Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: Published from Jenkins build: https://jenkins.onosproject.org/job/SR-pipeline-2.1/4/

...

HTML
<img src="https://jenkins.onosproject.org/view/QA/job/postjob-Fabric3/lastSuccessfulBuild/artifact/SRBridging_onos-2.1_20-builds_graph.jpg", alt="SRBridging", style="width:525px;height:350px;border:0">

commit be87e440a31f6ef1e3ea2c9adfce65deebfb936f 74e1c8af0d78aad4c4f941fa1f96f0aa571b5935 (HEAD -] onos-2.1, origin/onos-2.1)
Author: Ray Milkey [ray@opennetworking.org]
AuthorDate: Wed Thu Apr 24 1325 19:4500:18 40 2019 -0700
Commit: Ray Milkey [ray@opennetworking.org]
CommitDate: Wed Thu Apr 24 2225 19:1100:14 2019 +0000
Fix build behind web proxy - provide all jars needed by grpc java
--
(cherry picked from commit efb6cc53df699e2e9efb8ccfd96af0d539f918be)
40 2019 -0700

Put a file in the empty jar

Case 5: Bridging test between two untagged hosts on vlan-untagged port, with single ToR and 3 ONOS instances - PASS

...

  • 5.1 Constructing test variables - PASS (tick)
  • 5.2 Apply cell to environment - PASS (tick)
  • 5.3 Uninstalling Atomix - PASS (tick)
  • 5.4 Uninstalling ONOS package - PASS (tick)
  • 5.5 Creating ONOS package - PASS (tick)
  • 5.6 Installing Atomix - PASS (tick)
  • 5.7 Installing ONOS package - PASS (tick)
  • 5.8 Set up ONOS secure SSH - PASS (tick)
  • 5.9 Checking ONOS service - PASS (tick)
  • 5.10 Starting ONOS CLI sessions - PASS (tick)
  • 5.11 Checking ONOS nodes - PASS (tick)
  • 5.12 Checking ONOS applications - PASS (tick)
  • 5.13 Starting Mininet Topology - PASS (tick)
  • 5.14 Check whether the flow count is bigger than 28 - PASS (tick)
  • 5.15 Check whether all flow status are ADDED - PASS (tick)
  • 5.16 Check whether the flow count of device of:0000000000000001 is bigger than 28 - PASS (tick)
  • 5.17 Verify full connectivity for [u'h1', u'h2'] with tag CASE5 - PASS (tick)
  • 5.18 Stopping Mininet - PASS (tick)
  • 5.19 Copying karaf logs - PASS (tick)

Case 6: Bridging test between two untagged hosts on vlan-untagged port, with dual-homed ToR and 3 ONOS instances -

...

PASS

  • 6.1 Apply cell to environment - PASS (tick)
  • 6.2 Uninstalling Atomix - PASS (tick)
  • 6.3 Uninstalling ONOS package - PASS (tick)
  • 6.4 Installing Atomix - PASS (tick)
  • 6.5 Installing ONOS package - PASS (tick)
  • 6.6 Set up ONOS secure SSH - PASS (tick)
  • 6.7 Checking ONOS service - PASS (tick)
  • 6.8 Starting ONOS CLI sessions - PASS (tick)
  • 6.9 Checking ONOS nodes - PASS (tick)
  • 6.10 Checking ONOS applications - PASS (tick)
  • 6.11 Starting Mininet Topology - PASS (tick)
  • 6.12 Check whether the flow count is bigger than 74 - PASS (tick)
  • 6.13 Check whether all flow status are ADDED - PASS (tick)
  • 6.14 Check whether the flow count of device of:0000000000000001 is bigger than 37 - PASS (tick)
  • 6.15 Check whether the flow count of device of:0000000000000002 is bigger than 37 - PASS (tick)
  • 6.16 Verify full connectivity for [u'h1', u'h2'] with tag CASE6 - FAIL (error)
    • IP connectivity failed
  • PASS (tick)
  • 6.17 Stopping Mininet - PASS (tick)
  • 6.18 Copying karaf logs - PASS (tick)

...

  • 15.1 Apply cell to environment - PASS (tick)
  • 15.2 Uninstalling Atomix - PASS (tick)
  • 15.3 Uninstalling ONOS package - PASS (tick)
  • 15.4 Installing Atomix - PASS (tick)
  • 15.5 Installing ONOS package - PASS (tick)
  • 15.6 Set up ONOS secure SSH - PASS (tick)
  • 15.7 Checking ONOS service - PASS (tick)
  • 15.8 Starting ONOS CLI sessions - PASS (tick)
  • 15.9 Checking ONOS nodes - PASS (tick)
  • 15.10 Checking ONOS applications - PASS (tick)
  • 15.11 Starting Mininet Topology - PASS (tick)
  • 15.12 Check whether the flow count is bigger than 28 - PASS (tick)
  • 15.13 Check whether all flow status are ADDED - PASS (tick)
  • 15.14 Check whether the flow count of device of:0000000000000001 is bigger than 28 - PASS (tick)
  • 15.15 Verify full connectivity for [u'h1', u'h2'] with tag CASE15 - PASS (tick)
  • 15.16 Stopping Mininet - PASS (tick)
  • 15.17 Copying karaf logs - PASS (tick)

Case 16: Bridging test between two tagged hosts, with dual-homed ToR and 3 ONOS instances -

...

FAIL

  • 16.1 Apply cell to environment - PASS (tick)
  • 16.2 Uninstalling Atomix - PASS (tick)
  • 16.3 Uninstalling ONOS package - PASS (tick)
  • 16.4 Installing Atomix - PASS (tick)
  • 16.5 Installing ONOS package - PASS (tick)
  • 16.6 Set up ONOS secure SSH - PASS (tick)
  • 16.7 Checking ONOS service - PASS (tick)
  • 16.8 Starting ONOS CLI sessions - PASS (tick)
  • 16.9 Checking ONOS nodes - PASS (tick)
  • 16.10 Checking ONOS applications - PASS (tick)
  • 16.11 Starting Mininet Topology - PASS (tick)
  • 16.12 Check whether the flow count is bigger than 74 - PASS (tick)
  • 16.13 Check whether all flow status are ADDED - PASS (tick)
  • 16.14 Check whether the flow count of device of:0000000000000001 is bigger than 37 - PASS (tick)
  • 16.15 Check whether the flow count of device of:0000000000000002 is bigger than 37 - PASS (tick)FAIL (error)
    • Flow count looks wrong: 22
  • 16.16 Verify full connectivity for [u'h1', u'h2'] with tag CASE16 - PASS (tick)FAIL (error)
    • IP connectivity failed
  • 16.17 Stopping Mininet - PASS (tick)
  • 16.18 Copying karaf logs - PASS (tick)

...