HTML |
---|
<img src="https://jenkins.onosproject.org/view/QA/job/postjob-VM/lastSuccessfulBuild/artifact/FUNCintentRest_master_20-builds_graph.jpg", alt="FUNCintentRest", style="width:525px;height:350px;border:0"> |
commit b53d626fb03195129c0ec0802e1f953f85dcbef8 (HEAD, origin/master, origin/HEAD, master)
Author: pierventre [pier@opennetworking.org]
AuthorDate: Wed Sep 22 11:24:38 2021 +0200
Commit: Pier Luigi Ventre [pier@opennetworking.org]
CommitDate: Thu Sep 23 07:38:36 2021 +0000
[SDFAB-612] Cluster not ready when using recent tost master images
--
(cherry picked from commit ec0e942320ef27932b4173172055151015261d7c)
Case 1: Pull onos branch and build onos on Teststation. - PASS
For loading from
Case 1: Constructing test variables and building ONOS package - PASS
This test case is mainly for loading from params file, and pull and build the latest ONOS package
...
Set up ONOS with 1 node(s) ONOS cluster
- 2.1 Uninstalling ONOS package Apply cell to environment - PASS
- 2.2 Apply cell to environment Uninstalling Atomix - PASS
- 2.3 Creating Uninstalling ONOS package - PASS
- 2.4 Installing Creating ONOS package - PASS
- 2.5 Starting ONOS service Installing Atomix - PASS
- 2.6 Installing ONOS package - PASS
- 2.6 Start ONOS cli 7 Set up ONOS secure SSH - PASS
Case 10: Start Mininet topology with OF 1.0 switches - PASS
- 2.8 Checking ONOS service - PASS
- 2.9 Starting ONOS CLI sessions - PASS
- 2.10 Checking ONOS nodes - PASS
- 2.11 Checking ONOS applications - PASS
Case 10: Start Mininet topology with OF 1.0 switches - PASS
Start mininet topology with OF 1.0 switches to test intents, exits out if topology Start mininet topology with OF 1.0 switches to test intents, exits out if topology did not start correctly
- 10.1 Starting Mininet topology with OF 1.0 switches - PASS
...
- 16.1 Balancing mastership of switches - PASS
Case 1000: Host Intents Test - 1 NODE(S) - OF 1.0 - Using Flow Rules - PASS
This test case tests Host intents using 1 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.0 OVS running in Mininet and compile intents using Flow Rules
- 1000.1 IPV4: Add and test host intents between h1 and h9 - PASS
- 1000.2 DUALSTACK1: Add host intents between h3 and h11 - PASS
- 1000.3 DUALSTACK2: Add host intents between h1 and h11 - PASS
- 1000.4 1HOP: Add host intents between h1 and h3 - PASS
- 1000.5 VLAN1: Add vlan host intents between h4 and h12 - PASS
- 1000.6 VLAN2: Add inter vlan host intents between h13 and h20 - PASS 1000.7 Confirm that ONOS leadership Confirm that ONOS leadership is unchanged - PASS
Case 2000: Point Intents Test - 1 NODE(S) - OF 1.0 - Using Flow Rules - PASS
This test case will test point to point intents using 1 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.0 OVS running in Mininet and compile intents using Flow Rules
- 2000.1 NOOPTION: Add point intents between h1 and h9 - PASS
- 2000.2 IPV4: Add point intents between h1 and h9 - PASS
- 2000.3 IPV4_2: Add point intents between h1 and h9 - PASS
- 2000.4 SDNIP-ICMP: Add point intents between h1 and h9 - PASS
- 2000.5 SDNIP-TCP: Add point intents between h1 and h9 - PASS
- 2000.6 DUALSTACK1: Add point intents between h3 and h11 - PASS
- 2000.7 VLAN: Add point intents between h5 and h21 - PASS
- 2000.8 1HOP: Add point intents between h1 and h3 - PASS
Case
...
3000:
...
Single to Multi Point Intents Test - 1 NODE(S) - OF 1.0 - Using Flow Rules - FAIL
This test case will test single point to multi point intents using 1 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.0 OVS running in Mininet and compile intents using Flow Rules
- 3000.1 NOOPTION: Install and test single point to multi point intents - FAIL
- Assertion results for IPV4 single to multi point intent with no options set
- 3000.2 IPV4: Install and test single point to multi point intents - FAIL
- Assertion results for IPV4 single to multi point intent with IPV4 type and MAC addresses
- 3000.3 IPV4_2: Add single point to multi point intents - FAIL
- Assertion results for IPV4 single to multi point intent with IPV4 type and no MAC addresses
- 3000.4 VLAN: Add single point to multi point intents - FAIL
- Assertion results for IPV4 single to multi point intent with IPV4 type and MAC addresses in the same VLAN
- 3000.5 VLAN: Add single point to multi point intents - FAIL
- Assertion results for single to multi point intent with VLAN treatment
Case 5000: Test host mobility with host intents - PASS
- 5000.1 Testing host mobility by moving h1 from s5 to s6 - PASS
- 5000.2 IPV4: Add host intents between h1 and h9 - PASS
Case 18: Stop Mininet and Scapy - PASS
Stopping the current mininet topology to start up fresh
- 18.1 Stopping and Removing Scapy Host Components - PASS
- 18.2 Stopping Mininet - PASS
Case 19: Copy karaf logs - PASS
Copying the karaf logs to preserve them throughreinstalling ONOS
- 19.1 Copying karaf logs - PASS
Case 2: Starting up 3 node(s) ONOS cluster - PASS
Set up ONOS with 3 node(s) ONOS cluster
- 2.1 Apply cell to environment - PASS
- 2.2 Uninstalling Atomix - PASS
- 2.3 Uninstalling ONOS package - PASS
- 2.4 Creating ONOS package - PASS
- 2.5 Installing Atomix - PASS
- 2.6 Installing ONOS package - PASS
- 2.7 Set up ONOS secure SSH - PASS
- 2.8 Checking ONOS service - PASS
- 2.9 Starting ONOS CLI sessions - PASS
- 2.10 Checking ONOS nodes - PASS
- 2.11 Checking ONOS applications - PASS
Case 10: Start Mininet topology with OF 1.0 switches - PASS
Start mininet topology with OF 1.0 switches to test intents, exits out if topology did not start correctly
- 10.1 Starting Mininet topology with OF 1.0 switches - PASS
Case 12: Assign switches to controllers - PASS
Assign OF 1.0 switches to ONOS nodes
- 12.1 Assigning switches to controllers - PASS
Case 13: Create scapy components - PASS
- 13.1 Create scapy components - No Result
- 13.2 Start scapy components - PASS
Case 15: Discover all hosts using scapy - PASS
- 15.1 Send packets from each host to the first host and confirm onos discovery - PASS
- 15.2 Populate hostsData - PASS
Case 16: Balance mastership of switches - PASS
- 16.1 Balancing mastership of switches - PASS
Case 1000: Host Intents Test - 3 NODE(S) - OF 1.0 - Using Flow Rules - PASS
This test case tests Host intents using 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.0 OVS running in Mininet and compile intents using Flow Rules
- 1000.1 IPV4: Add and test host intents between h1 and h9 - PASS
- 1000.2 DUALSTACK1: Add host intents between h3 and h11 - PASS
- 1000.3 DUALSTACK2: Add host intents between h1 and h11 - PASS
- 1000.4 1HOP: Add host intents between h1 and h3 - PASS
- 1000.5 VLAN1: Add vlan host intents between h4 and h12 - PASS
- 1000.6 Confirm that ONOS leadership is unchanged - PASS
Case 2000: Point Intents Test - 3 NODE(S) - OF 1.0 - Using Flow Rules - PASS
This test case will test point to point intents using 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.0 OVS running in Mininet and compile intents using Flow Rules
- 2000.1 NOOPTION: Add point intents between h1 and h9 - PASS
- 2000.2 IPV4: Add point intents between h1 and h9 - PASS
- 2000.3 IPV4_2: Add point intents between h1 and h9 - PASS
- 2000.4 SDNIP-ICMP: Add point intents between h1 and h9 - PASS
- 2000.5 SDNIP-TCP: Add point intents between h1 and h9 - PASS
- 2000.6 DUALSTACK1: Add point intents between h3 and h11 - PASS
- 2000.7 VLAN: Add point intents between h5 and h21 - PASS
- 2000.8 1HOP: Add point intents between h1 and h3 - PASS
Case 3000: Single to Multi Point Intents Test - 3 NODE(S) - OF 1.0 - Using Flow Rules - FAIL
This test case will test single point to multi point intents using 3
- 5000.1 Testing host mobility by moving h1 from s5 to s6 - PASS
- 5000.2 IPV4: Add host intents between h1 and h9 - PASS
Case 17: Stop Mininet and Scapy - PASS
Stopping the current mininet topology to start up fresh
- 17.1 Stopping and Removing Scapy Host Components - PASS
- 17.2 Stopping Mininet Topology - PASS
Case 2: Starting up 3 node(s) ONOS cluster - PASS
Set up ONOS with 3 node(s) ONOS cluster
- 2.1 Uninstalling ONOS package - PASS
- 2.2 Apply cell to environment - PASS
- 2.3 Creating ONOS package - PASS
- 2.4 Installing ONOS package - PASS
- 2.5 Starting ONOS service - PASS
- 2.6 Start ONOS cli - PASS
Case 10: Start Mininet topology with OF 1.0 switches - PASS
Start mininet topology with OF 1.0 switches to test intents, exits out if topology did not start correctly
- 10.1 Starting Mininet topology with OF 1.0 switches - PASS
Case 12: Assign switches to controllers - PASS
Assign OF 1.0 switches to ONOS nodes
- 12.1 Assigning switches to controllers - PASS
Case 13: Create scapy components - PASS
- 13.1 Create scapy components - No Result
- 13.2 Start scapy components - PASS
Case 15: Discover all hosts using scapy - PASS
- 15.1 Send packets from each host to the first host and confirm onos discovery - PASS
- 15.2 Populate hostsData - PASS
Case 16: Balance mastership of switches - PASS
- 16.1 Balancing mastership of switches - PASS
Case 1000: Host Intents Test - 3 NODE(S) - OF 1.0 - PASS
This test case tests Host intents using 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.0 OVS running in Mininet
- 1000.1 IPV4: Add and test host intents between h1 and h9 - PASS
- 1000.2 DUALSTACK1: Add host intents between h3 and h11 - PASS
- 1000.3 DUALSTACK2: Add host intents between h1 and h11 - PASS
- 1000.4 1HOP: Add host intents between h1 and h3 - PASS
- 1000.5 VLAN1: Add vlan host intents between h4 and h12 - PASS
- 1000.6 VLAN2: Add inter vlan host intents between h13 and h20 - PASS
- 1000.7 Confirm that ONOS leadership is unchanged - PASS
Case 2000: Point Intents Test - 3 NODE(S) - OF 1.0 - PASS
This test case will test point to point intents using 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.0 OVS running in Mininet
- 2000.1 NOOPTION: Add point intents between h1 and h9 - PASS
- 2000.2 IPV4: Add point intents between h1 and h9 - PASS
- 2000.3 IPV4_2: Add point intents between h1 and h9 - PASS
- 2000.4 SDNIP-ICMP: Add point intents between h1 and h9 - PASS
- 2000.5 SDNIP-TCP: Add point intents between h1 and h9 - PASS
- 2000.6 DUALSTACK1: Add point intents between h3 and h11 - PASS
- 2000.7 VLAN: Add point intents between h5 and h21 - PASS
- 2000.8 1HOP: Add point intents between h1 and h3 - PASS
Case 5000: Test host mobility with host intents - PASS
- 5000.1 Testing host mobility by moving h1 from s5 to s6 - PASS
- 5000.2 IPV4: Add host intents between h1 and h9 - PASS
Case 17: Stop Mininet and Scapy - PASS
Stopping the current mininet topology to start up fresh
- 17.1 Stopping and Removing Scapy Host Components - PASS
- 17.2 Stopping Mininet Topology - PASS
Case 2: Starting up 1 node(s) ONOS cluster - PASS
Set up ONOS with 1 node(s) ONOS cluster
- 2.1 Uninstalling ONOS package - PASS
- 2.2 Apply cell to environment - PASS
- 2.3 Creating ONOS package - PASS
- 2.4 Installing ONOS package - PASS
- 2.5 Starting ONOS service - PASS
- 2.6 Start ONOS cli - PASS
Case 11: Start Mininet topology with OF 1.3 switches - PASS
Start mininet topology with OF 1.3 switches to test intents, exits out if topology did not start correctly
- 11.1 Starting Mininet topology with OF 1.3 switches - PASS
Case 12: Assign switches to controllers - PASS
Assign OF 1.3 switches to ONOS nodes
- 12.1 Assigning switches to controllers - PASS
Case 13: Create scapy components - PASS
- 13.1 Create scapy components - No Result
- 13.2 Start scapy components - PASS
Case 15: Discover all hosts using scapy - PASS
- 15.1 Send packets from each host to the first host and confirm onos discovery - PASS
- 15.2 Populate hostsData - PASS
Case 16: Balance mastership of switches - PASS
- 16.1 Balancing mastership of switches - PASS
Case 1000: Host Intents Test - 1 NODE(S) - OF 1.3 - PASS
This test case tests Host intents using 1 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet
- 1000.1 IPV4: Add and test host intents between h1 and h9 - PASS
- 1000.2 DUALSTACK1: Add host intents between h3 and h11 - PASS
- 1000.3 DUALSTACK2: Add host intents between h1 and h11 - PASS
- 1000.4 1HOP: Add host intents between h1 and h3 - PASS
- 1000.5 VLAN1: Add vlan host intents between h4 and h12 - PASS
- 1000.6 VLAN2: Add inter vlan host intents between h13 and h20 - PASS
- 1000.7 Confirm that ONOS leadership is unchanged - PASS
Case 2000: Point Intents Test - 1 NODE(S) - OF 1.3 - PASS
This test case will test point to point intents using 1 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet
- 2000.1 NOOPTION: Add point intents between h1 and h9 - PASS
- 2000.2 IPV4: Add point intents between h1 and h9 - PASS
- 2000.3 IPV4_2: Add point intents between h1 and h9 - PASS
- 2000.4 SDNIP-ICMP: Add point intents between h1 and h9 - PASS
- 2000.5 SDNIP-TCP: Add point intents between h1 and h9 - PASS
- 2000.6 DUALSTACK1: Add point intents between h3 and h11 - PASS
- 2000.7 VLAN: Add point intents between h5 and h21 - PASS
- 2000.8 1HOP: Add point intents between h1 and h3 - PASS
Case 5000: Test host mobility with host intents - PASS
- 5000.1 Testing host mobility by moving h1 from s5 to s6 - PASS
- 5000.2 IPV4: Add host intents between h1 and h9 - PASS
Case 17: Stop Mininet and Scapy - PASS
Stopping the current mininet topology to start up fresh
- 17.1 Stopping and Removing Scapy Host Components - PASS
- 17.2 Stopping Mininet Topology - PASS
Case 2: Starting up 3 node(s) ONOS cluster - PASS
Set up ONOS with 3 node(s) ONOS cluster
- 2.1 Uninstalling ONOS package - PASS
- 2.2 Apply cell to environment - PASS
- 2.3 Creating ONOS package - PASS
- 2.4 Installing ONOS package - PASS
- 2.5 Starting ONOS service - PASS
- 2.6 Start ONOS cli - PASS
Case 11: Start Mininet topology with OF 1.3 switches - PASS
Start mininet topology with OF 1.3 switches to test intents, exits out if topology did not start correctly
- 11.1 Starting Mininet topology with OF 1.3 switches - PASS
Case 12: Assign switches to controllers - PASS
Assign OF 1.3 switches to ONOS nodes
- 12.1 Assigning switches to controllers - PASS
Case 13: Create scapy components - PASS
- 13.1 Create scapy components - No Result
- 13.2 Start scapy components - PASS
Case 15: Discover all hosts using scapy - PASS
- 15.1 Send packets from each host to the first host and confirm onos discovery - PASS
- 15.2 Populate hostsData - PASS
Case 16: Balance mastership of switches - PASS
- 16.1 Balancing mastership of switches - PASS
...
0 OVS running in Mininet and compile intents using Flow Rules
- 3000.1 NOOPTION: Install and test single point to multi point intents - FAIL
- Assertion results for IPV4 single to multi point intent with no options set
- 3000.2 IPV4: Install and test single point to multi point intents - FAIL
- Assertion results for IPV4 single to multi point intent with IPV4 type and MAC addresses
- 3000.3 IPV4_2: Add single point to multi point intents - FAIL
- Assertion results for IPV4 single to multi point intent with IPV4 type and no MAC addresses
- 3000.4 VLAN: Add single point to multi point intents - FAIL
- Assertion results for IPV4 single to multi point intent with IPV4 type and MAC addresses in the same VLAN
- 3000.5 VLAN: Add single point to multi point intents - FAIL
- Assertion results for single to multi point intent with VLAN treatment
Case 5000: Test host mobility with host intents - PASS
- 5000.1 Testing host mobility by moving h1 from s5 to s6 - PASS
- 5000.2 IPV4: Add host intents between h1 and h9 - PASS
Case 18: Stop Mininet and Scapy - PASS
Stopping the current mininet topology to start up fresh
- 18.1 Stopping and Removing Scapy Host Components - PASS
- 18.2 Stopping Mininet - PASS
Case 19: Copy karaf logs - PASS
Copying the karaf logs to preserve them throughreinstalling ONOS
- 19.1 Copying karaf logs - PASS
Case 2: Starting up 1 node(s) ONOS cluster - PASS
Set up ONOS with 1 node(s) ONOS cluster
- 2.1 Apply cell to environment - PASS
- 2.2 Uninstalling Atomix - PASS
- 2.3 Uninstalling ONOS package - PASS
- 2.4 Creating ONOS package - PASS
- 2.5 Installing Atomix - PASS
- 2.6 Installing ONOS package - PASS
- 2.7 Set up ONOS secure SSH - PASS
- 2.8 Checking ONOS service - PASS
- 2.9 Starting ONOS CLI sessions - PASS
- 2.10 Checking ONOS nodes - PASS
- 2.11 Checking ONOS applications - PASS
Case 10: Start Mininet topology with OF 1.0 switches - PASS
Start mininet topology with OF 1.0 switches to test intents, exits out if topology did not start correctly
- 10.1 Starting Mininet topology with OF 1.0 switches - PASS
Case 12: Assign switches to controllers - PASS
Assign OF 1.0 switches to ONOS nodes
- 12.1 Assigning switches to controllers - PASS
Case 13: Create scapy components - PASS
- 13.1 Create scapy components - No Result
- 13.2 Start scapy components - PASS
Case 15: Discover all hosts using scapy - PASS
- 15.1 Send packets from each host to the first host and confirm onos discovery - PASS
- 15.2 Populate hostsData - PASS
Case 16: Balance mastership of switches - PASS
- 16.1 Balancing mastership of switches - PASS
Case 17: Enable intent compilation using Flow Objectives - PASS
- 17.1 Enabling Flow Objectives - PASS
Case 1000: Host Intents Test - 1 NODE(S) - OF 1.0 - Using Flow Objectives - PASS
This test case tests Host intents using 1 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.0 OVS running in Mininet and compile intents using Flow Objectives
- 1000.1 IPV4: Add and test host intents between h1 and h9 - PASS
- 1000.2 DUALSTACK1: Add host intents between h3 and h11 - PASS
- 1000.3 DUALSTACK2: Add host intents between h1 and h11 - PASS
- 1000.4 1HOP: Add host intents between h1 and h3 - PASS
- 1000.5 VLAN1: Add vlan host intents between h4 and h12 - PASS
- 1000.6 Confirm that ONOS leadership is unchanged - PASS
Case 2000: Point Intents Test - 1 NODE(S) - OF 1.0 - Using Flow Objectives - PASS
This test case will test point to point intents using 1 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.0 OVS running in Mininet and compile intents using Flow Objectives
- 2000.1 NOOPTION: Add point intents between h1 and h9 - PASS
- 2000.2 IPV4: Add point intents between h1 and h9 - PASS
- 2000.3 IPV4_2: Add point intents between h1 and h9 - PASS
- 2000.4 SDNIP-ICMP: Add point intents between h1 and h9 - PASS
- 2000.5 SDNIP-TCP: Add point intents between h1 and h9 - PASS
- 2000.6 DUALSTACK1: Add point intents between h3 and h11 - PASS
- 2000.7 VLAN: Add point intents between h5 and h21 - PASS
- 2000.8 1HOP: Add point intents between h1 and h3 - PASS
Case 3000: Single to Multi Point Intents Test - 1 NODE(S) - OF 1.0 - Using Flow Objectives - FAIL
This test case will test single point to multi point intents using 1 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.0 OVS running in Mininet and compile intents using Flow Objectives
- 3000.1 NOOPTION: Install and test single point to multi point intents - FAIL
- Assertion results for IPV4 single to multi point intent with no options set
- 3000.2 IPV4: Install and test single point to multi point intents - FAIL
- Assertion results for IPV4 single to multi point intent with IPV4 type and MAC addresses
- 3000.3 IPV4_2: Add single point to multi point intents - FAIL
- Assertion results for IPV4 single to multi point intent with IPV4 type and no MAC addresses
- 3000.4 VLAN: Add single point to multi point intents - FAIL
- Assertion results for IPV4 single to multi point intent with IPV4 type and MAC addresses in the same VLAN
- 3000.5 VLAN: Add single point to multi point intents - FAIL
- Assertion results for single to multi point intent with VLAN treatment
Case 5000: Test host mobility with host intents - PASS
- 5000.1 Testing host mobility by moving h1 from s5 to s6 - PASS
- 5000.2 IPV4: Add host intents between h1 and h9 - PASS
Case 18: Stop Mininet and Scapy - PASS
Stopping the current mininet topology to start up fresh
- 18.1 Stopping and Removing Scapy Host Components - PASS
- 18.2 Stopping Mininet - PASS
Case 19: Copy karaf logs - PASS
Copying the karaf logs to preserve them throughreinstalling ONOS
- 19.1 Copying karaf logs - PASS
Case 2: Starting up 3 node(s) ONOS cluster - PASS
Set up ONOS with 3 node(s) ONOS cluster
- 2.1 Apply cell to environment - PASS
- 2.2 Uninstalling Atomix - PASS
- 2.3 Uninstalling ONOS package - PASS
- 2.4 Creating ONOS package - PASS
- 2.5 Installing Atomix - PASS
- 2.6 Installing ONOS package - PASS
- 2.7 Set up ONOS secure SSH - PASS
- 2.8 Checking ONOS service - PASS
- 2.9 Starting ONOS CLI sessions - PASS
- 2.10 Checking ONOS nodes - PASS
- 2.11 Checking ONOS applications - PASS
Case 10: Start Mininet topology with OF 1.0 switches - PASS
Start mininet topology with OF 1.0 switches to test intents, exits out if topology did not start correctly
- 10.1 Starting Mininet topology with OF 1.0 switches - PASS
Case 12: Assign switches to controllers - PASS
Assign OF 1.0 switches to ONOS nodes
- 12.1 Assigning switches to controllers - PASS
Case 13: Create scapy components - PASS
- 13.1 Create scapy components - No Result
- 13.2 Start scapy components - PASS
Case 15: Discover all hosts using scapy - PASS
- 15.1 Send packets from each host to the first host and confirm onos discovery - PASS
- 15.2 Populate hostsData - PASS
Case 16: Balance mastership of switches - PASS
- 16.1 Balancing mastership of switches - PASS
Case 17: Enable intent compilation using Flow Objectives - PASS
- 17.1 Enabling Flow Objectives - PASS
Case 1000: Host Intents Test - 3 NODE(S) - OF 1.0 - Using Flow Objectives - PASS
This test case tests Host intents using 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.0 OVS running in Mininet and compile intents using Flow Objectives
- 1000.1 IPV4: Add and test host intents between h1 and h9 - PASS
- 1000.2 DUALSTACK1: Add host intents between h3 and h11 - PASS
- 1000.3 DUALSTACK2: Add host intents between h1 and h11 - PASS
- 1000.4 1HOP: Add host intents between h1 and h3 - PASS
- 1000.5 VLAN1: Add vlan host intents between h4 and h12 - PASS
- 1000.6 Confirm that ONOS leadership is unchanged - PASS
Case 2000: Point Intents Test - 3 NODE(S) - OF 1.0 - Using Flow Objectives - PASS
This test case will test point to point intents using 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.0 OVS running in Mininet and compile intents using Flow Objectives
- 2000.1 NOOPTION: Add point intents between h1 and h9 - PASS
- 2000.2 IPV4: Add point intents between h1 and h9 - PASS
- 2000.3 IPV4_2: Add point intents between h1 and h9 - PASS
- 2000.4 SDNIP-ICMP: Add point intents between h1 and h9 - PASS
- 2000.5 SDNIP-TCP: Add point intents between h1 and h9 - PASS
- 2000.6 DUALSTACK1: Add point intents between h3 and h11 - PASS
- 2000.7 VLAN: Add point intents between h5 and h21 - PASS
- 2000.8 1HOP: Add point intents between h1 and h3 - PASS
Case 3000: Single to Multi Point Intents Test - 3 NODE(S) - OF 1.0 - Using Flow Objectives - FAIL
This test case will test single point to multi point intents using 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.0 OVS running in Mininet and compile intents using Flow Objectives
- 3000.1 NOOPTION: Install and test single point to multi point intents - FAIL
- Assertion results for IPV4 single to multi point intent with no options set
- 3000.2 IPV4: Install and test single point to multi point intents - FAIL
- Assertion results for IPV4 single to multi point intent with IPV4 type and MAC addresses
- 3000.3 IPV4_2: Add single point to multi point intents - FAIL
- Assertion results for IPV4 single to multi point intent with IPV4 type and no MAC addresses
- 3000.4 VLAN: Add single point to multi point intents - FAIL
- Assertion results for IPV4 single to multi point intent with IPV4 type and MAC addresses in the same VLAN
- 3000.5 VLAN: Add single point to multi point intents - FAIL
- Assertion results for single to multi point intent with VLAN treatment
Case 5000: Test host mobility with host intents - PASS
- 5000.1 Testing host mobility by moving h1 from s5 to s6 - PASS
- 5000.2 IPV4: Add host intents between h1 and h9 - PASS
Case 18: Stop Mininet and Scapy - PASS
Stopping the current mininet topology to start up fresh
- 18.1 Stopping and Removing Scapy Host Components - PASS
- 18.2 Stopping Mininet - PASS
Case 19: Copy karaf logs - PASS
Copying the karaf logs to preserve them throughreinstalling ONOS
- 19.1 Copying karaf logs - PASS
Case 2: Starting up 1 node(s) ONOS cluster - PASS
Set up ONOS with 1 node(s) ONOS cluster
- 2.1 Apply cell to environment - PASS
- 2.2 Uninstalling Atomix - PASS
- 2.3 Uninstalling ONOS package - PASS
- 2.4 Creating ONOS package - PASS
- 2.5 Installing Atomix - PASS
- 2.6 Installing ONOS package - PASS
- 2.7 Set up ONOS secure SSH - PASS
- 2.8 Checking ONOS service - PASS
- 2.9 Starting ONOS CLI sessions - PASS
- 2.10 Checking ONOS nodes - PASS
- 2.11 Checking ONOS applications - PASS
Case 11: Start Mininet topology with OF 1.3 switches - PASS
Start mininet topology with OF 1.3 switches to test intents, exits out if topology did not start correctly
- 11.1 Starting Mininet topology with OF 1.3 switches - PASS
Case 12: Assign switches to controllers - PASS
Assign OF 1.3 switches to ONOS nodes
- 12.1 Assigning switches to controllers - PASS
Case 13: Create scapy components - PASS
- 13.1 Create scapy components - No Result
- 13.2 Start scapy components - PASS
Case 15: Discover all hosts using scapy - PASS
- 15.1 Send packets from each host to the first host and confirm onos discovery - PASS
- 15.2 Populate hostsData - PASS
Case 16: Balance mastership of switches - PASS
- 16.1 Balancing mastership of switches - PASS
Case 1000: Host Intents Test - 1 NODE(S) - OF 1.3 - Using Flow Rules - PASS
This test case tests Host intents using 1 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet and compile intents using Flow Rules
- 1000.1 IPV4: Add and test host intents between h1 and h9 - PASS
- 1000.2 DUALSTACK1: Add host intents between h3 and h11 - PASS
- 1000.3 DUALSTACK2: Add host intents between h1 and h11 - PASS
- 1000.4 1HOP: Add host intents between h1 and h3 - PASS
- 1000.5 VLAN1: Add vlan host intents between h4 and h12 - PASS
- 1000.6 Confirm that ONOS leadership is unchanged - PASS
Case 2000: Point Intents Test - 1 NODE(S) - OF 1.3 - Using Flow Rules - PASS
This test case will test point to point intents using 1 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet and compile intents using Flow Rules
- 2000.1 NOOPTION: Add point intents between h1 and h9 - PASS
- 2000.2 IPV4: Add point intents between h1 and h9 - PASS
- 2000.3 IPV4_2: Add point intents between h1 and h9 - PASS
- 2000.4 SDNIP-ICMP: Add point intents between h1 and h9 - PASS
- 2000.5 SDNIP-TCP: Add point intents between h1 and h9 - PASS
- 2000.6 DUALSTACK1: Add point intents between h3 and h11 - PASS
- 2000.7 VLAN: Add point intents between h5 and h21 - PASS
- 2000.8 1HOP: Add point intents between h1 and h3 - PASS
Case 3000: Single to Multi Point Intents Test - 1 NODE(S) - OF 1.3 - Using Flow Rules - FAIL
This test case will test single point to multi point intents using 1 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet and compile intents using Flow Rules
- 3000.1 NOOPTION: Install and test single point to multi point intents - FAIL
- Assertion results for IPV4 single to multi point intent with no options set
- 3000.2 IPV4: Install and test single point to multi point intents - FAIL
- Assertion results for IPV4 single to multi point intent with IPV4 type and MAC addresses
- 3000.3 IPV4_2: Add single point to multi point intents - FAIL
- Assertion results for IPV4 single to multi point intent with IPV4 type and no MAC addresses
- 3000.4 VLAN: Add single point to multi point intents - FAIL
- Assertion results for IPV4 single to multi point intent with IPV4 type and MAC addresses in the same VLAN
- 3000.5 VLAN: Add single point to multi point intents - FAIL
- Assertion results for single to multi point intent with VLAN treatment
Case 5000: Test host mobility with host intents - PASS
- 5000.1 Testing host mobility by moving h1 from s5 to s6 - PASS
- 5000.2 IPV4: Add host intents between h1 and h9 - PASS
Case 18: Stop Mininet and Scapy - PASS
Stopping the current mininet topology to start up fresh
- 18.1 Stopping and Removing Scapy Host Components - PASS
- 18.2 Stopping Mininet - PASS
Case 19: Copy karaf logs - PASS
Copying the karaf logs to preserve them throughreinstalling ONOS
- 19.1 Copying karaf logs - PASS
Case 2: Starting up 3 node(s) ONOS cluster - PASS
Set up ONOS with 3 node(s) ONOS cluster
- 2.1 Apply cell to environment - PASS
- 2.2 Uninstalling Atomix - PASS
- 2.3 Uninstalling ONOS package - PASS
- 2.4 Creating ONOS package - PASS
- 2.5 Installing Atomix - PASS
- 2.6 Installing ONOS package - PASS
- 2.7 Set up ONOS secure SSH - PASS
- 2.8 Checking ONOS service - PASS
- 2.9 Starting ONOS CLI sessions - PASS
- 2.10 Checking ONOS nodes - PASS
- 2.11 Checking ONOS applications - PASS
Case 11: Start Mininet topology with OF 1.3 switches - PASS
Start mininet topology with OF 1.3 switches to test intents, exits out if topology did not start correctly
- 11.1 Starting Mininet topology with OF 1.3 switches - PASS
Case 12: Assign switches to controllers - PASS
Assign OF 1.3 switches to ONOS nodes
- 12.1 Assigning switches to controllers - PASS
Case 13: Create scapy components - PASS
- 13.1 Create scapy components - No Result
- 13.2 Start scapy components - PASS
Case 15: Discover all hosts using scapy - PASS
- 15.1 Send packets from each host to the first host and confirm onos discovery - PASS
- 15.2 Populate hostsData - PASS
Case 16: Balance mastership of switches - PASS
- 16.1 Balancing mastership of switches - PASS
Case 1000: Host Intents Test - 3 NODE(S) - OF 1.3 - Using Flow Rules - PASS
This test case tests Host intents using 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet and compile intents using Flow Rules
- 1000.1 IPV4: Add and test host intents between h1 and h9 - PASS
- 1000.2 DUALSTACK1: Add host intents between h3 and h11 - PASS
- 1000.3 DUALSTACK2: Add host intents between h1 and h11 - PASS
- 1000.4 1HOP: Add host intents between h1 and h3 - PASS
- 1000.5 VLAN1: Add vlan host intents between h4 and h12 - PASS
- 1000.6 Confirm that ONOS leadership is unchanged - PASS
Case 2000: Point Intents Test - 3 NODE(S) - OF 1.3 - Using Flow Rules - PASS
This test case will test point to point intents using 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet and compile intents using Flow Rules
- 2000.1 NOOPTION: Add point intents between h1 and h9 - PASS
- 2000.2 IPV4: Add point intents between h1 and h9 - PASS
- 2000.3 IPV4_2: Add point intents between h1 and h9 - PASS
- 2000.4 SDNIP-ICMP: Add point intents between h1 and h9 - PASS
- 2000.5 SDNIP-TCP: Add point intents between h1 and h9 - PASS
- 2000.6 DUALSTACK1: Add point intents between h3 and h11 - PASS
- 2000.7 VLAN: Add point intents between h5 and h21 - PASS
- 2000.8 1HOP: Add point intents between h1 and h3 - PASS
Case 3000: Single to Multi Point Intents Test - 3 NODE(S) - OF 1.3 - Using Flow Rules - FAIL
This test case will test single point to multi point intents using 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet and compile intents using Flow Rules
- 3000.1 NOOPTION: Install and test single point to multi point intents - FAIL
- Assertion results for IPV4 single to multi point intent with no options set
- 3000.2 IPV4: Install and test single point to multi point intents - FAIL
- Assertion results for IPV4 single to multi point intent with IPV4 type and MAC addresses
- 3000.3 IPV4_2: Add single point to multi point intents - FAIL
- Assertion results for IPV4 single to multi point intent with IPV4 type and no MAC addresses
- 3000.4 VLAN: Add single point to multi point intents - FAIL
- Assertion results for IPV4 single to multi point intent with IPV4 type and MAC addresses in the same VLAN
- 3000.5 VLAN: Add single point to multi point intents - FAIL
- Assertion results for single to multi point intent with VLAN treatment
Case 5000: Test host mobility with host intents - PASS
- 5000.1 Testing host mobility by moving h1 from s5 to s6 - PASS
- 5000.2 IPV4: Add host intents between h1 and h9 - PASS
Case 18: Stop Mininet and Scapy - PASS
Stopping the current mininet topology to start up fresh
- 18.1 Stopping and Removing Scapy Host Components - PASS
- 18.2 Stopping Mininet - PASS
Case 19: Copy karaf logs - PASS
Copying the karaf logs to preserve them throughreinstalling ONOS
- 19.1 Copying karaf logs - PASS
Case 2: Starting up 1 node(s) ONOS cluster - PASS
Set up ONOS with 1 node(s) ONOS cluster
- 2.1 Apply cell to environment - PASS
- 2.2 Uninstalling Atomix - PASS
- 2.3 Uninstalling ONOS package - PASS
- 2.4 Creating ONOS package - PASS
- 2.5 Installing Atomix - PASS
- 2.6 Installing ONOS package - PASS
- 2.7 Set up ONOS secure SSH - PASS
- 2.8 Checking ONOS service - PASS
- 2.9 Starting ONOS CLI sessions - PASS
- 2.10 Checking ONOS nodes - PASS
- 2.11 Checking ONOS applications - PASS
Case 11: Start Mininet topology with OF 1.3 switches - PASS
Start mininet topology with OF 1.3 switches to test intents, exits out if topology did not start correctly
- 11.1 Starting Mininet topology with OF 1.3 switches - PASS
Case 12: Assign switches to controllers - PASS
Assign OF 1.3 switches to ONOS nodes
- 12.1 Assigning switches to controllers - PASS
Case 13: Create scapy components - PASS
- 13.1 Create scapy components - No Result
- 13.2 Start scapy components - PASS
Case 15: Discover all hosts using scapy - PASS
- 15.1 Send packets from each host to the first host and confirm onos discovery - PASS
- 15.2 Populate hostsData - PASS
Case 16: Balance mastership of switches - PASS
- 16.1 Balancing mastership of switches - PASS
Case 17: Enable intent compilation using Flow Objectives - PASS
- 17.1 Enabling Flow Objectives - PASS
Case 1000: Host Intents Test - 1 NODE(S) - OF 1.3 - Using Flow Objectives - PASS
This test case tests Host intents using 1 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet and compile intents using Flow Objectives
- 1000.1 IPV4: Add and test host intents between h1 and h9 - PASS
- 1000.2 DUALSTACK1: Add host intents between h3 and h11 - PASS
- 1000.3 DUALSTACK2: Add host intents between h1 and h11 - PASS
- 1000.4 1HOP: Add host intents between h1 and h3 - PASS
- 1000.5 VLAN1: Add vlan host intents between h4 and h12 - PASS
- 1000.6 Confirm that ONOS leadership is unchanged - PASS
Case 2000: Point Intents Test - 1 NODE(S) - OF 1.3 - Using Flow Objectives - PASS
This test case will test point to point intents using 1 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet and compile intents using Flow Objectives
- 2000.1 NOOPTION: Add point intents between h1 and h9 - PASS
- 2000.2 IPV4: Add point intents between h1 and h9 - PASS
- 2000.3 IPV4_2: Add point intents between h1 and h9 - PASS
- 2000.4 SDNIP-ICMP: Add point intents between h1 and h9 - PASS
- 2000.5 SDNIP-TCP: Add point intents between h1 and h9 - PASS
- 2000.6 DUALSTACK1: Add point intents between h3 and h11 - PASS
- 2000.7 VLAN: Add point intents between h5 and h21 - PASS
- 2000.8 1HOP: Add point intents between h1 and h3 - PASS
Case 3000: Single to Multi Point Intents Test - 1 NODE(S) - OF 1.3 - Using Flow Objectives - FAIL
This test case will test single point to multi point intents using 1 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet and compile intents using Flow Objectives
- 3000.1 NOOPTION: Install and test single point to multi point intents - FAIL
- Assertion results for IPV4 single to multi point intent with no options set
- 3000.2 IPV4: Install and test single point to multi point intents - FAIL
- Assertion results for IPV4 single to multi point intent with IPV4 type and MAC addresses
- 3000.3 IPV4_2: Add single point to multi point intents - FAIL
- Assertion results for IPV4 single to multi point intent with IPV4 type and no MAC addresses
- 3000.4 VLAN: Add single point to multi point intents - FAIL
- Assertion results for IPV4 single to multi point intent with IPV4 type and MAC addresses in the same VLAN
- 3000.5 VLAN: Add single point to multi point intents - FAIL
- Assertion results for single to multi point intent with VLAN treatment
Case 5000: Test host mobility with host intents - PASS
- 5000.1 Testing host mobility by moving h1 from s5 to s6 - PASS
- 5000.2 IPV4: Add host intents between h1 and h9 - PASS
Case 18: Stop Mininet and Scapy - PASS
Stopping the current mininet topology to start up fresh
- 18.1 Stopping and Removing Scapy Host Components - PASS
- 18.2 Stopping Mininet - PASS
Case 19: Copy karaf logs - PASS
Copying the karaf logs to preserve them throughreinstalling ONOS
- 19.1 Copying karaf logs - PASS
Case 2: Starting up 3 node(s) ONOS cluster - PASS
Set up ONOS with 3 node(s) ONOS cluster
- 2.1 Apply cell to environment - PASS
- 2.2 Uninstalling Atomix - PASS
- 2.3 Uninstalling ONOS package - PASS
- 2.4 Creating ONOS package - PASS
- 2.5 Installing Atomix - PASS
- 2.6 Installing ONOS package - PASS
- 2.7 Set up ONOS secure SSH - PASS
- 2.8 Checking ONOS service - PASS
- 2.9 Starting ONOS CLI sessions - PASS
- 2.10 Checking ONOS nodes - PASS
- 2.11 Checking ONOS applications - PASS
Case 11: Start Mininet topology with OF 1.3 switches - PASS
Start mininet topology with OF 1.3 switches to test intents, exits out if topology did not start correctly
- 11.1 Starting Mininet topology with OF 1.3 switches - PASS
Case 12: Assign switches to controllers - PASS
Assign OF 1.3 switches to ONOS nodes
- 12.1 Assigning switches to controllers - PASS
Case 13: Create scapy components - PASS
- 13.1 Create scapy components - No Result
- 13.2 Start scapy components - PASS
Case 15: Discover all hosts using scapy - PASS
- 15.1 Send packets from each host to the first host and confirm onos discovery - PASS
- 15.2 Populate hostsData - PASS
Case 16: Balance mastership of switches - PASS
- 16.1 Balancing mastership of switches - PASS
Case 17: Enable intent compilation using Flow Objectives - PASS
- 17.1 Enabling Flow Objectives - PASS
Case 1000: Host Intents Test - 3 NODE(S) - OF 1.3 - Using Flow Objectives - PASS
This test case tests Host intents using 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet and compile intents using Flow Objectives
- 1000.1 IPV4: Add and test host intents between h1 and h9 - PASS
- 1000.2 DUALSTACK1: Add host intents between h3 and h11 - PASS
- 1000.3 DUALSTACK2: Add host intents between h1 and h11 - PASS
- 1000.4 1HOP: Add host intents between h1 and h3 - PASS
- 1000.5 VLAN1: Add vlan host intents between h4 and h12 - PASS
- 1000.6 Confirm that ONOS leadership is unchanged - PASS
Case 2000: Point Intents Test - 3 NODE(S) - OF 1.3 - Using Flow Objectives - PASS
This test case tests Host will test point to point intents using 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet and compile intents using Flow Objectives
- 2000 1000.1 IPV4NOOPTION: Add and test host point intents between h1 and h9 - PASS
- 1000 2000.2 DUALSTACK1IPV4: Add host point intents between h3 h1 and h11 h9 - PASS 1000
- 2000.3 DUALSTACK2IPV4_2: Add host point intents between h1 and h11 h9 - PASS 1000.4
- 2000.4 SDNIP-ICMP: Add point intents between h1 and h9 - PASS
- 2000.5 SDNIP-TCP: Add point intents between h1 and h9 - PASS
- 2000.6 DUALSTACK1: Add point intents between h3 and h11 1HOP: Add host intents between h1 and h3 - PASS
- 1000 2000.5 VLAN17 VLAN: Add vlan host point intents between h4 h5 and h12 h21 - PASS 1000
- 2000.6 VLAN28 1HOP: Add inter vlan host point intents between h13 h1 and h20 h3 - PASS
- 1000.7 Confirm that ONOS leadership is unchanged - PASS
...
Case 3000: Single to Multi Point Intents Test - 3 NODE(S) - OF 1.3 -
...
Using Flow Objectives - FAIL
This test case will test single point to multi point intents using 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet and compile intents using Flow Objectives
- 3000 2000.1 NOOPTION: Add Install and test single point to multi point intents between h1 and h9 - PASS
- 2000.2 IPV4: Add point intents between h1 and h9 - PASS
- 2000.3 IPV4_2: Add point intents between h1 and h9 - PASS
- 2000.4 SDNIP-ICMP: Add point intents between h1 and h9 - PASS
- 2000.5 SDNIP-TCP: Add point intents between h1 and h9 - PASS
- 2000.6 DUALSTACK1: Add point intents between h3 and h11 - PASS
- 2000.7 VLAN: Add point intents between h5 and h21 - PASS
- - FAIL
- Assertion results for IPV4 single to multi point intent with no options set
- 3000.2 IPV4: Install and test single point to multi point intents - FAIL
- Assertion results for IPV4 single to multi point intent with IPV4 type and MAC addresses
- 3000.3 IPV4_2: Add single point to multi point intents - FAIL
- Assertion results for IPV4 single to multi point intent with IPV4 type and no MAC addresses
- 3000.4 VLAN: Add single point to multi point intents - FAIL
- Assertion results for IPV4 single to multi point intent with IPV4 type and MAC addresses in the same VLAN
- 3000.5 VLAN: Add single point to multi point intents - FAIL
- Assertion results for single to multi point intent with VLAN treatment
Case 5000: Test host mobility with host intents - PASS
- 5000.1 Testing host mobility by moving h1 from s5 to s6 - PASS
- 5000.2 IPV4: Add host intents between h1 and h9 - PASS
Case
...
18: Stop Mininet and Scapy - PASS
Stopping the current mininet topology to start up fresh
- 17 18.1 Stopping and Removing Scapy Host Components - PASS
- 17 18.2 Stopping Mininet Topology - PASS
Case 19: Copy karaf logs - PASS
Copying the karaf logs to preserve them throughreinstalling ONOS
- 19.1 Copying karaf logs - PASS