Due to a ransomware attack, the wiki was reverted to a July 2022 version. . We apologize for the lack of a more recent valid backup.
...
HTML |
---|
<img src="https://jenkins.onosproject.org/view/QA/job/postjob-Fabric2/lastSuccessfulBuild/artifact/SRDhcprelay_onos-1.15_20-builds_graph.jpg", alt="SRDhcprelay", style="width:525px;height:350px;border:0"> |
commit 4b94dc0dfe74416dd946e86c5d3fac7c29097587 97282ce7e23dd74051353405eb660f5d125644d0 (HEAD -] onos-1.15, origin/onos-1.15)
Author: pier [pier@opennetworking.orgGeorgios Katsikas [katsikas.gp@gmail.com]
AuthorDate: Tue Nov 26 11:48:48 2019 +0100Thu May 21 16:02:37 2020 +0200
Commit: pier Thomas Vachuska [pier@opennetworkingtom@opennetworking.org]
CommitDate: Mon Dec 2 10:43:50 2019 +0100
Adds coordination during host movementsThu May 28 16:09:28 2020 +0000
Server device driver extensions
Case 1: DHCP v4 tests with 4 clients attached to switch directly and 1 server attached to switch directly, with 3 ONOS instances - PASS
...
- 11.1 Apply cell to environment - PASS
- 11.2 Uninstalling Atomix - PASS
- 11.3 Uninstalling ONOS package - PASS
- 11.4 Installing Atomix - PASS
- 11.5 Installing ONOS package - PASS
- 11.6 Set up ONOS secure SSH - FAIL Failed to secure ssh
- PASS
- 11.7 Checking ONOS service - PASS
- 11.8 Starting ONOS CLI sessions - PASS
- 11.9 Checking ONOS nodes - PASS
- 11.10 Checking ONOS applications - PASS
- 11.11 Starting Mininet Topology - PASS
- 11.12 Verify host IP address assignment in ONOS - PASS 11.13 Verify IP address assignment from hosts - PASS FAIL
- Verify ONOS host IP failed
- 11.14 13 Stopping Mininet - PASS 11.15 Copying karaf logs - PASS
- Skipping the rest of this case.
Case 12: DHCP v6 tests with 4 clients attached to switch directly and 1 server attached to switch indirectly (via gateway), with 3 ONOS instances - FAIL
...
- 61.1 Apply cell to environment - PASS
- 61.2 Uninstalling Atomix - PASS
- 61.3 Uninstalling ONOS package - PASS
- 61.4 Installing Atomix - PASS
- 61.5 Installing ONOS package - PASS
- 61.6 Set up ONOS secure SSH - PASS
- 61.7 Checking ONOS service - PASS
- 61.8 Starting ONOS CLI sessions - PASS
- 61.9 Checking ONOS nodes - PASS
- 61.10 Checking ONOS applications - PASS
- 61.11 Starting Mininet Topology - PASS
- 61.12 Verify host IP address assignment in ONOS - PASS
- 61.13 Verify IP address assignment from hosts - PASS
- 61.14 Stopping Mininet - PASS
- 61.15 Copying karaf logs - PASS
Case 71: DHCP v6 tests with dual-homed tagged hosts: 4 clients attached to switch directly and 1 server attached to switch directly, with 3 ONOS instances -
...
PASS
- 71.1 Apply cell to environment - PASS
- 71.2 Uninstalling Atomix - PASS
- 71.3 Uninstalling ONOS package - PASS
- 71.4 Installing Atomix - PASS
- 71.5 Installing ONOS package - PASS
- 71.6 Set up ONOS secure SSH - PASS
- 71.7 Checking ONOS service - PASS
- 71.8 Starting ONOS CLI sessions - PASS
- 71.9 Checking ONOS nodes - PASS
- 71.10 Checking ONOS applications - PASS
- 71.11 Starting Mininet Topology - PASS
- 71.12 Verify host IP address assignment in ONOS - FAIL Verify ONOS host IP failed
- PASS
- 71.13 Verify IP address assignment from hosts - PASS
- 71.13 14 Stopping Mininet - PASS Skipping the rest of this case.
- 71.15 Copying karaf logs - PASS