Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: Published from Jenkins build: https://jenkins.onosproject.org/job/SR-pipeline-2.0/1093/

...

HTML
<img src="https://jenkins.onosproject.org/view/QA/job/postjob-Fabric3/lastSuccessfulBuild/artifact/SRDhcprelay_onos-2.0_20-builds_graph.jpg", alt="SRDhcprelay", style="width:525px;height:350px;border:0">

commit 830507e8a8a7547d02194dce8cde35bb3c421d6d 85525a80e6820c12658b488883839f4f5f36a6bf (HEAD -] onos-2.0, origin/onos-2.0)
Author: Charles Chan pier [rascov@gmailpier@opennetworking.comorg]
AuthorDate: Wed Jan 2 13:46:16 2019 -0800Mon Apr 1 23:38:42 2019 -0700
Commit: Charles Chan [rascov@gmail.comPier Luigi Ventre [pier@opennetworking.org]
CommitDate: Sun Mar 31 01:18:45 2019 -0700
Address comments in gerrit 20328Wed Apr 3 18:47:13 2019 +0000

Remove listeners before shutting down the executors
--
(cherry picked from commit 024f44c902768868a136987b895b784f960a3e43)

Case 1: DHCP v4 tests with 4 clients attached to switch directly and 1 server attached to switch directly, with 3 ONOS instances - PASS

...

  • 31.1 Apply cell to environment - PASS (tick)
  • 31.2 Uninstalling Atomix - PASS (tick)
  • 31.3 Uninstalling ONOS package - PASS (tick)
  • 31.4 Installing Atomix - PASS (tick)
  • 31.5 Installing ONOS package - PASS (tick)
  • 31.6 Set up ONOS secure SSH - PASS (tick)
  • 31.7 Checking ONOS service - PASS (tick)
  • 31.8 Starting ONOS CLI sessions - PASS (tick)
  • 31.9 Checking ONOS nodes - PASS (tick)
  • 31.10 Checking ONOS applications - PASS (tick)
  • 31.11 Starting Mininet Topology - PASS (tick)
  • 31.12 Verify host IP address assignment in ONOS - FAIL (error)
    • Verify ONOS host IP failed
  • 31.13 Stopping Mininet - PASS (tick)
    • Skipping the rest of this case.

Case 41: DHCP v4 tests with dual-homed hosts: 4 clients attached to switch directly and 1 server attached to switch directly, with 3 ONOS instances -

...

PASS

  • 41.1 Apply cell to environment - PASS (tick)
  • 41.2 Uninstalling Atomix - PASS (tick)
  • 41.3 Uninstalling ONOS package - PASS (tick)
  • 41.4 Installing Atomix - PASS (tick)
  • 41.5 Installing ONOS package - PASS (tick)
  • 41.6 Set up ONOS secure SSH - PASS (tick)
  • 41.7 Checking ONOS service - PASS (tick)
  • 41.8 Starting ONOS CLI sessions - PASS (tick)
  • 41.9 Checking ONOS nodes - PASS (tick)
  • 41.10 Checking ONOS applications - PASS (tick)
  • 41.11 Starting Mininet Topology - PASS (tick)
  • 41.12 Verify host IP address assignment in ONOS - FAIL (error)
  • Verify ONOS host IP failed
  • PASS (tick)
  • 41.13 Verify IP address assignment from hosts - PASS (tick)
  • 41.13 14 Stopping Mininet - PASS (tick)
  • Skipping the rest of this case.
  • 41.15 Copying karaf logs - PASS (tick)

Case 51: DHCP v6 tests with dual-homed hosts: 4 clients attached to switch directly and 1 server attached to switch directly, with 3 ONOS instances - FAIL

...