Due to a ransomware attack, the wiki was reverted to a July 2022 version. . We apologize for the lack of a more recent valid backup.
...
HTML |
---|
<img src="https://jenkins.onosproject.org/view/QA/job/postjob-VM/lastSuccessfulBuild/artifact/FUNCipv6Intent_master_20-builds_graph.jpg", alt="FUNCipv6Intent", style="width:525px;height:350px;border:0"> |
commit b81121fc2162de37dec87d19bdd928ff3ab5e099 812460da2788cb8b6dc72057a7ee71047af96cee (HEAD -] master, origin/master, origin/HEAD)
Author: Yi Tseng Jian Li [yi@opennetworkingpyguni@gmail.orgcom]
AuthorDate: Tue Mon May 7 1613 15:5141:05 30 2019 -0700+0900
Commit: Yi Tseng Jian Li [yi@opennetworkingpyguni@gmail.orgcom]
CommitDate: Tue May 7 18Mon May 13 07:53:36 :46 2019 -0700
[ONOS-7982] Remove P4Config+0000
Support to query active status of the nodes through REST API
Case 1: Pull onos branch and build onos on Teststation. - PASS
...
- 3000.1 NOOPTION: Add single point to multi point intents - PASS
- 3000.2 IPV6: Add single point to multi point intents - PASS
- 3000.3 IPV6_2: Add single point to multi point intents - PASS
- 3000.4 VLAN: Add single point to multi point intents - PASS
Case 4000: Multi To Single Point Intents Test - 1 NODE(S) - OF 1.3 -
...
FAIL
This test case will test single point to multi point intents using 1 node(s) cluster; Different type of hosts will be tested in each step such as IPV6, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet
- 4000.1 NOOPTION: Add multi point to single point intents - PASS FAIL
- Assertion results for NOOPTION multi to single point intent
- Initial Intent State Failed
- Initial Flow Count Passed
- Initial Flow State Passed
- Initial Ping6all Passed
- Link Down Passed
- Link Down Topology State Passed
- Link Down Ping6all Passed
- Link Down Intent State Failed
- Link Up Passed
- Link Up Topology State Passed
- Link Up Ping6all Passed
- Link Up Intent State Failed
- Remove Intents Failed
- 4000.2 IPV6: Add multi point to single point intents - PASS
- 4000.3 IPV6_2: Add multi point to single point intents - PASS FAIL
- Assertion results for IPV6 multi to single point intent with IPV6 type and no MAC addresses
- Initial Flow Count Passed
- Initial Flow State Passed
- Initial Ping6all Failed
- Remove Intents Failed
- 4000.4 VLAN: Add multi point to single point intents - PASS FAIL
- Assertion results for IPV6 multi to single point intent with IPV6 type and no MAC addresses in the same VLAN
- Initial Flow Count Passed
- Initial Flow State Passed
- Initial Ping6all Failed
- Remove Intents Failed
Case 5000: Test host mobility with host intents - No Result
...