Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: Published from Jenkins build: https://jenkins.onosproject.org/job/SR-pipeline-2.0/1018/

...

HTML
<img src="https://jenkins.onosproject.org/view/QA/job/postjob-Fabric3/lastSuccessfulBuild/artifact/SRDhcprelay_onos-2.0_20-builds_graph.jpg", alt="SRDhcprelay", style="width:525px;height:350px;border:0">

commit a10f675028d2b297fb63b1fd4af1aade37801156 a60a2d9124f00e4cf7d8575a2756bac627fe9129 (HEAD -] onos-2.0, origin/onos-2.0)
Author: Carmelo Cascone Andrea Campanella [carmelo@opennetworkingandrea@opennetworking.org]
AuthorDate: Tue Sep Jan 15 11 15:17:23 2018 -070010:44 2019 +0100
Commit: Carmelo Cascone Thomas Vachuska [carmelo@opennetworkingtom@opennetworking.org]
CommitDate: Mon Tue Jan 14 1315 23:5501:26 48 2019 -0800+0000
ONOS-7887 Rename action profile-related entities
[ONOS-7882] Updating Yang Tools to 2.6.1 to address JSON serialization issue

Case 1: DHCP v4 tests with 4 clients attached to switch directly and 1 server attached to switch directly, with 3 ONOS instances - PASS

...

  • 2.1 Apply cell to environment - PASS (tick)
  • 2.2 Uninstalling Atomix - PASS (tick)
  • 2.3 Uninstalling ONOS package - PASS (tick)
  • 2.4 Installing Atomix - PASS (tick)
  • 2.5 Installing ONOS package - PASS (tick)
  • 2.6 Set up ONOS secure SSH - PASS (tick)
  • 2.7 Checking ONOS service - PASS (tick)
  • 2.8 Starting ONOS CLI sessions - PASS (tick)
  • 2.9 Checking ONOS nodes - PASS (tick)
  • 2.10 Checking ONOS applications - PASS (tick)
  • 2.11 Starting Mininet Topology - PASS (tick)
  • 2.12 Verify host IP address assignment in ONOS - PASS (tick)
  • 2.13 Verify IP address assignment from hosts - PASS (tick)
  • 2.14 Stopping Mininet - PASS (tick)
  • 2.15 Copying karaf logs - PASS (tick)

Case 11: DHCP v6 tests with 4 clients attached to switch directly and 1 server attached to switch directly, with 3 ONOS instances -

...

PASS

  • 11.1 Apply cell to environment - PASS (tick)
  • 11.2 Uninstalling Atomix - PASS (tick)
  • 11.3 Uninstalling ONOS package - PASS (tick)
  • 11.4 Installing Atomix - PASS (tick)
  • 11.5 Installing ONOS package - PASS (tick)
  • 11.6 Set up ONOS secure SSH - PASS (tick)
  • 11.7 Checking ONOS service - PASS (tick)
  • 11.8 Starting ONOS CLI sessions - PASS (tick)
  • 11.9 Checking ONOS nodes - PASS (tick)
  • 11.10 Checking ONOS applications - PASS (tick)
  • 11.11 Starting Mininet Topology - PASS (tick)
  • 11.12 Verify host IP address assignment in ONOS - FAIL (error)
  • Verify ONOS host IP failed
  • PASS (tick)
  • 11.13 Verify IP address assignment from hosts - PASS (tick)
  • 11.13 14 Stopping Mininet - PASS (tick)
  • Skipping the rest of this case.
  • 11.15 Copying karaf logs - PASS (tick)

Case 12: DHCP v6 tests with 4 clients attached to switch directly and 1 server attached to switch indirectly (via gateway), with 3 ONOS instances - FAIL

...