Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: Published from Jenkins build: https://jenkins.onosproject.org/job/SR-pipeline-2.0/1010/

...

HTML
<img src="https://jenkins.onosproject.org/view/QA/job/postjob-Fabric3/lastSuccessfulBuild/artifact/SRDhcprelay_onos-2.0_20-builds_graph.jpg", alt="SRDhcprelay", style="width:525px;height:350px;border:0">

commit 2ea2a92271da2184b936960302668d3a4978fa19 ea646e910b2a9d2607f8e3605109dbc893ba60b5 (HEAD -] onos-2.0, origin/onos-2.0)
Author: Thomas Vachuska [tom@opennetworking.orgONOS Jenkins User [jenkins@onlab.us]
AuthorDate: Thu Tue Jan 3 168 00:2632:53 36 2019 -0800+0000
Commit: Ray Milkey [ray@opennetworking.orgONOS Jenkins User [jenkins@onlab.us]
CommitDate: Fri Tue Jan 4 218 00:5432:50 36 2019 +0000
Fixing archetypes to compensate for missing transitive dependencies in pom.xml files.
Starting snapshot 2.0.0-SNAPSHOT

Case 1: DHCP v4 tests with 4 clients attached to switch directly and 1 server attached to switch directly, with 3 ONOS instances - PASS

...

  • 31.1 Apply cell to environment - PASS (tick)
  • 31.2 Uninstalling Atomix - PASS (tick)
  • 31.3 Uninstalling ONOS package - PASS (tick)
  • 31.4 Installing Atomix - PASS (tick)
  • 31.5 Installing ONOS package - PASS (tick)
  • 31.6 Set up ONOS secure SSH - PASS (tick)
  • 31.7 Checking ONOS service - PASS (tick)
  • 31.8 Starting ONOS CLI sessions - PASS (tick)
  • 31.9 Checking ONOS nodes - PASS (tick)
  • 31.10 Checking ONOS applications - PASS (tick)
  • 31.11 Starting Mininet Topology - PASS (tick)
  • 31.12 Verify host IP address assignment in ONOS - FAIL (error)
    • Verify ONOS host IP failed
  • 31.13 Stopping Mininet - PASS (tick)
    • Skipping the rest of this case.

Case 41: DHCP v4 tests with dual-homed hosts: 4 clients attached to switch directly and 1 server attached to switch directly, with 3 ONOS instances -

...

PASS

  • 41.1 Apply cell to environment - PASS (tick)
  • 41.2 Uninstalling Atomix - PASS (tick)
  • 41.3 Uninstalling ONOS package - PASS (tick)
  • 41.4 Installing Atomix - PASS (tick)
  • 41.5 Installing ONOS package - PASS (tick)
  • 41.6 Set up ONOS secure SSH - PASS (tick)
  • 41.7 Checking ONOS service - PASS (tick)
  • 41.8 Starting ONOS CLI sessions - PASS (tick)
  • 41.9 Checking ONOS nodes - PASS (tick)
  • 41.10 Checking ONOS applications - PASS (tick)
  • 41.11 Starting Mininet Topology - PASS (tick)
  • 41.12 Verify host IP address assignment in ONOS - FAIL (error)
  • Verify ONOS host IP failed
  • PASS (tick)
  • 41.13 Verify IP address assignment from hosts - PASS (tick)
  • 41.13 14 Stopping Mininet - PASS (tick)
  • Skipping the rest of this case.
  • 41.15 Copying karaf logs - PASS (tick)

Case 51: DHCP v6 tests with dual-homed hosts: 4 clients attached to switch directly and 1 server attached to switch directly, with 3 ONOS instances - PASS

...