Due to a ransomware attack, the wiki was reverted to a July 2022 version. . We apologize for the lack of a more recent valid backup.
...
HTML |
---|
<img src="https://jenkins.onosproject.org/view/QA/job/postjob-Fabric3/lastSuccessfulBuild/artifact/SRDhcprelay_onos-2.0_20-builds_graph.jpg", alt="SRDhcprelay", style="width:525px;height:350px;border:0"> |
commit ddfaf16c995110f65bd2dd1d96b4fa874abc461a e22a6b197d3e84ab2b82c29d54e7bfae60190cc2 (HEAD -] onos-2.0, origin/onos-2.0)
Author: Ramon Casellas Andrea Campanella [ramonandrea@opennetworking.casellas@cttc.esorg]
AuthorDate: Thu Dec 20 11:59:43 2018 Wed Feb 27 16:10:08 2019 +0100
Commit: Andrea Campanella [andrea@opennetworking.org]
CommitDate: Fri Sun Mar 1 113 09:1319:13 01 2019 +0000
ONOS-7827 SIP for line ports (Photonic Media).
Minor fix for tapi helper and for TAPI Rpc error message
--
(cherry picked from commit c3d0bdbc6182d8d3420cbed72ec1ef2e600015da34694eb54af0cd89487a0ec2f308181d47dc29f6)
Case 1: DHCP v4 tests with 4 clients attached to switch directly and 1 server attached to switch directly, with 3 ONOS instances - PASS
...
- 31.1 Apply cell to environment - PASS
- 31.2 Uninstalling Atomix - PASS
- 31.3 Uninstalling ONOS package - PASS
- 31.4 Installing Atomix - PASS
- 31.5 Installing ONOS package - PASS
- 31.6 Set up ONOS secure SSH - PASS
- 31.7 Checking ONOS service - PASS
- 31.8 Starting ONOS CLI sessions - PASS
- 31.9 Checking ONOS nodes - PASS
- 31.10 Checking ONOS applications - PASS
- 31.11 Starting Mininet Topology - PASS
- 31.12 Verify host IP address assignment in ONOS - FAIL
- Verify ONOS host IP failed
- 31.13 Stopping Mininet - PASS
- Skipping the rest of this case.
Case 41: DHCP v4 tests with dual-homed hosts: 4 clients attached to switch directly and 1 server attached to switch directly, with 3 ONOS instances -
...
PASS
- 41.1 Apply cell to environment - PASS
- 41.2 Uninstalling Atomix - PASS
- 41.3 Uninstalling ONOS package - PASS
- 41.4 Installing Atomix - PASS
- 41.5 Installing ONOS package - PASS
- 41.6 Set up ONOS secure SSH - PASS
- 41.7 Checking ONOS service - PASS
- 41.8 Starting ONOS CLI sessions - PASS
- 41.9 Checking ONOS nodes - PASS
- 41.10 Checking ONOS applications - PASS
- 41.11 Starting Mininet Topology - PASS
- 41.12 Verify host IP address assignment in ONOS - FAIL Verify ONOS host IP failed
- PASS
- 41.13 Verify IP address assignment from hosts - PASS
- 41.13 14 Stopping Mininet - PASS Skipping the rest of this case.
- 41.15 Copying karaf logs - PASS
Case 51: DHCP v6 tests with dual-homed hosts: 4 clients attached to switch directly and 1 server attached to switch directly, with 3 ONOS instances - FAIL
...