Due to a ransomware attack, the wiki was reverted to a July 2022 version. . We apologize for the lack of a more recent valid backup.
...
HTML |
---|
<img src="https://jenkins.onosproject.org/view/QA/job/postjob-Fabric3/lastSuccessfulBuild/artifact/SRDhcprelay_onos-2.0_20-builds_graph.jpg", alt="SRDhcprelay", style="width:525px;height:350px;border:0"> |
commit 386bd345717017b3ce66ee3c5a6222e0cd3bbc7e 359f4d84608c44541c43bfc564893ac76c326063 (HEAD -] onos-2.0, origin/onos-2.0)
Author: gyewan.an [gyewan.an@samsungJon Hall [jhall@ciena.com]
AuthorDate: Mon Dec 24 11:47:57 2018 +0900Tue Jan 8 16:17:24 2019 -0800
Commit: Andrea Campanella Ray Milkey [andrea@opennetworkingray@opennetworking.org]
CommitDate: Wed Thu Jan 9 10 23:5330:39 32 2019 +0000
Implementation Cisco rest driver for Nexus 900
--
(cherry picked from commit a7d7bd95a1cbb16311dac72b08fedc557850d2bb)
(cherry picked from commit c7d9077049a783f23f03e615bb7b517675a394a1)
Allow use of rsync when fetching logs
Case 1: DHCP v4 tests with 4 clients attached to switch directly and 1 server attached to switch directly, with 3 ONOS instances - PASS
...
- 41.1 Apply cell to environment - PASS
- 41.2 Uninstalling Atomix - PASS
- 41.3 Uninstalling ONOS package - PASS
- 41.4 Installing Atomix - PASS
- 41.5 Installing ONOS package - PASS
- 41.6 Set up ONOS secure SSH - PASS
- 41.7 Checking ONOS service - PASS
- 41.8 Starting ONOS CLI sessions - PASS
- 41.9 Checking ONOS nodes - PASS
- 41.10 Checking ONOS applications - PASS
- 41.11 Starting Mininet Topology - PASS
- 41.12 Verify host IP address assignment in ONOS - PASS
- 41.13 Verify IP address assignment from hosts - PASS
- 41.14 Stopping Mininet - PASS
- 41.15 Copying karaf logs - PASS
Case 51: DHCP v6 tests with dual-homed hosts: 4 clients attached to switch directly and 1 server attached to switch directly, with 3 ONOS instances -
...
FAIL
- 51.1 Apply cell to environment - PASS
- 51.2 Uninstalling Atomix - PASS
- 51.3 Uninstalling ONOS package - PASS
- 51.4 Installing Atomix - PASS
- 51.5 Installing ONOS package - PASS
- 51.6 Set up ONOS secure SSH - PASS
- 51.7 Checking ONOS service - PASS
- 51.8 Starting ONOS CLI sessions - PASS
- 51.9 Checking ONOS nodes - PASS
- 51.10 Checking ONOS applications - PASS
- 51.11 Starting Mininet Topology - PASS
- 51.12 Verify host IP address assignment in ONOS - PASS 51.13 Verify IP address assignment from hosts - PASS FAIL
- Verify ONOS host IP failed
- 51.14 13 Stopping Mininet - PASS 51.15 Copying karaf logs - PASS
- Skipping the rest of this case.
Case 61: DHCP v4 tests with dual-homed tagged hosts: 4 clients attached to switch directly and 1 server attached to switch directly, with 3 ONOS instances - PASS
...