the spine - PASS
- 620 606.1 Apply cell to environment - PASS
- 606 620.2 Uninstalling Atomix - PASS
- 606 620.3 Uninstalling ONOS package - PASS
- 606 620.4 Installing Atomix - PASS
- 606 620.5 Installing ONOS package - PASS
- 606 620.6 Set up ONOS secure SSH - PASS
- 606 620.7 Checking ONOS service - PASS
- 606 620.8 Starting ONOS CLI sessions - PASS
- 606 620.9 Checking ONOS nodes - PASS
- 606 620.10 Checking ONOS applications - PASS
- 606 620.11 Starting Mininet Topology - PASS
- 606 620.12 Verify host IP address assignment in ONOS - PASS
- 606 620.13 Verify IP address assignment from hosts - PASS
- 606 620.14 Verify reachability of connected internal IPv4 hosts - PASS
- 606 620.15 Verify reachability of connected internal IPv6 hosts - PASS
- 606 620.16 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 606 620.17 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS 606.18 Kill ['
- spine101'] 620.18 Checking if number of groups for subnets in device of:0000000000000002 is as expected. - PASS
- 606 620.19 Verify host IP address assignment in ONOS Checking if number of groups for subnets in device of:0000000000000003 is as expected. - PASS 606.20 Verify IP address assignment from hosts
- 620.20 Checking if number of groups for subnets in device of:0000000000000004 is as expected. - PASS
- 606 620.21 Verify reachability of connected internal IPv4 hosts Checking if number of groups for subnets in device of:0000000000000005 is as expected. - PASS 606
- 620.22 Verify reachability of connected internal IPv6 hosts Disable a batch of ports - PASS 606.23 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts
- 620.23 Checking if number of groups for subnets in device of:0000000000000002 is as expected. - PASS
- 606.24 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts 620.24 Checking if number of groups for subnets in device of:0000000000000003 is as expected. - PASS
- 606.25 Kill ['leaf2'] 620.25 Checking if number of groups for subnets in device of:0000000000000004 is as expected. - PASS 606.26 Kill ['leaf3']
- 620.26 Checking if number of groups for subnets in device of:0000000000000005 is as expected. - PASS
- 606 620.27 Verify host IP address assignment in ONOS - PASS
- 606 620.28 Verify IP address assignment from hosts - PASS
- 606 620.29 Verify reachability of connected internal IPv4 hosts - PASS
- 606 620.30 Verify reachability of connected internal IPv6 hosts - PASS 606
- 620.31 Verify unreachability of disconnected reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS 606
- 620.32 Verify unreachability of disconnected reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS 606.33 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts
- 620.33 Enable a batch of ports - PASS 606.34 Verify reachability
- from connected internal IPv6 hosts to external IPv6 hosts 620.34 Checking if number of groups for subnets in device of:0000000000000002 is as expected. - PASS 606
- 620.35 Verify unreachability of disconnected internal IPv4 hosts to connected external IPv4 hosts Checking if number of groups for subnets in device of:0000000000000003 is as expected. - PASS 606
- 620.36 Verify unreachability of disconnected internal IPv6 hosts to connected external IPv6 hosts Checking if number of groups for subnets in device of:0000000000000004 is as expected. - PASS
- 606.37 Recovering ['spine101'] 620.37 Checking if number of groups for subnets in device of:0000000000000005 is as expected. - PASS
- 606 620.38 Verify host IP address assignment in ONOS - PASS
- 606 620.39 Verify IP address assignment from hosts - PASS
- 606 620.40 Verify reachability of connected internal IPv4 hosts - PASS
- 606 620.41 Verify reachability of connected internal IPv6 hosts - PASS 606
- 620.42 Verify unreachability of disconnected internal reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS 606
- 620.43 Verify unreachability of disconnected reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS 606
- 620.44 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts Stopping Mininet - PASS 606.45 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts
Case 621: Remove all the links in the network and restore all Links - FAIL
- 621.1 Apply cell to environment - PASS 606.46
- Verify unreachability of disconnected internal IPv4 hosts to connected external IPv4 hosts 621.2 Uninstalling Atomix - PASS 606.47 Verify unreachability of disconnected internal IPv6 hosts to connected external IPv6 hosts
- 621.3 Uninstalling ONOS package - PASS
- 606.48 Recovering ['leaf3'] 621.4 Installing Atomix - PASS 606.49 Recovering ['leaf2']
- 621.5 Installing ONOS package - PASS 606.50 Verify
- host IP address assignment in ONOS 621.6 Set up ONOS secure SSH - PASS 606.51 Verify IP address
- assignment from hosts 621.7 Checking ONOS service - PASS
- 606.52 Verify reachability of connected internal IPv4 hosts 621.8 Starting ONOS CLI sessions - PASS 606.53 Verify reachability of connected internal IPv6 hosts
- 621.9 Checking ONOS nodes - PASS 606
- .54 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts 621.10 Checking ONOS applications - PASS 606.55 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts
- 621.11 Starting Mininet Topology - PASS
- 606.56 Kill ['spine102'] - PASS
- 606.57 621.12 Verify host IP address assignment in ONOS - PASS
- 606 621.58 13 Verify IP address assignment from hosts - PASS
- 606 621.59 14 Verify reachability of connected internal IPv4 hosts - PASS
- 606 621.60 15 Verify reachability of connected internal IPv6 hosts - PASS
- 606 621.61 16 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 606 621.62 17 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 606.63 Kill ['leaf4'] - PASS
- 606.64 Kill ['leaf5'] - PASS
- 621.18 Killing a batch of links [['spine101', 'spine103'], ['spine102', 'spine104'], ['spine103', 'leaf6'], ['spine103', 'leaf1'], ['spine104', 'leaf6'], ['spine104', 'leaf1'], ['spine101', 'leaf2'], ['spine101', 'leaf3'], ['spine101', 'leaf4'], ['spine101', 'leaf5'], ['spine102', 'leaf2'], ['spine102', 'leaf3'], ['spine102', 'leaf4'], ['spine102', 'leaf5'], ['leaf2', 'leaf3'], ['leaf4', 'leaf5']] - PASS
- 621.19 Disable a batch of ports - No Result
- 621.20 606.65 Verify host IP address assignment in ONOS - PASS
- 606 621.66 21 Verify IP address assignment from hosts - PASS
- 606 621.67 22 Verify reachability of connected internal IPv4 hosts - PASS
- 606 621.68 23 Verify reachability of connected internal IPv6 hosts - PASS
- 606 621.69 24 Verify unreachability of disconnected internal IPv4 hosts - PASS
- 606 621.70 25 Verify unreachability of disconnected internal IPv6 hosts - PASS
- 606.71 Recovering ['spine102'] - PASS
- 606.72 Verify host IP address assignment in ONOS - PASS
- 606.73 Verify IP address assignment from hosts - PASS
- 606.74 Verify reachability of connected internal 621.26 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 606 621.75 27 Verify reachability of from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 606 621.76 28 Verify unreachability of disconnected internal IPv4 hosts to connected external IPv4 hosts - PASS
- 606 621.77 29 Verify unreachability of disconnected internal IPv6 hosts - PASS
- 606.78 Recovering ['leaf5'] - PASS
- 606.79 Recovering ['leaf4'] - FAIL
- Failed to recover switch?
- 606.80 Verify host IP address assignment in ONOS - FAIL
- Verify ONOS host IP failed
- 606.81 Stopping Mininet - PASS
- Skipping the rest of this case.
Case 620: Take down one of double links towards the spine - FAIL
- 620.1 Apply cell to environment - PASS
- 620.2 Uninstalling Atomix - PASS
- 620.3 Uninstalling ONOS package - PASS
- 620.4 Installing Atomix - PASS
- 620.5 Installing ONOS package - PASS
- 620.6 Set up ONOS secure SSH - PASS
- 620.7 Checking ONOS service - PASS
- 620.8 Starting ONOS CLI sessions - PASS
- 620.9 Checking ONOS nodes - PASS
- 620.10 Checking ONOS applications - PASS
- 620.11 Starting Mininet Topology - PASS
- 620.12 Verify host IP address assignment in ONOS - PASS
- 620.13 Verify IP address assignment from hosts - PASS
- 620.14 Verify reachability of connected internal IPv4 hosts - FAIL
- Verify reachability of connected internal IPv4 hosts: Fail
- 620.15 Stopping Mininet - PASS
- Skipping the rest of this case.
Case 621: Remove all the links in the network and restore all Links - FAIL
- to connected external IPv6 hosts - PASS
- 621
- 621.1 Apply cell to environment - PASS
- 621.2 Uninstalling Atomix - PASS
- 621.3 Uninstalling ONOS package - PASS
- 621.4 Installing Atomix - PASS
- 621.5 Installing ONOS package - PASS
- 621.6 Set up ONOS secure SSH - PASS
- 621.7 Checking ONOS service - PASS
- 621.8 Starting ONOS CLI sessions - PASS
- 621.9 Checking ONOS nodes - PASS
- 621.10 Checking ONOS applications - PASS
- 621.11 Starting Mininet Topology - PASS
- 621.12 Verify host IP address assignment in ONOS - PASS
- 621.13 Verify IP address assignment from hosts - PASS
- 621.14 Verify reachability of connected internal IPv4 hosts - PASS
- 621.15 Verify reachability of connected internal IPv6 hosts - PASS
- 621.16 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 621.17 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 621.18 Killing a batch of links [['spine101', 'spine103'], ['spine102', 'spine104'], ['spine103', 'leaf6'], ['spine103', 'leaf1'], ['spine104', 'leaf6'], ['spine104', 'leaf1'], ['spine101', 'leaf2'], ['spine101', 'leaf3'], ['spine101', 'leaf4'], ['spine101', 'leaf5'], ['spine102', 'leaf2'], ['spine102', 'leaf3'], ['spine102', 'leaf4'], ['spine102', 'leaf5'], ['leaf2', 'leaf3'], ['leaf4', 'leaf5']] - PASS
- 621.19 Disable a batch of ports - No Result
- 621.20 Verify host IP address assignment in ONOS - PASS
- 621.21 Verify IP address assignment from hosts - PASS
- 621.22 Verify reachability of connected internal IPv4 hosts - PASS
- 621.23 Verify reachability of connected internal IPv6 hosts - PASS
- 621.24 Verify unreachability of disconnected internal IPv4 hosts - PASS
- 621.25 Verify unreachability of disconnected internal IPv6 hosts - PASS
- 621.26 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 621.27 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 621.28 Verify unreachability of disconnected internal IPv4 hosts to connected external IPv4 hosts - PASS
- 621.29 Verify unreachability of disconnected internal IPv6 hosts to connected external IPv6 hosts - PASS
- 621.30 Restoring a batch of links [['spine101', 'spine103'], ['spine102', 'spine104'], ['spine103', 'leaf6'], ['spine103', 'leaf1'], ['spine104', 'leaf6'], ['spine104', 'leaf1'], ['spine101', 'leaf2'], ['spine101', 'leaf3'], ['spine101', 'leaf4'], ['spine101', 'leaf5'], ['spine102', 'leaf2'], ['spine102', 'leaf3'], ['spine102', 'leaf4'], ['spine102', 'leaf5'], ['leaf2', 'leaf3'], ['leaf4', 'leaf5']] - PASS
- 621.31 Enable a batch of ports - PASS
- 621.32 Verify host IP address assignment in ONOS - PASS
- 621.33 Verify IP address assignment from hosts - PASS
- 621.34 Verify reachability of connected internal IPv4 hosts - PASS
- 621.35 Verify reachability of connected internal IPv6 connected internal IPv6 hosts - PASS
- 621.36 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 621.36 37 Verify reachability from connected internal IPv4 IPv6 hosts to external IPv4 IPv6 hosts - FAIL
- Verify reachability from connected internal IPv4 IPv6 hosts to external IPv4 IPv6 hosts: Fail
- 621.37 38 Stopping Mininet - PASS
- Skipping the rest of this case.
...
- 622.1 Apply cell to environment - PASS
- 622.2 Uninstalling Atomix - PASS
- 622.3 Uninstalling ONOS package - PASS
- 622.4 Installing Atomix - PASS
- 622.5 Installing ONOS package - PASS
- 622.6 Set up ONOS secure SSH - PASS
- 622.7 Checking ONOS service - PASS
- 622.8 Starting ONOS CLI sessions - PASS
- 622.9 Checking ONOS nodes - PASS
- 622.10 Checking ONOS applications - PASS
- 622.11 Starting Mininet Topology - PASS
- 622.12 Verify host IP address assignment in ONOS - PASS
- 622.13 Verify IP address assignment from hosts - PASS
- 622.14 Verify reachability of connected internal IPv4 hosts - PASS
- 622.15 Verify reachability of connected internal IPv6 hosts - PASS
- 622.16 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 622.17 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 622.18 Verify locations of hosts ['h5v6', 'h5v4', 'h4v6', 'h4v4'] - PASS
- 622.19 Killing a batch of links [['spine101', 'leaf2'], ['spine102', 'leaf2']] - PASS
- 622.20 Verify host IP address assignment in ONOS - PASS
- 622.21 Verify IP address assignment from hosts - PASS
- 622.22 Verify reachability of connected internal IPv4 hosts - PASS
- 622.23 Verify reachability of connected internal IPv6 hosts - PASS
- 622.24 Verify unreachability of disconnected internal IPv4 hosts - PASS
- 622.25 Verify unreachability of disconnected internal IPv6 hosts - PASS
- 622.26 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS 622.27 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 622.28 Verify unreachability of disconnected internal IPv4 hosts to connected external IPv4 hosts - PASS
- 622.29 Verify unreachability of disconnected internal IPv6 hosts to connected external IPv6 hosts - PASS
- 622.30 Verify locations of hosts ['h5v6', 'h5v4', 'h4v6', 'h4v4'] - PASS
- 622.31 Restoring a batch of links [['spine101', 'leaf2'], ['spine102', 'leaf2']] - PASS
- 622.32 Verify host IP address assignment in ONOS - PASS
- 622.33 Verify IP address assignment from hosts - PASS 622.34 Verify reachability of connected internal IPv4 hosts to external IPv4 hosts - PASS
- 622.35 27 Verify reachability of from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 622.36 Verify reachability from connected 28 Verify unreachability of disconnected internal IPv4 hosts to connected external IPv4 hosts - PASS
- 622.37 Verify reachability from connected 29 Verify unreachability of disconnected internal IPv6 hosts to connected external IPv6 hosts - PASS
- 622.38 30 Verify locations of hosts ['h5v6', 'h5v4', 'h4v6', 'h4v4'] - PASS
- 622.39 Stopping Mininet - PASS
Case 630: Bring an instance down and drop a device - PASS
- 31 Restoring a batch of links [['spine101', 'leaf2'], ['spine102', 'leaf2']] - PASS
- 622.32 Verify host IP address assignment in ONOS - PASS
- 622.33 Verify IP address assignment from hosts - PASS
- 622.34 Verify reachability of connected internal IPv4 hosts - PASS
- 622.35 Verify reachability of connected internal IPv6 hosts - PASS
- 622.36 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 622.37 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 622.38 Verify locations of hosts ['h5v6', 'h5v4', 'h4v6', 'h4v4'] - PASS
- 622.39
- 630.1 Apply cell to environment - PASS
- 630.2 Uninstalling Atomix - PASS
- 630.3 Uninstalling ONOS package - PASS
- 630.4 Installing Atomix - PASS
- 630.5 Installing ONOS package - PASS
- 630.6 Set up ONOS secure SSH - PASS
- 630.7 Checking ONOS service - PASS
- 630.8 Starting ONOS CLI sessions - PASS
- 630.9 Checking ONOS nodes - PASS
- 630.10 Checking ONOS applications - PASS
- 630.11 Starting Mininet Topology - PASS
- 630.12 Killing ONOS instances with index(es): [0] - PASS
- 630.13 Check number of topology elements - PASS
- 630.14 Kill ['spine101'] - PASS
- 630.15 Recovering ONOS instances with index(es): [0] - PASS
- 630.16 Checking if ONOS CLI is ready - PASS
- 630.17 Checking ONOS nodes - PASS
- 630.18 Check number of topology elements - PASS
- 630.19 Stopping Mininet - PASS
Case
...
630:
...
Bring an
...
instance down and drop a device - PASS
- 630.1
- 640A: Drop ONOS1 and switch(es) spine101 at the same time - No Result
- 640.2 Apply cell to environment - PASS
- 640 630.3 2 Uninstalling Atomix - PASS
- 640 630.4 3 Uninstalling ONOS package - PASS
- 640 630.5 4 Installing Atomix - PASS
- 640 630.6 5 Installing ONOS package - PASS
- 640 630.7 6 Set up ONOS secure SSH - PASS
- 640 630.8 7 Checking ONOS service - PASS
- 640 630.9 8 Starting ONOS CLI sessions - PASS
- 640 630.10 9 Checking ONOS nodes - PASS
- 640 630.11 10 Checking ONOS applications - PASS
- 640 630.12 11 Starting Mininet Topology - PASS
- 630.12 Killing ONOS instances with index(es): [0] - PASS
- 640.13 Verify host IP address assignment in ONOS - FAIL
- Verify ONOS host IP failed
- 640.14 Stopping Mininet - PASS
- Skipping the rest of this case.
...
- 630.13 Check number of topology elements - PASS
- 630.14 Kill ['spine101'] - PASS
- 630.15 Recovering ONOS instances with index(es): [0] - PASS
- 630.16 Checking if ONOS CLI is ready - PASS
- 630.17 Checking ONOS nodes - PASS
- 630.18 Check number of topology elements - PASS
- 630.19 Stopping Mininet - PASS
Case 640: Drop an ONOS instance and
...
switch(es) at the same time - FAIL
- 641A640A: Drop ONOS1 and recover switch(es) spine101 at the same time - No Result
- 641 640.2 Apply cell to environment - PASS
- 641 640.3 Uninstalling Atomix - PASS
- 641 640.4 Uninstalling ONOS package - PASS
- 641 640.5 Installing Atomix - PASS
- 641 640.6 Installing ONOS package - PASS
- 641 640.7 Set up ONOS secure SSH - PASS
- 641 640.8 Checking ONOS service - PASS
- 641.9 Starting ONOS CLI sessions - PASS
- 641.10 Checking ONOS nodes - PASS
- 641.11 Checking ONOS applications - PASS
- 641.12 Starting Mininet Topology - PASS
- 641.13 Verify host IP address assignment in ONOS - PASS
- 641.14 Verify IP address assignment from hosts - PASS
- 641.15 Verify reachability of connected internal IPv4 hosts - PASS
- 641.16 Verify reachability of connected internal IPv6 hosts - PASS
- 641.17 Kill ['spine101'] - PASS
- 641.18 Verify host IP address assignment in ONOS - PASS
- 641.19 Verify IP address assignment from hosts - PASS
- 641.20 Verify reachability of connected internal IPv4 hosts - PASS
- 641.21 Verify reachability of connected internal IPv6 hosts - PASS
- 641.22 Kill ONOS1: 10.192.21.205 - PASS
- 641.23 Recovering ['spine101'] - PASS
- 641.24 Check number of topology elements - PASS
- 640.9 Starting ONOS CLI sessions - PASS
- 640.10 Checking ONOS nodes - PASS
- 640.11 Checking ONOS applications - PASS
- 640.12 Starting Mininet Topology - PASS
- 640.13 641.25 Verify host IP address assignment in ONOS - PASS
- 641 640.26 14 Verify IP address assignment from hosts - PASS
- 641 640.27 15 Verify reachability of connected internal IPv4 hosts - PASS
- 641 640.28 16 Verify reachability of connected internal IPv6 hosts - PASS
- 641.29 Recovering ONOS instances with index(es): [0] - PASS
- 641.30 Checking if ONOS CLI is ready 640.17 Kill ONOS1: 10.192.21.205 - PASS 641.31 Checking ONOS nodes
- 640.18 Kill ['spine101'] - PASS
- 641 640.32 19 Check number of topology elements - PASS
- 641 640.33 20 Verify host IP address assignment in ONOS - PASS
- 641 640.34 21 Verify IP address assignment from hosts - PASS
- 641 640.35 22 Verify reachability of connected internal IPv4 hosts - PASS 641.36 FAIL
- Verify reachability of connected internal IPv4 hosts: Fail
- 640.23 Stopping Mininet IPv6 hosts - PASS
- Skipping the rest of this case.
Case 641: Drop an ONOS instance and recover switch(es) at the same time - FAIL
- 641A: Drop ONOS1
- 641.37 Stopping Mininet - PASS
- 641B: Drop ONOS2 and recover switch(es) spine103 spine101 at the same time - No Result
- 641.39 2 Apply cell to environment - PASS
- 641.40 3 Uninstalling Atomix - PASS
- 641.41 4 Uninstalling ONOS package - PASS
- 641.42 5 Installing Atomix - PASS
- 641.43 6 Installing ONOS package - PASS
- 641.44 7 Set up ONOS secure SSH - PASS
- 641.45 8 Checking ONOS service - PASS
- 641.46 9 Starting ONOS CLI sessions - PASS
- 641.47 10 Checking ONOS nodes - PASS
- 641.48 11 Checking ONOS applications - PASS
- 641.49 12 Starting Mininet Topology - PASS
- 641.50 13 Verify host IP address assignment in ONOS - PASS
- 641.51 14 Verify IP address assignment from hosts - PASS
- 641.52 15 Verify reachability of connected internal IPv4 hosts - PASS
- 641.53 16 Verify reachability of connected internal IPv6 hosts - PASS
- 641.54 17 Kill ['spine103spine101'] - PASS
- 641.55 18 Verify host IP address assignment in ONOS - PASS
- 641.56 19 Verify IP address assignment from hosts - PASS
- 641.57 20 Verify reachability of connected internal IPv4 hosts - PASS
- 641.58 21 Verify reachability of connected internal IPv6 hosts - PASS
- 641.59 22 Kill ONOS2ONOS1: 10.192.21.206 205 - PASS
- 641.60 23 Recovering ['spine103spine101'] - PASS
- 641.61 24 Check number of topology elements - PASS
- 641.62 25 Verify host IP address assignment in ONOS - PASS
- 641.63 26 Verify IP address assignment from hosts - PASS
- 641.64 27 Verify reachability of connected internal IPv4 hosts - PASS
- 641.65 28 Verify reachability of connected internal IPv6 hosts - PASS
- 641.66 29 Recovering ONOS instances with index(es): [10] - PASS
- 641.67 30 Checking if ONOS CLI is ready - PASS
- 641.68 31 Checking ONOS nodes - PASS
- 641.69 32 Check number of topology elements - PASS
- 641.70 33 Verify host IP address assignment in ONOS - PASS
- 641.71 34 Verify IP address assignment from hosts - PASS
- 641.72 35 Verify reachability of connected internal IPv4 hosts - PASS
- 641.73 36 Verify reachability of connected internal IPv6 hosts - PASS
- 641.74 37 Stopping Mininet - PASS
- 641C641B: Drop ONOS3 ONOS2 and recover switch(es) leaf2 spine103 at the same time - No Result
- 641.76 39 Apply cell to environment - PASS
- 641.77 40 Uninstalling Atomix - PASS
- 641.78 41 Uninstalling ONOS package - PASS
- 641.79 42 Installing Atomix - PASS
- 641.80 43 Installing ONOS package - PASS
- 641.81 44 Set up ONOS secure SSH - PASS
- 641.82 45 Checking ONOS service - PASS
- 641.83 46 Starting ONOS CLI sessions - PASS
- 641.84 47 Checking ONOS nodes - PASS
- 641.85 48 Checking ONOS applications - PASS
- 641.86 49 Starting Mininet Topology - PASS
- 641.87 50 Verify host IP address assignment in ONOS - PASS
- 641.88 51 Verify IP address assignment from hosts - PASS
- 641.89 52 Verify reachability of connected internal IPv4 hosts - PASS
- 641.90 53 Verify reachability of connected internal IPv6 hosts - PASS
- 641.91 Disable a batch of ports - PASS 641.92 54 Kill ['leaf2spine103'] - PASS
- 641.93 55 Verify host IP address assignment in ONOS - PASS
- 641.94 56 Verify IP address assignment from hosts - PASS
- 641.95 Verify reachability of connected internal IPv4 hosts - PASS
- 641.96 Verify reachability of connected internal IPv6 hosts - PASS
- 641.97 Verify unreachability of disconnected 57 Verify reachability of connected internal IPv4 hosts - PASS
- 641.98 58 Verify unreachability reachability of disconnected connected internal IPv6 hosts - PASS
- 641.99 59 Kill ONOS3ONOS2: 10.192.21.207 206 - PASS
- 641.100 60 Recovering ['leaf2spine103'] - PASS
- 641.101 61 Check number of topology elements - PASS
- 641.102 62 Verify host IP address assignment in ONOS - PASS
- 641.103 63 Verify IP address assignment from hosts - PASS
- 641.104 64 Verify reachability of connected internal IPv4 hosts - FAIL PASS
- 641.65 Verify reachability of connected internal IPv4 hosts: Fail
- 641.105 Stopping Mininet IPv6 hosts - PASS
- Skipping the rest of this case.
Case 642: Drop ONOS instance and links at the same time - FAIL
- 642.1 Apply cell to environment 641.66 Recovering ONOS instances with index(es): [1] - PASS
- 642.2 Uninstalling Atomix - PASS
- 642.3 Uninstalling ONOS package - PASS
- 642.4 Installing Atomix - PASS
- 642.5 Installing ONOS package - PASS
- 642.6 Set up ONOS secure SSH - PASS
- 642.7 Checking ONOS service - PASS
- 642.8 Starting ONOS CLI sessions 641.67 Checking if ONOS CLI is ready - PASS
- 642 641.9 68 Checking ONOS nodes - PASS
- 642.10 Checking ONOS applications - PASS
- 642.11 Starting Mininet Topology 641.69 Check number of topology elements - PASS
- 642 641.12 70 Verify host IP address assignment in ONOS - PASS
- 642 641.13 71 Verify IP address assignment from hosts - PASS
- 642 641.14 72 Verify reachability of connected internal IPv4 hosts - PASS
- 642 641.15 73 Verify reachability of connected internal IPv6 hosts - PASS
- 642.16 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - FAIL
- Verify reachability from connected internal IPv4 hosts to external IPv4 hosts: Fail
- 642.17 641.74 Stopping Mininet - PASS
- Skipping the rest of this case.
...
- 641C: Drop
...
- ONOS3 and recover switch(es) leaf2 at the same time -
...
- No Result
- 643 641.1 76 Apply cell to environment - PASS
- 643 641.2 77 Uninstalling Atomix - PASS
- 643 641.3 78 Uninstalling ONOS package - PASS
- 643 641.4 79 Installing Atomix - PASS
- 643 641.5 Installing ONOS package - PASS
- 643.6 Set up ONOS secure SSH - PASS
- 643.7 Checking ONOS service - PASS
- 643.8 Starting ONOS CLI sessions - PASS
- 643.9 Checking ONOS nodes - PASS
- 643.10 Checking ONOS applications - PASS
- 643.11 Starting Mininet Topology - PASS
- 643.12 Verify host IP address assignment in ONOS 80 Installing ONOS package - PASS 643.13 Verify IP address assignment from hosts
- 641.81 Set up ONOS secure SSH - PASS
- 643.14 Verify reachability of connected internal IPv4 hosts 641.82 Checking ONOS service - PASS 643.15 Verify reachability of connected internal IPv6 hosts
- 641.83 Starting ONOS CLI sessions - PASS
- 643.16 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts 641.84 Checking ONOS nodes - PASS 643.17 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts
- 641.85 Checking ONOS applications - PASS 643
- .18 Disable a batch of ports 641.86 Starting Mininet Topology - PASS
- 643 641.19 87 Verify host IP address assignment in ONOS - PASS
- 643 641.20 88 Verify IP address assignment from hosts - PASS
- 643 641.21 89 Verify reachability of connected internal IPv4 hosts - PASS
- 643 641.22 90 Verify reachability of connected internal IPv6 hosts - PASS
- 643.23 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 643.24 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 643.25 Enable a batch of ports - PASS
- 643.26 Killing ONOS instances with index(es): [2] - PASS 643
- 641.91 Disable a batch of ports - PASS
- 641.92 Kill ['leaf2'] .27 Check number of topology elements - PASS
- 643 641.28 93 Verify host IP address assignment in ONOS - PASS
- 643 641.29 94 Verify IP address assignment from hosts - PASS
- 643 641.30 95 Verify reachability of connected internal IPv4 hosts - PASS
- 643 641.31 96 Verify reachability of connected internal IPv6 hosts - PASS 643
- 641.32 Verify reachability from connected internal IPv4 hosts to external 97 Verify unreachability of disconnected internal IPv4 hosts - PASS 643
- 641.33 Verify reachability from connected internal IPv6 hosts to external 98 Verify unreachability of disconnected internal IPv6 hosts - PASS
- 643.34 Recovering ONOS instances with index(es): [2] 641.99 Kill ONOS3: 10.192.21.207 - PASS
- 643.35 Checking if ONOS CLI is ready - PASS
- 643.36 Checking ONOS nodes - PASS
- 641.100 Recovering ['leaf2'] - FAIL
- Failed to recover switch?
- 641.101 643.37 Check number of topology elements - PASS
- 643 641.38 102 Verify host IP address assignment in ONOS - PASS
- 643 641.39 103 Verify IP address assignment from hosts - PASS
- 643.40 Verify reachability of connected internal IPv4 hosts - PASS
- 643.41 Verify reachability of connected internal IPv6 hosts - PASS
- 643.42 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 643.43 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 641.104 Verify reachability of connected internal IPv4 hosts - FAIL
- Verify reachability of connected internal IPv4 hosts: Fail
- 641.105 643.44 Stopping Mininet - PASS
- Skipping the rest of this case.
Case
...
642: Drop ONOS instance and links at the same time - PASS
- 642 651.1 Apply cell to environment - PASS
- 651 642.2 Uninstalling Atomix - PASS
- 651 642.3 Uninstalling ONOS package - PASS
- 651 642.4 Installing Atomix - PASS
- 651 642.5 Installing ONOS package - PASS
- 651 642.6 Set up ONOS secure SSH - PASS
- 642.7 Checking ONOS service - PASS
- 642.8 Starting ONOS CLI sessions - PASS
- 642.9 Checking ONOS nodes - PASS
- 642.10 Checking ONOS applications - PASS
- 642.11 Starting Mininet Topology - PASS
- 642.12 Verify host IP address assignment in ONOS - PASS
- 642.13 Verify IP address assignment from hosts - PASS
- 642.14 Verify reachability of connected internal IPv4 hosts - PASS
- 642.15 Verify reachability of connected internal IPv6 hosts - PASS 651.7 Checking ONOS
- service 642.16 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 651.8 Starting ONOS CLI sessions 642.17 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS 651.9 Checking ONOS nodes
- 642.18 Disable a batch of ports - PASS 651
- 642.10 Checking ONOS applications 19 Killing ONOS instances with index(es): [2] - PASS
- 651.11 Starting Mininet Topology 642.20 Check number of topology elements - PASS
- 651 642.12 21 Verify host IP address assignment in ONOS - PASS
- 651 642.13 22 Verify IP address assignment from hosts - PASS
- 651 642.14 23 Verify reachability of connected internal IPv4 hosts - PASS
- 651 642.15 24 Verify reachability of connected internal IPv6 hosts - PASS
- 651 642.16 25 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 651 642.17 26 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 642.27 Enable a batch of ports - PASS
- 642.28 Recovering ONOS instances with index(es): [2] - PASS
- 642.29 Checking if ONOS CLI is ready - PASS
- 651.18 Moving untagged host h1v4 from leaf1 to leaf1 - No Result
- 642.30 Checking ONOS nodes - PASS
- 642.31 Check number of topology elements 651.19 Verify locations of hosts ['h1v4'] - PASS
- 651 642.20 32 Verify host IP address assignment in ONOS - PASS
- 651 642.21 33 Verify IP address assignment from hosts - PASS
- 651 642.22 34 Verify reachability of connected internal IPv4 hosts - PASS
- 651 642.23 35 Verify reachability of connected internal IPv6 hosts - PASS
- 651 642.24 36 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 651 642.25 37 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 651.26 Moving untagged host h1v6 from leaf1 to leaf1 - No Result
- 651.27 Verify locations of hosts ['h1v6'] - FAIL
- Location verification failed
- 651.28 Verify host IP address assignment in ONOS - FAIL
- Verify ONOS host IP failed
- 651.29 642.38 Stopping Mininet - PASS
- Skipping the rest of this case.
Case 652: Move a dual-homed host from porst 1A and 1B to ports 2A and 2B with the same MAC and IP - FAIL
Case 643: Drop ONOS instances and bring up links at the same time - FAIL
- 643 652.1 Apply cell to environment - PASS
- 652 643.2 Uninstalling Atomix - PASS
- 652 643.3 Uninstalling ONOS package - PASS
- 652 643.4 Installing Atomix - PASS
- 652 643.5 Installing ONOS package - PASS
- 652 643.6 Set up ONOS secure SSH - PASS
- 652 643.7 Checking ONOS service - PASS
- 652 643.8 Starting ONOS CLI sessions - PASS
- 652 643.9 Checking ONOS nodes - PASS
- 652 643.10 Checking ONOS applications - PASS
- 652 643.11 Starting Mininet Topology - PASS
- 652 643.12 Verify host IP address assignment in ONOS - PASS
- 652.13 Verify IP address assignment from hosts - PASS
- 652.14 Verify reachability of connected internal IPv4 hosts IP address assignment in ONOS - FAIL
- Verify reachability of connected internal IPv4 hosts: FailONOS host IP failed
- 643.13 652.15 Stopping Mininet - PASS
- Skipping the rest of this case.
Case
...
651: Move a
...
single-homed host
...
to another port in the same DAAS - FAIL
- 653 651.1 Apply cell to environment - PASS
- 653 651.2 Uninstalling Atomix - PASS
- 653 651.3 Uninstalling ONOS package - PASS
- 653 651.4 Installing Atomix - PASS
- 653 651.5 Installing ONOS package - PASS
- 653 651.6 Set up ONOS secure SSH - PASS
- 653 651.7 Checking ONOS service - PASS
- 653 651.8 Starting ONOS CLI sessions - PASS
- 653 651.9 Checking ONOS nodes - PASS
- 653 651.10 Checking ONOS applications - PASS
- 653 651.11 Starting Mininet Topology - PASS
- 653 651.12 Verify host IP address assignment in ONOS - PASS
- 653 651.13 Verify IP address assignment from hosts - PASS
- 653 651.14 Verify reachability of connected internal IPv4 hosts - PASS
- 653 651.15 Verify reachability of connected internal IPv6 hosts - PASS
- 653 651.16 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 653 651.17 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 653.18 Add static route for subnet 10.2.31.0/24 towards router interface 10.2.30.1 - PASS
- 653.19 Start Scapy CLIs - No Result
- 653.20 Verify traffic to 10.2.31.1 by capturing packets on h4v4Scapy - PASS
- 653.21 Moving untagged host h4v4 from leaf2 and leaf3 to leaf2 and leaf3 651.18 Moving untagged host h1v4 from leaf1 to leaf1 - No Result
- 653 651.22 19 Verify locations of hosts ['h4v4h1v4'] - PASS
- 653 651.23 20 Verify host IP address assignment in ONOS - PASS
- 653 651.24 21 Verify IP address assignment from hosts - PASS
- 653 651.25 22 Verify reachability of connected internal IPv4 hosts - PASS
- 653 651.26 23 Verify reachability of connected internal IPv6 hosts - PASS
- 653 651.27 24 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 653 651.28 25 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 653.29 Verify traffic to 10.2.31.1 by capturing packets on h4v4Scapy - PASS
- 653.30 Add static route for subnet 1003::400/120 towards router interface 1003::3fe - PASS
- 653.31 Start Scapy CLIs - No Result
- 653.32 Verify traffic to 1003::4fe by capturing packets on h4v6Scapy - PASS
- 653.33 Moving untagged host h4v6 from leaf2 and leaf3 to leaf2 and leaf3 - No Result
- 653.34 Verify locations of hosts ['h4v6'] - PASS
- 653.35 Verify host IP address assignment in ONOS - PASS
- 653.36 Verify IP address assignment from hosts - PASS
- 653.37 Verify reachability of connected internal IPv4 hosts - PASS
- 653.38 Verify reachability of connected internal IPv6 hosts - PASS
- 653.39 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 653.40 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 653.41 Verify traffic to 1003::4fe by capturing packets on h4v6Scapy - PASS
- 653.42 Add static route for subnet 10.2.21.0/24 towards router interface 10.2.20.1 - PASS
- 653.43 Start Scapy CLIs - No Result
- 653.44 Verify traffic to 10.2.21.1 by capturing packets on h5v4Scapy - PASS
- 653.45 Moving tagged host h5v4 from leaf2 and leaf3 to leaf2 and leaf3 - No Result
- 653.46 Verify locations of hosts ['h5v4'] - FAIL
- Location verification failed
- 651.26 Moving untagged host h1v6 from leaf1 to leaf1 - No Result
- 651.27 Verify locations of hosts ['h1v6'] - FAIL
- Location verification failed
- 651.28 Verify host IP address assignment in ONOS - FAIL
- Verify ONOS host IP failed
- 651.29 Stopping Mininet - PASS
- Skipping the rest of this case.
Case 652: Move a dual-homed host from porst 1A and 1B to ports 2A and 2B with the same MAC and IP - FAIL
- 652.1 Apply cell to environment - PASS
- 652.2 Uninstalling Atomix - PASS
- 652.3 Uninstalling ONOS package - PASS
- 652.4 Installing Atomix - PASS
- 652.5 Installing ONOS package - PASS
- 652.6 Set up ONOS secure SSH - PASS
- 652.7 Checking ONOS service - PASS
- 652.8 Starting ONOS CLI sessions - PASS
- 652.9 Checking ONOS nodes - PASS
- 652.10 Checking ONOS applications - PASS
- 652.11 Starting Mininet Topology - PASS
- 652.12 653.47 Verify host IP address assignment in ONOS - PASS
- 653 652.48 13 Verify IP address assignment from hosts - PASS
- 653 652.49 14 Verify reachability of connected internal IPv4 hosts - PASS 653.50 FAIL
- Verify reachability of
- connected internal IPv4 hosts
- 653.52 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 653.53 Verify traffic to 10.2.21.1 by capturing packets on h5v4Scapy - PASS
- 653.54 Stopping Mininet - PASS
Case 660: External router failure with cross-link - PASS
- : Fail
- 652.15 Stopping Mininet - PASS
- Skipping the rest of this case.
Case 653: Move a dual-homed host from porst 1A and 1B to ports 2A and 2B with the same IP and different MAC - FAIL
- 653 660.1 Apply cell to environment - PASS
- 660 653.2 Uninstalling Atomix - PASS
- 660 653.3 Uninstalling ONOS package - PASS
- 660 653.4 Installing Atomix - PASS
- 660 653.5 Installing ONOS package - PASS
- 660 653.6 Set up ONOS secure SSH - PASS
- 660 653.7 Checking ONOS service - PASS
- 660 653.8 Starting ONOS CLI sessions - PASS
- 660 653.9 Checking ONOS nodes - PASS
- 660 653.10 Checking ONOS applications - PASS 660
- 653.11 Starting Mininet Topology - PASS
- 653.12 Verify host IP address assignment in ONOS - PASS
- 653.13 Verify IP address assignment from hosts - PASS
- 653.14 Verify reachability of connected internal IPv4 hosts - PASS
- 653.15 Verify reachability of connected internal IPv6 hosts - PASS
- 653.16 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 653.17 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 653.18 Add static route for subnet 10.0.88.0/24 towards router interface 10.0.1.1 - PASS 660.12 Add static route for subnet 10.02.8831.0/24 towards router interface 10.02.530.1 - PASS 660.13 Add static route for subnet 2000::8700/120 towards router interface 2000::101
- 653.19 Start Scapy CLIs - No Result
- 653.20 Verify traffic to 10.2.31.1 by capturing packets on h4v4Scapy - PASS
- 660.14 Add static route for subnet 2000::8700/120 towards router interface 2000::501 - PASS
- 653.21 Moving untagged host h4v4 from leaf2 and leaf3 to leaf2 and leaf3 - No Result
- 653.22 Verify locations of hosts ['h4v4'] 660.15 Starting Mininet Topology - PASS
- 660 653.16 23 Verify host IP address assignment in ONOS - PASS
- 660 653.17 24 Verify IP address assignment from hosts - PASS
- 660 653.18 25 Verify reachability of connected internal IPv4 hosts - PASS
- 660 653.19 26 Verify reachability of connected internal IPv6 hosts - PASS
- 660 653.20 27 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 660 653.21 28 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 653.29 Verify traffic to 10.2.31.1 by capturing packets on h4v4Scapy - PASS
- 653.30 Add static route for subnet 1003::400/120 towards router interface 1003::3fe - PASS
- 653.31 Start Scapy CLIs - No Result
- 653.32 Verify traffic to 1003::4fe by capturing packets on h4v6Scapy - PASS
- 660.22 Kill r1 653.33 Moving untagged host h4v6 from leaf2 and leaf3 to leaf2 and leaf3 - No Result
- 653.34 Verify locations of hosts ['h4v6'] - FAIL
- Location verification failed
- 653.35 660.23 Verify host IP address assignment in ONOS - PASS
- 660 653.24 36 Verify IP address assignment from hosts - PASS
- 660 653.25 37 Verify reachability from of connected internal IPv4 hosts to external IPv4 hosts - PASS 660
- 653.26 38 Verify reachability from of connected internal IPv6 hosts to external IPv6 hosts - PASS
- 660 653.27 39 Verify unreachability of reachability from connected internal IPv4 hosts to disconnected external IPv4 hosts - PASS 660
- 653.28 40 Verify unreachability of reachability from connected internal IPv6 hosts to disconnected external IPv6 hosts - PASS
- 660.29 Recovering r1 - No Result
- 660.30 Verify host IP address assignment in ONOS - PASS
- 660.31 Verify IP address assignment from hosts - PASS
- 660.32 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 660.33 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 660.34 Kill r2 - No Result
- 653.41 Verify traffic to 1003::4fe by capturing packets on h4v6Scapy - PASS
- 653.42 Add static route for subnet 10.2.21.0/24 towards router interface 10.2.20.1 - PASS
- 653.43 Start Scapy CLIs - No Result
- 653.44 Verify traffic to 10.2.21.1 by capturing packets on h5v4Scapy - PASS
- 653.45 Moving tagged host h5v4 from leaf2 and leaf3 to leaf2 and leaf3 - No Result
- 653.46 Verify locations of hosts ['h5v4'] - PASS
- 653.47 660.35 Verify host IP address assignment in ONOS - PASS
- 660 653.36 48 Verify IP address assignment from hosts - PASS
- 660 653.37 49 Verify reachability from of connected internal IPv4 hosts to external IPv4 hosts - PASS 660
- 653.38 50 Verify reachability from of connected internal IPv6 hosts to external IPv6 hosts - PASS 660
- 653.39 51 Verify unreachability of reachability from connected internal IPv6 IPv4 hosts to disconnected external IPv6 IPv4 hosts - PASS
- 660.40 Recovering r2 - No Result
- 660.41 Verify host IP address assignment in ONOS - PASS
- 660.42 Verify IP address assignment from hosts - PASS
- 660.43 653.52 Verify reachability from connected internal IPv4 IPv6 hosts to external IPv4 IPv6 hosts - PASS 660
- 653.44 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts 53 Verify traffic to 10.2.21.1 by capturing packets on h5v4Scapy - PASS
- 660 653.45 54 Stopping Mininet - PASS
Case
...
660: External router
...
failure with cross-link -
...
FAIL
- 661 660.1 Apply cell to environment - PASS
- 661 660.2 Uninstalling Atomix - PASS
- 661 660.3 Uninstalling ONOS package - PASS
- 661 660.4 Installing Atomix - PASS
- 661 660.5 Installing ONOS package - PASS
- 661 660.6 Set up ONOS secure SSH - PASS
- 661 660.7 Checking ONOS service - PASS
- 661 660.8 Starting ONOS CLI sessions - PASS
- 661 660.9 Checking ONOS nodes - PASS
- 661 660.10 Checking ONOS applications - PASS
- 661 660.11 Add static route for subnet 10.0.88.0/24 towards router interface 10.0.1.1 - PASS
- 661 660.12 Add static route for subnet 10.0.88.0/24 towards router interface 10.0.5.1 - PASS
- 661 660.13 Add static route for subnet 2000::8700/120 towards router interface 2000::101 - PASS
- 661 660.14 Add static route for subnet 2000::8700/120 towards router interface 2000::501 - PASS
- 661 660.15 Starting Mininet Topology - PASS
- 661 660.16 Verify host IP address assignment in ONOS - PASS
- 661 660.17 Verify IP address assignment from hosts - PASS
- 661 660.18 Verify reachability of connected internal IPv4 hosts - PASS
- 661.19 Verify reachability of connected internal IPv6 hosts - PASS
- 661.20 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 661.21 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 661.22 Disable a batch of ports - PASS
- 661.23 Verify host IP address assignment in ONOS - PASS
- 661.24 Verify IP address assignment from hosts - PASS
- 661.25 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 661.26 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 661.27 Enable a batch of ports - PASS
- 661.28 Verify host IP address assignment in ONOS - PASS
- 661.29 Verify IP address assignment from 660.19 Verify reachability of connected internal IPv6 hosts - PASS
- 661 660.30 20 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 661 660.31 21 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 661.32 Disable a batch of ports - PASS
- 660.22 Kill r1 - No Result
- 660.23 661.33 Verify host IP address assignment in ONOS - PASS
- 661 660.34 24 Verify IP address assignment from hosts - PASS
- 661 660.35 25 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS 661.36
- 660.26 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - FAIL
- Verify reachability from connected internal IPv6 hosts to external IPv6 hosts: Fail
- 660.27 Stopping Mininet - PASS
- Skipping the rest of this case.
Case 661: External router link failure with cross-link - PASS
- 661.1 Apply cell to environment
- 661.37 Enable a batch of ports - PASS
- 661.38 Verify host IP address assignment in ONOS - PASS
- 661.39 Verify IP address assignment from hosts 2 Uninstalling Atomix - PASS
- 661.40 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts 3 Uninstalling ONOS package - PASS
- 661.41 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts 4 Installing Atomix - PASS
- 661.42 Disable a batch of ports 5 Installing ONOS package - PASS
- 661.43 Verify host IP address assignment in ONOS 6 Set up ONOS secure SSH - PASS
- 661.44 Verify IP address assignment from hosts 7 Checking ONOS service - PASS
- 661.45 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts 8 Starting ONOS CLI sessions - PASS
- 661.46 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts 9 Checking ONOS nodes - PASS
- 661.47 Enable a batch of ports 10 Checking ONOS applications - PASS
- 661.48 Verify host IP address assignment in ONOS .11 Add static route for subnet 10.0.88.0/24 towards router interface 10.0.1.1 - PASS
- 661.49 Verify IP address assignment from hosts .12 Add static route for subnet 10.0.88.0/24 towards router interface 10.0.5.1 - PASS
- 661.50 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts 13 Add static route for subnet 2000::8700/120 towards router interface 2000::101 - PASS
- 661.51 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts 14 Add static route for subnet 2000::8700/120 towards router interface 2000::501 - PASS
- 661.52 Disable a batch of ports 15 Starting Mininet Topology - PASS
- 661.53 16 Verify host IP address assignment in ONOS - PASS
- 661.54 17 Verify IP address assignment from hosts - PASS
- 661.18 Verify reachability of connected internal IPv4 hosts - PASS
- 661.19 Verify reachability of connected internal IPv6 hosts - PASS
- 661.55 20 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 661.56 21 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 661.57 Enable 22 Disable a batch of ports - PASS
- 661.58 23 Verify host IP address assignment in ONOS - PASS
- 661.59 24 Verify IP address assignment from hosts - PASS
- 661.60 25 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 661.61 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 661.62 Stopping Mininet - PASS
Case 662: Internal router failure with cross-link - PASS
- 662.1 Apply cell to environment - PASS
- 662.2 Uninstalling Atomix - PASS
- 662.3 Uninstalling ONOS package - PASS
- 662.4 Installing Atomix - PASS
- 662.5 Installing ONOS package - PASS
- 662.6 Set up ONOS secure SSH - PASS
- 662.7 Checking ONOS service - PASS
- 662.8 Starting ONOS CLI sessions hosts to external IPv4 hosts - PASS 662.9 Checking ONOS nodes
- 661.26 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 662.10 Checking ONOS applications 661.27 Enable a batch of ports - PASS 662.11 Add static route for subnet 10.0.88.0/24 towards router interface 10.0.1.1
- 661.28 Verify host IP address assignment in ONOS - PASS
- 662.12 Add static route for subnet 10.0.88.0/24 towards router interface 10.0.5.1 661.29 Verify IP address assignment from hosts - PASS 662.13 Add static route for subnet 2000::8700/120 towards router interface 2000::101
- 661.30 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS 662
- .14 Add static route for subnet 2000::8700/120 towards router interface 2000::501 661.31 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 662.15 Starting Mininet Topology 661.32 Disable a batch of ports - PASS
- 662 661.16 33 Verify host IP address assignment in ONOS - PASS
- 662 661.17 34 Verify IP address assignment from hosts - PASS
- 662 661.18 35 Verify reachability of from connected internal IPv4 hosts to external IPv4 hosts - PASS 662
- 661.19 36 Verify reachability of from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 661.37 Enable a batch of ports - PASS
- 661.38 Verify host IP address assignment in ONOS - PASS
- 661.39 Verify IP address assignment from hosts - PASS
- 662 661.20 40 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 662 661.21 41 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 662.22 Kill bgp1 - No Result
- 661.42 Disable a batch of ports - PASS
- 661.43 662.23 Verify host IP address assignment in ONOS - PASS
- 662 661.24 44 Verify IP address assignment from hosts - PASS
- 662 661.25 45 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 662 661.26 46 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 662.27 Recovering bgp1 - No Result
- 661.47 Enable a batch of ports - PASS
- 661.48 662.28 Verify host IP address assignment in ONOS - PASS
- 662 661.29 49 Verify IP address assignment from hosts - PASS
- 662 661.30 50 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 662 661.31 51 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 662.32 Kill bgp2 - No Result
- 661.52 Disable a batch of ports - PASS
- 661.53 662.33 Verify host IP address assignment in ONOS - PASS
- 662 661.34 54 Verify IP address assignment from hosts - PASS
- 662 661.35 55 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 662 661.36 56 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 662.37 Recovering bgp2 - No Result
- 661.57 Enable a batch of ports - PASS
- 661.58 662.38 Verify host IP address assignment in ONOS - PASS
- 662 661.39 59 Verify IP address assignment from hosts - PASS
- 662 661.40 60 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 662 661.41 61 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 662 661.42 62 Stopping Mininet - PASS
Case
...
662:
...
Internal router failure
...
with cross-link -
...
PASS
- 663 662.1 Apply cell to environment - PASS
- 663 662.2 Uninstalling Atomix - PASS
- 663 662.3 Uninstalling ONOS package - PASS
- 663 662.4 Installing Atomix - PASS
- 663 662.5 Installing ONOS package - PASS
- 663 662.6 Set up ONOS secure SSH - PASS
- 663 662.7 Checking ONOS service - PASS
- 663 662.8 Starting ONOS CLI sessions - PASS
- 663 662.9 Checking ONOS nodes - PASS
- 663 662.10 Checking ONOS applications - PASS
- 663 662.11 Add static route for subnet 10.0.88.0/24 towards router interface 10.0.1.1 - PASS
- 663 662.12 Add static route for subnet 10.0.88.0/24 towards router interface 10.0.5.1 - PASS
- 663 662.13 Add static route for subnet 2000::8700/120 towards router interface 2000::101 - PASS
- 663 662.14 Add static route for subnet 2000::8700/120 towards router interface 2000::501 - PASS
- 663 662.15 Starting Mininet Topology - PASS
- 662.16 Verify host IP address assignment in ONOS - PASS
- 662.17 Verify IP address assignment from hosts - PASS
- 662.18 Verify reachability of connected internal IPv4 hosts - PASS
- 662.19 Verify reachability of connected internal IPv6 hosts - PASS
- 662.20 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 662.21 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 662.22 Kill bgp1 - No Result
- 662.23 663.16 Verify host IP address assignment in ONOS - PASS
- 663 662.17 24 Verify IP address assignment from hosts - PASS
- 663 662.18 25 Verify reachability of from connected internal IPv4 hosts to external IPv4 hosts - PASS 663
- 662.19 26 Verify reachability of from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 662.27 Recovering bgp1 - No Result
- 662.28 Verify host IP address assignment in ONOS - PASS
- 662.29 Verify IP address assignment from hosts - PASS
- 663 662.20 30 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 663 662.21 31 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 663.22 Disable a batch of ports - PASS
- 662.32 Kill bgp2 - No Result
- 662.33 663.23 Verify host IP address assignment in ONOS - PASS
- 663 662.24 34 Verify IP address assignment from hosts - PASS
- 663 662.25 35 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 663 662.26 36 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 663.27 Kill r1 662.37 Recovering bgp2 - No Result
- 663 662.28 38 Verify host IP address assignment in ONOS - PASS
- 663 662.29 39 Verify IP address assignment from hosts - PASS
- 663 662.30 40 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - FAIL PASS
- 662.41 Verify reachability from connected internal IPv4
- IPv6 hosts to external IPv4 hosts: Fail
- IPv6 hosts - PASS
- 662.42 663.31 Stopping Mininet - PASS
- Skipping the rest of this case.
...
Case 663: External router
...
failure without cross-link -
...
FAIL
- 664 663.1 Apply cell to environment - PASS
- 664 663.2 Uninstalling Atomix - PASS
- 664 663.3 Uninstalling ONOS package - PASS
- 664 663.4 Installing Atomix - PASS
- 664 663.5 Installing ONOS package - PASS
- 664 663.6 Set up ONOS secure SSH - PASS
- 664 663.7 Checking ONOS service - PASS
- 664 663.8 Starting ONOS CLI sessions - PASS
- 664 663.9 Checking ONOS nodes - PASS
- 664 663.10 Checking ONOS applications - PASS
- 664 663.11 Add static route for subnet 10.0.88.0/24 towards router interface 10.0.1.1 - PASS
- 664 663.12 Add static route for subnet 10.0.88.0/24 towards router interface 10.0.5.1 - PASS
- 664 663.13 Add static route for subnet 2000::8700/120 towards router interface 2000::101 - PASS
- 664 663.14 Add static route for subnet 2000::8700/120 towards router interface 2000::501 - PASS
- 664 663.15 Starting Mininet Topology - PASS
- 664 663.16 Verify host IP address assignment in ONOS - PASS
- 664 663.17 Verify IP address assignment from hosts - PASS
- 664 663.18 Verify reachability of connected internal IPv4 hosts - PASS 664
- 663.19 Verify reachability of connected internal IPv6 hosts - PASS 664.20 FAIL
- Verify reachability
- of connected internal IPv6 hosts: Fail
- 663.20 Stopping Mininet IPv4 hosts to external IPv4 hosts - PASS 664.21 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 664.22 Disable a batch of ports - PASS
- 664.23 Verify host IP address assignment in ONOS - PASS
- 664.24 Verify IP address assignment from hosts - PASS
- 664.25 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 664.26 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 664.27 Disable a batch of ports - PASS
- 664.28 Verify host IP address assignment in ONOS - PASS
- 664.29 Verify IP address assignment from hosts - PASS
- Skipping the rest of this case.
Case 664: External router link failure without cross-link - FAIL
- 664.1 Apply cell to environment 664.30 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 664.31 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts 2 Uninstalling Atomix - PASS
- 664.32 Verify unreachability of connected internal IPv4 hosts to disconnected external IPv4 hosts 3 Uninstalling ONOS package - PASS
- 664.33 Verify unreachability of connected internal IPv6 hosts to disconnected external IPv6 hosts 4 Installing Atomix - PASS
- 664.34 Enable a batch of ports 5 Installing ONOS package - PASS
- 664.35 Verify host IP address assignment in ONOS 6 Set up ONOS secure SSH - PASS
- 664.36 Verify IP address assignment from hosts 7 Checking ONOS service - PASS
- 664.37 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts 8 Starting ONOS CLI sessions - PASS
- 664.38 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts 9 Checking ONOS nodes - PASS
- 664.39 Disable a batch of ports 10 Checking ONOS applications - PASS
- 664.40 Verify host IP address assignment in ONOS - PASS 664.41 Verify IP address assignment from hosts .11 Add static route for subnet 10.0.88.0/24 towards router interface 10.0.1.1 - PASS
- 664.42 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts .12 Add static route for subnet 10.0.88.0/24 towards router interface 10.0.5.1 - PASS
- 664.43 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts 13 Add static route for subnet 2000::8700/120 towards router interface 2000::101 - PASS
- 664.44 Verify unreachability of connected internal IPv6 hosts to disconnected external IPv6 hosts 14 Add static route for subnet 2000::8700/120 towards router interface 2000::501 - PASS
- 664.45 Enable a batch of ports 15 Starting Mininet Topology - PASS
- 664.46 16 Verify host IP address assignment in ONOS - PASS
- 664.47 Verify IP address assignment from hosts - PASS
- 664.48 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 664.49 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- FAIL
- Verify ONOS host IP failed
- 664.17 664.50 Stopping Mininet - PASS
- Skipping the rest of this case.
Case 665: Internal router failure without cross-link - FAIL
...
- 665.1 Apply cell to environment - PASS
- 665.2 Uninstalling Atomix - PASS
- 665.3 Uninstalling ONOS package - PASS
- 665.4 Installing Atomix - PASS
- 665.5 Installing ONOS package - PASS
- 665.6 Set up ONOS secure SSH - PASS
- 665.7 Checking ONOS service - PASS
- 665.8 Starting ONOS CLI sessions - PASS
- 665.9 Checking ONOS nodes - PASS
- 665.10 Checking ONOS applications - PASS
- 665.11 Add static route for subnet 10.0.88.0/24 towards router interface 10.0.1.1 - PASS
- 665.12 Add static route for subnet 10.0.88.0/24 towards router interface 10.0.5.1 - PASS
- 665.13 Add static route for subnet 2000::8700/120 towards router interface 2000::101 - PASS
- 665.14 Add static route for subnet 2000::8700/120 towards router interface 2000::501 - PASS
- 665.15 Starting Mininet Topology - PASS
- 665.16 Verify host IP address assignment in ONOS - PASS
- 665.17 Verify IP address assignment from hosts - PASS
- 665.18 Verify reachability of connected internal IPv4 hosts - PASS
- 665.19 Verify reachability of connected internal IPv6 hosts - PASS
- 665.20 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 665.21 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 665.22 Disable a batch of ports - PASS
- 665.23 Verify host IP address assignment in ONOS - PASS
- 665.24 Verify IP address assignment from hosts - PASS
- 665.25 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 665.26 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 665.27 Kill bgp1 - No Result
- 665.28 Verify host IP address assignment in ONOS - PASS
- 665.29 Verify IP address assignment from hosts - PASS
- 665.30 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 665.31 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 665.32 Verify unreachability of connected internal IPv6 hosts to disconnected external IPv6 hosts - PASS
- 665.33 Recovering bgp1 - No Result
- 665.34 Verify host IP address assignment in ONOS - PASS
- 665.35 Verify IP address assignment from hosts - PASS
- 665.36 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS
- 665.37 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS
- 665.38 Kill bgp2 - No Result
- 665.39 Verify host IP address assignment in ONOS - PASS
- 665.40 Verify IP address assignment from hosts - PASS
- 665.41 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - FAIL
- Verify reachability from connected internal IPv4 hosts to external IPv4 hosts: Fail
- 665.31 42 Stopping Mininet - PASS
- Skipping the rest of this case.