Due to a ransomware attack, the wiki was reverted to a July 2022 version. . We apologize for the lack of a more recent valid backup.
...
HTML |
---|
<img src="https://jenkins.onosproject.org/view/QA/job/postjob-Fabric3/lastSuccessfulBuild/artifact/SRDhcprelay_onos-2.0_20-builds_graph.jpg", alt="SRDhcprelay", style="width:525px;height:350px;border:0"> |
commit 43a6d2e73b305623aa96b0d812b02e069a282c57 e6b9e6fd00037abbeafef7bb20e0ed01f848d278 (HEAD -] onos-2.0, origin/onos-2.0)
Author: Ray Milkey Carmelo Cascone [ray@opennetworkingcarmelo@opennetworking.org]
AuthorDate: Thu Apr 4 12:00:18 Mar 21 17:56:17 2019 -0700
Commit: Ray Milkey Charles Chan [ray@opennetworkingcharles@opennetworking.org]
CommitDate: Thu Mon Apr 4 128 21:0024:38 2019 -0700
Bump up required bazel version to 0.2359 2019 +0000
Re-enable route-service REST APIs
Case 1: DHCP v4 tests with 4 clients attached to switch directly and 1 server attached to switch directly, with 3 ONOS instances - PASS
...
- 1.1 Constructing test variables - PASS
- 1.2 Apply cell to environment - PASS
- 1.3 Uninstalling Atomix - PASS
- 1.4 Uninstalling ONOS package - PASS
- 1.5 Creating ONOS package - PASS
- 1.6 Installing Atomix - PASS
- 1.7 Installing ONOS package - PASS
- 1.8 Set up ONOS secure SSH - PASS
- 1.9 Checking ONOS service - PASS
- 1.10 Starting ONOS CLI sessions - PASS
- 1.11 Checking ONOS nodes - PASS
- 1.12 Checking ONOS applications - PASS
- 1.13 Starting Mininet Topology - PASS
- 1.14 Verify host IP address assignment in ONOS - PASS
- 1.15 Verify IP address assignment from hosts - PASS
- 1.16 Stopping Mininet - PASS
- 1.17 Copying karaf logs - PASS
Case 2: DHCP v4 tests with 4 clients attached to switch directly and 1 server attached to switch indirectly (via gateway), with 3 ONOS instances -
...
PASS
- 2.1 Apply cell to environment - PASS
- 2.2 Uninstalling Atomix - PASS
- 2.3 Uninstalling ONOS package - PASS
- 2.4 Installing Atomix - PASS
- 2.5 Installing ONOS package - PASS
- 2.6 Set up ONOS secure SSH - PASS
- 2.7 Checking ONOS service - PASS
- 2.8 Starting ONOS CLI sessions - PASS
- 2.9 Checking ONOS nodes - PASS
- 2.10 Checking ONOS applications - PASS
- 2.11 Starting Mininet Topology - PASS
- 2.12 Verify host IP address assignment in ONOS - FAIL Verify ONOS host IP failed
- PASS
- 2.13 Verify IP address assignment from hosts - PASS
- 2.13 14 Stopping Mininet - PASS Skipping the rest of this case.
- 2.15 Copying karaf logs - PASS
Case 11: DHCP v6 tests with 4 clients attached to switch directly and 1 server attached to switch directly, with 3 ONOS instances - PASS
...