<img src="https://jenkins.onosproject.org/view/QA/job/postjob-VM/lastSuccessfulBuild/artifact/FUNCintentRest_master_20-builds_graph.jpg", alt="FUNCintentRest", style="width:525px;height:350px;border:0">

commit b53d626fb03195129c0ec0802e1f953f85dcbef8 commit a84637c702a45e8e70f05f0437217f15930a7135 (HEAD, origin/master, origin/HEAD, master)
Author: Brian O'Connor [bocon@onlab.uspierventre [pier@opennetworking.org]
AuthorDate: Tue May 10 19:16:18 2016 -0700
Commit: Brian O'Connor [bocon@onlab.us]
CommitDate: Tue May 10 19:16:53 2016 -0700
Updating bin/karaf to fix ^D

Case 1: Constructing test variables and building ONOS package - PASS

Wed Sep 22 11:24:38 2021 +0200
Commit: Pier Luigi Ventre [pier@opennetworking.org]
CommitDate: Thu Sep 23 07:38:36 2021 +0000

[SDFAB-612] Cluster not ready when using recent tost master images
--
(cherry picked from commit ec0e942320ef27932b4173172055151015261d7c)

Case 1: Pull onos branch and build onos on Teststation. - PASS

For This test case is mainly for loading from params file, and pull and build the latest ONOS package

...

Set up ONOS with 1 node(s) ONOS cluster

  • 2.1 Uninstalling ONOS package Apply cell to environment - PASS (tick)
  • 2.2 Apply cell to environment Uninstalling Atomix - PASS (tick)
  • 2.3 Creating Uninstalling ONOS package - PASS (tick)
  • 2.4 Installing Creating ONOS package - PASS (tick)
  • 2.5 Starting ONOS service Installing Atomix - PASS (tick)
  • 2.6 Installing ONOS package - PASS (tick)
  • 2.6 Start ONOS cli 7 Set up ONOS secure SSH - PASS (tick)

Case 10: Start Mininet topology with OF 1.0 switches - PASS

  • 2.8 Checking ONOS service - PASS (tick)
  • 2.9 Starting ONOS CLI sessions - PASS (tick)
  • 2.10 Checking ONOS nodes - PASS (tick)
  • 2.11 Checking ONOS applications - PASS (tick)

Case 10: Start Mininet topology with OF 1.0 switches - PASS

Start mininet topology with OF 1.0 switches to test intents, exits out if Start mininet topology with OF 1.0 switches to test intents, exits out if topology did not start correctly

...

  • 1000.1 IPV4: Add and test host intents between h1 and h9 - PASS (tick)
  • 1000.2 DUALSTACK1: Add host intents between h3 and h11 - PASS (tick)
  • 1000.3 DUALSTACK2: Add host intents between h1 and h11 - PASS (tick)
  • 1000.4 1HOP: Add host intents between h1 and h3 - PASS (tick)
  • 1000.5 VLAN1: Add vlan host intents between h4 and h12 - PASS (tick)
  • 1000.6 VLAN2: Add inter vlan host intents between h13 and h20 - PASS (tick) 1000.7 Confirm that ONOS leadership is unchanged - PASS (tick)

...

  • 2000.1 NOOPTION: Add point intents between h1 and h9 - PASS (tick)
  • 2000.2 IPV4: Add point intents between h1 and h9 - PASS (tick)
  • 2000.3 IPV4_2: Add point intents between h1 and h9 - PASS (tick)
  • 2000.4 SDNIP-ICMP: Add point intents between h1 and h9 - PASS (tick)
  • 2000.5 SDNIP-TCP: Add point intents between h1 and h9 - PASS (tick)
  • 2000.6 DUALSTACK1: Add point intents between h3 and h11 - PASS (tick)
  • 2000.7 VLAN: Add point intents between h5 and h21 - PASS (tick)
  • 2000.8 1HOP: Add point intents between h1 and h3 - PASS (tick)

Case

...

3000:

...

Single to Multi Point Intents Test - 1 NODE(S) - OF 1.0 - Using Flow Rules - FAIL

This test case will test single point to multi point intents using 1 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.0 OVS running in Mininet and compile intents using Flow Rules

  • 3000.1 NOOPTION: Install and test single point to multi point intents - FAIL (error)
    • Assertion results for IPV4 single to multi point intent with no options set
  • 3000.2 IPV4: Install and test single point to multi point intents - FAIL (error)
    • Assertion results for IPV4 single to multi point intent with IPV4 type and MAC addresses
  • 3000.3 IPV4_2: Add single point to multi point intents - FAIL (error)
    • Assertion results for IPV4 single to multi point intent with IPV4 type and no MAC addresses
  • 3000.4 VLAN: Add single point to multi point intents - FAIL (error)
    • Assertion results for IPV4 single to multi point intent with IPV4 type and MAC addresses in the same VLAN
  • 3000.5 VLAN: Add single point to multi point intents - FAIL (error)
    • Assertion results for single to multi point intent with VLAN treatment

Case 5000: Test host mobility with host intents - PASS

  • 5000.1 Testing host mobility by moving h1 from s5 to s6 - PASS (tick)
  • 5000.2 IPV4: Add host intents between h1 and h9 - PASS (tick)

Case 18: Stop Mininet and Scapy - PASS

Stopping the current mininet topology to start up fresh

  • 18.1 Stopping and Removing Scapy Host Components - PASS (tick)
  • 18.2 Stopping Mininet - PASS (tick)

Case 19: Copy karaf logs - PASS

Copying the karaf logs to preserve them throughreinstalling ONOS

  • 19.1 Copying karaf logs - PASS (tick)

Case 2: Starting up 3 node(s) ONOS cluster - PASS

Set up ONOS with 3 node(s) ONOS cluster

  • 2.1 Apply cell to environment - PASS (tick)
  • 2.2 Uninstalling Atomix - PASS (tick)
  • 2.3 Uninstalling ONOS package - PASS (tick)
  • 2.4 Creating ONOS package - PASS (tick)
  • 2.5 Installing Atomix - PASS (tick)
  • 2.6 Installing ONOS package - PASS (tick)
  • 2.7 Set up ONOS secure SSH - PASS (tick)
  • 2.8 Checking ONOS service - PASS (tick)
  • 2.9 Starting ONOS CLI sessions - PASS (tick)
  • 2.10 Checking ONOS nodes - PASS (tick)
  • 2.11 Checking ONOS applications - PASS (tick)

Case 10: Start Mininet topology with OF 1.0 switches - PASS

Start mininet topology with OF 1.0 switches to test intents, exits out if topology did not start correctly

  • 10.1 Starting Mininet topology with OF 1.0 switches - PASS (tick)

Case 12: Assign switches to controllers - PASS

Assign OF 1.0 switches to ONOS nodes

  • 12.1 Assigning switches to controllers - PASS (tick)

Case 13: Create scapy components - PASS

  • 13.1 Create scapy components - No Result (warning)
  • 13.2 Start scapy components - PASS (tick)

Case 15: Discover all hosts using scapy - PASS

  • 15.1 Send packets from each host to the first host and confirm onos discovery - PASS (tick)
  • 15.2 Populate hostsData - PASS (tick)

Case 16: Balance mastership of switches - PASS

  • 16.1 Balancing mastership of switches - PASS (tick)

Case 1000: Host Intents Test - 3 NODE(S) - OF 1.0 - Using Flow Rules - PASS

This test case tests Host intents using 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.0 OVS running in Mininet and compile intents using Flow Rules

  • 1000.1 IPV4: Add and test host intents between h1 and h9 - PASS (tick)
  • 1000.2 DUALSTACK1: Add host intents between h3 and h11 - PASS (tick)
  • 1000.3 DUALSTACK2: Add host intents between h1 and h11 - PASS (tick)
  • 1000.4 1HOP: Add host intents between h1 and h3 - PASS (tick)
  • 1000.5 VLAN1: Add vlan host intents between h4 and h12 - PASS (tick)
  • 1000.6 Confirm that ONOS leadership is unchanged - PASS (tick)

Case 2000: Point Intents Test - 3 NODE(S) - OF 1.0 - Using Flow Rules - PASS

This test case will test point to point intents using 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.0 OVS running in Mininet and compile intents using Flow Rules

  • 2000.1 NOOPTION: Add point intents between h1 and h9 - PASS (tick)
  • 2000.2 IPV4: Add point intents between h1 and h9 - PASS (tick)
  • 2000.3 IPV4_2: Add point intents between h1 and h9 - PASS (tick)
  • 2000.4 SDNIP-ICMP: Add point intents between h1 and h9 - PASS (tick)
  • 2000.5 SDNIP-TCP: Add point intents between h1 and h9 - PASS (tick)
  • 2000.6 DUALSTACK1: Add point intents between h3 and h11 - PASS (tick)
  • 2000.7 VLAN: Add point intents between h5 and h21 - PASS (tick)
  • 2000.8 1HOP: Add point intents between h1 and h3 - PASS (tick)

Case 3000: Single to Multi Point Intents Test - 3

  • 5000.1 Testing host mobility by moving h1 from s5 to s6 - PASS (tick)
  • 5000.2 IPV4: Add host intents between h1 and h9 - PASS (tick)

Case 18: Stop Mininet and Scapy - PASS

Stopping the current mininet topology to start up fresh

  • 18.1 Stopping and Removing Scapy Host Components - PASS (tick)
  • 18.2 Stopping Mininet Topology - PASS (tick)

Case 2: Starting up 3 node(s) ONOS cluster - PASS

Set up ONOS with 3 node(s) ONOS cluster

  • 2.1 Uninstalling ONOS package - PASS (tick)
  • 2.2 Apply cell to environment - PASS (tick)
  • 2.3 Creating ONOS package - PASS (tick)
  • 2.4 Installing ONOS package - PASS (tick)
  • 2.5 Starting ONOS service - PASS (tick)
  • 2.6 Start ONOS cli - PASS (tick)

Case 10: Start Mininet topology with OF 1.0 switches - PASS

Start mininet topology with OF 1.0 switches to test intents, exits out if topology did not start correctly

  • 10.1 Starting Mininet topology with OF 1.0 switches - PASS (tick)

Case 12: Assign switches to controllers - PASS

Assign OF 1.0 switches to ONOS nodes

  • 12.1 Assigning switches to controllers - PASS (tick)

Case 13: Create scapy components - PASS

  • 13.1 Create scapy components - No Result (warning)
  • 13.2 Start scapy components - PASS (tick)

Case 15: Discover all hosts using scapy - PASS

  • 15.1 Send packets from each host to the first host and confirm onos discovery - PASS (tick)
  • 15.2 Populate hostsData - PASS (tick)

Case 16: Balance mastership of switches - PASS

  • 16.1 Balancing mastership of switches - PASS (tick)

Case 1000: Host Intents Test - 3 NODE(S) - OF 1.0 - Using Flow Rules - PASS

This test case tests Host intents using 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.0 OVS running in Mininet and compile intents using Flow Rules

  • 1000.1 IPV4: Add and test host intents between h1 and h9 - PASS (tick)
  • 1000.2 DUALSTACK1: Add host intents between h3 and h11 - PASS (tick)
  • 1000.3 DUALSTACK2: Add host intents between h1 and h11 - PASS (tick)
  • 1000.4 1HOP: Add host intents between h1 and h3 - PASS (tick)
  • 1000.5 VLAN1: Add vlan host intents between h4 and h12 - PASS (tick)
  • 1000.6 VLAN2: Add inter vlan host intents between h13 and h20 - PASS (tick)
  • 1000.7 Confirm that ONOS leadership is unchanged - PASS (tick)

Case 2000: Point Intents Test - 3 NODE(S) - OF 1.0 - Using Flow Rules - PASS

This test case will test point to point intents using 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.0 OVS running in Mininet and compile intents using Flow Rules

  • 2000.1 NOOPTION: Add point intents between h1 and h9 - PASS (tick)
  • 2000.2 IPV4: Add point intents between h1 and h9 - PASS (tick)
  • 2000.3 IPV4_2: Add point intents between h1 and h9 - PASS (tick)
  • 2000.4 SDNIP-ICMP: Add point intents between h1 and h9 - PASS (tick)
  • 2000.5 SDNIP-TCP: Add point intents between h1 and h9 - PASS (tick)
  • 2000.6 DUALSTACK1: Add point intents between h3 and h11 - PASS (tick)
  • 2000.7 VLAN: Add point intents between h5 and h21 - PASS (tick)
  • 2000.8 1HOP: Add point intents between h1 and h3 - PASS (tick)

Case 5000: Test host mobility with host intents - PASS

  • 5000.1 Testing host mobility by moving h1 from s5 to s6 - PASS (tick)
  • 5000.2 IPV4: Add host intents between h1 and h9 - PASS (tick)

Case 18: Stop Mininet and Scapy - PASS

Stopping the current mininet topology to start up fresh

  • 18.1 Stopping and Removing Scapy Host Components - PASS (tick)
  • 18.2 Stopping Mininet Topology - PASS (tick)

Case 2: Starting up 1 node(s) ONOS cluster - PASS

Set up ONOS with 1 node(s) ONOS cluster

  • 2.1 Uninstalling ONOS package - PASS (tick)
  • 2.2 Apply cell to environment - PASS (tick)
  • 2.3 Creating ONOS package - PASS (tick)
  • 2.4 Installing ONOS package - PASS (tick)
  • 2.5 Starting ONOS service - PASS (tick)
  • 2.6 Start ONOS cli - PASS (tick)

Case 10: Start Mininet topology with OF 1.0 switches - PASS

Start mininet topology with OF 1.0 switches to test intents, exits out if topology did not start correctly

  • 10.1 Starting Mininet topology with OF 1.0 switches - PASS (tick)

Case 12: Assign switches to controllers - PASS

Assign OF 1.0 switches to ONOS nodes

  • 12.1 Assigning switches to controllers - PASS (tick)

Case 13: Create scapy components - PASS

  • 13.1 Create scapy components - No Result (warning)
  • 13.2 Start scapy components - PASS (tick)

Case 15: Discover all hosts using scapy - PASS

  • 15.1 Send packets from each host to the first host and confirm onos discovery - PASS (tick)
  • 15.2 Populate hostsData - PASS (tick)

Case 16: Balance mastership of switches - PASS

  • 16.1 Balancing mastership of switches - PASS (tick)

Case 17: Enable intent compilation using Flow Objectives - PASS

  • 17.1 Enabling Flow Objectives - PASS (tick)

...

NODE(S) - OF 1.0 - Using Flow

...

Rules -

...

FAIL

This test case tests Host will test single point to multi point intents using 1 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.0 OVS running in Mininet and compile intents using Flow ObjectivesRules

  • 1000 3000.1 IPV4NOOPTION: Add Install and test host intents between h1 and h9 - PASS (tick)
  • 1000.2 DUALSTACK1: Add host intents between h3 and h11 - PASS (tick)
  • 1000.3 DUALSTACK2: Add host intents between h1 and h11 - PASS (tick)
  • 1000.4 1HOP: Add host intents between h1 and h3 - PASS (tick)
  • 1000.5 VLAN1: Add vlan host intents between h4 and h12 - PASS (tick)
  • 1000.6 VLAN2: Add inter vlan host intents between h13 and h20 - PASS (tick)
  • 1000.7 Confirm that ONOS leadership is unchanged - PASS (tick)

Case 2000: Point Intents Test - 1 NODE(S) - OF 1.0 - Using Flow Objectives - FAIL

This test case will test point to point intents using 1 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.0 OVS running in Mininet and compile intents using Flow Objectives

  • 2000.1 NOOPTION: Add point intents between h1 and h9 - PASS (tick)
  • 2000.2 IPV4: Add point intents between h1 and h9 - PASS (tick)
  • 2000.3 IPV4_2: Add point intents between h1 and h9 - PASS (tick)
  • 2000.4 SDNIP-ICMP: Add point intents between h1 and h9 - PASS (tick)
  • 2000.5 SDNIP-TCP: Add point intents between h1 and h9 - PASS (tick)
  • 2000.6 DUALSTACK1: Add point intents between h3 and h11 - FAIL (error)
    • Assertion Result for Dualstack1 IPV4 with mac address point intents
    • Initial Intent State Passed
    • Initial Flow State Passed
    • Initial Ping Failed
    • Link Down Passed
    • Link Down Intent State Passed
    • Link Down Flow State Passed
    • Link Down Topology State Passed
    • Link Down Pingall Passed
    • Link Up Passed
    • Link Up Intent State Passed
    • Link Up Flow State Passed
    • Link Up Topology State Passed
    • Link Up Scapy Packet Received Passed
    • Remove Intents Passed
  • 2000.7 VLAN: Add point intents between h5 and h21 - PASS (tick)
  • 2000.8 1HOP: Add point intents between h1 and h3 - PASS (tick)

Case 5000: Test host mobility with host intents - PASS

  • 5000.1 Testing host mobility by moving h1 from s5 to s6 - PASS (tick)
  • 5000.2 IPV4: Add host intents between h1 and h9 - PASS (tick)

Case 18: Stop Mininet and Scapy - PASS

Stopping the current mininet topology to start up fresh

  • 18.1 Stopping and Removing Scapy Host Components - PASS (tick)
  • 18.2 Stopping Mininet Topology - PASS (tick)

Case 2: Starting up 3 node(s) ONOS cluster - PASS

Set up ONOS with 3 node(s) ONOS cluster

  • 2.1 Uninstalling ONOS package - PASS (tick)
  • 2.2 Apply cell to environment - PASS (tick)
  • 2.3 Creating ONOS package - PASS (tick)
  • 2.4 Installing ONOS package - PASS (tick)
  • 2.5 Starting ONOS service - PASS (tick)
  • 2.6 Start ONOS cli - PASS (tick)

Case 10: Start Mininet topology with OF 1.0 switches - PASS

Start mininet topology with OF 1.0 switches to test intents, exits out if topology did not start correctly

  • 10.1 Starting Mininet topology with OF 1.0 switches - PASS (tick)

Case 12: Assign switches to controllers - PASS

Assign OF 1.0 switches to ONOS nodes

  • 12.1 Assigning switches to controllers - PASS (tick)

Case 13: Create scapy components - PASS

  • 13.1 Create scapy components - No Result (warning)
  • 13.2 Start scapy components - PASS (tick)

Case 15: Discover all hosts using scapy - PASS

  • 15.1 Send packets from each host to the first host and confirm onos discovery - PASS (tick)
  • 15.2 Populate hostsData - PASS (tick)

Case 16: Balance mastership of switches - PASS

  • 16.1 Balancing mastership of switches - PASS (tick)

Case 17: Enable intent compilation using Flow Objectives - PASS

  • 17.1 Enabling Flow Objectives - PASS (tick)

Case 1000: Host Intents Test - 3 NODE(S) - OF 1.0 - Using Flow Objectives - PASS

  • single point to multi point intents - FAIL (error)
    • Assertion results for IPV4 single to multi point intent with no options set
  • 3000.2 IPV4: Install and test single point to multi point intents - FAIL (error)
    • Assertion results for IPV4 single to multi point intent with IPV4 type and MAC addresses
  • 3000.3 IPV4_2: Add single point to multi point intents - FAIL (error)
    • Assertion results for IPV4 single to multi point intent with IPV4 type and no MAC addresses
  • 3000.4 VLAN: Add single point to multi point intents - FAIL (error)
    • Assertion results for IPV4 single to multi point intent with IPV4 type and MAC addresses in the same VLAN
  • 3000.5 VLAN: Add single point to multi point intents - FAIL (error)
    • Assertion results for single to multi point intent with VLAN treatment

Case 5000: Test host mobility with host intents - PASS

  • 5000.1 Testing host mobility by moving h1 from s5 to s6 - PASS (tick)
  • 5000.2 IPV4: Add host intents between h1 and h9 - PASS (tick)

Case 18: Stop Mininet and Scapy - PASS

Stopping the current mininet topology to start up fresh

  • 18.1 Stopping and Removing Scapy Host Components - PASS (tick)
  • 18.2 Stopping Mininet - PASS (tick)

Case 19: Copy karaf logs - PASS

Copying the karaf logs to preserve them throughreinstalling ONOS

  • 19.1 Copying karaf logs - PASS (tick)

Case 2: Starting up 1 node(s) ONOS cluster - PASS

Set up ONOS with 1 node(s) ONOS cluster

  • 2.1 Apply cell to environment - PASS (tick)
  • 2.2 Uninstalling Atomix - PASS (tick)
  • 2.3 Uninstalling ONOS package - PASS (tick)
  • 2.4 Creating ONOS package - PASS (tick)
  • 2.5 Installing Atomix - PASS (tick)
  • 2.6 Installing ONOS package - PASS (tick)
  • 2.7 Set up ONOS secure SSH - PASS (tick)
  • 2.8 Checking ONOS service - PASS (tick)
  • 2.9 Starting ONOS CLI sessions - PASS (tick)
  • 2.10 Checking ONOS nodes - PASS (tick)
  • 2.11 Checking ONOS applications - PASS (tick)

Case 10: Start Mininet topology with OF 1.0 switches - PASS

Start mininet topology with OF 1.0 switches to test intents, exits out if topology did not start correctly

  • 10.1 Starting Mininet topology with OF 1.0 switches - PASS (tick)

Case 12: Assign switches to controllers - PASS

Assign OF 1.0 switches to ONOS nodes

  • 12.1 Assigning switches to controllers - PASS (tick)

Case 13: Create scapy components - PASS

  • 13.1 Create scapy components - No Result (warning)
  • 13.2 Start scapy components - PASS (tick)

Case 15: Discover all hosts using scapy - PASS

  • 15.1 Send packets from each host to the first host and confirm onos discovery - PASS (tick)
  • 15.2 Populate hostsData - PASS (tick)

Case 16: Balance mastership of switches - PASS

  • 16.1 Balancing mastership of switches - PASS (tick)

Case 17: Enable intent compilation using Flow Objectives - PASS

  • 17.1 Enabling Flow Objectives - PASS (tick)

Case 1000: Host Intents Test - 1 NODE(S) - OF 1.0 - Using Flow Objectives - PASS

This test case tests Host intents using 1 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.0 OVS running in Mininet and compile intents using Flow Objectives

  • 1000.1 IPV4: Add and test host intents between h1 and h9 - PASS (tick)
  • 1000.2 DUALSTACK1: Add host intents between h3 and h11 - PASS (tick)
  • 1000.3 DUALSTACK2: Add host intents between h1 and h11 - PASS (tick)
  • 1000.4 1HOP: Add host intents between h1 and h3 - PASS (tick)
  • 1000.5 VLAN1: Add vlan host intents between h4 and h12 - PASS (tick)
  • 1000.6 Confirm that ONOS leadership is unchanged - PASS (tick)

Case 2000: Point Intents Test - 1 NODE(S) - OF 1.0 - Using Flow Objectives - PASS

This test case will test point to point intents using 1 This test case tests Host intents using 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.0 OVS running in Mininet and compile intents using Flow Objectives

  • 1000 2000.1 IPV4NOOPTION: Add and test host point intents between h1 and h9 - PASS (tick)
  • 1000 2000.2 DUALSTACK1IPV4: Add host point intents between h3 h1 and h11 h9 - PASS (tick) 1000
  • 2000.3 DUALSTACK2IPV4_2: Add host point intents between h1 and h11 h9 - PASS (tick)
  • 1000 2000.4 1HOPSDNIP-ICMP: Add host point intents between h1 and h3 h9 - PASS (tick)
  • 1000 2000.5 VLAN1SDNIP-TCP: Add vlan host point intents between h4 h1 and h12 h9 - PASS (tick)
  • 1000 2000.6 VLAN2DUALSTACK1: Add inter vlan host point intents between h13 h3 and h20 h11 - PASS (tick) 1000.7
  • 2000.7 VLAN: Add point intents between h5 and h21 - PASS (tick)
  • 2000.8 1HOP: Add point intents between h1 and h3 Confirm that ONOS leadership is unchanged - PASS (tick)

Case

...

3000: Single to Multi Point Intents Test -

...

1 NODE(S) - OF 1.0 - Using Flow Objectives - FAIL

This test case will test single point to multi point intents using 3 1 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.0 OVS running in Mininet and compile intents using Flow Objectives

  • 2000 3000.1 NOOPTION: Add point intents between h1 and h9 - PASS (tick)Install and test single point to multi point intents - FAIL (error)
    • Assertion results for IPV4 single to multi point intent with no options set
  • 3000 2000.2 IPV4: Add Install and test single point to multi point intents between h1 and h9 - FAIL (error)
    • Assertion Result results for IPV4 single to multi point intent
    • Initial Intent State Passed
    • Initial Flow State Passed
    • Initial Ping Passed
    • Link Down Passed
    • Link Down Intent State Passed
    • Link Down Flow State Passed
    • Link Down Topology State Failed
    • Link Down Pingall Passed
    • Link Up Passed
    • Link Up Intent State Passed
    • Link Up Flow State Passed
    • Link Up Topology State Passed
    • Link Up Scapy Packet Received Passed
    • Remove Intents Passed
  • 2000.3 IPV4_2: Add point intents between h1 and h9 - PASS (tick)
  • 2000.4 SDNIP-ICMP: Add point intents between h1 and h9 - PASS (tick)
    • with IPV4 type and MAC addresses
  • 3000.3 IPV4_2: Add single point to multi point intents - FAIL (error)
    • Assertion results for IPV4 single to multi point intent with IPV4 type and no MAC addresses
  • 3000.4 VLAN: Add single point to multi point intents - FAIL (error)
    • Assertion results for IPV4 single to multi point intent with IPV4 type and MAC addresses in the same VLAN
  • 3000.5 VLAN: Add single point to multi point intents - FAIL (error)
    • Assertion results for single to multi point intent with VLAN treatment

Case 5000: Test host mobility with host intents - PASS

  • 5000.1 Testing host mobility by moving h1 from s5 to s6 - PASS (tick)
  • 5000.2 IPV4: Add host 2000.5 SDNIP-TCP: Add point intents between h1 and h9 - PASS (tick)
  • 2000.6 DUALSTACK1: Add point intents between h3 and h11 - FAIL (error)
    • Assertion Result for Dualstack1 IPV4 with mac address point intents
    • Initial Intent State Passed
    • Initial Flow State Passed
    • Initial Ping Failed
    • Link Down Passed
    • Link Down Intent State Passed
    • Link Down Flow State Passed
    • Link Down Topology State Passed
    • Link Down Pingall Passed
    • Link Up Passed
    • Link Up Intent State Passed
    • Link Up Flow State Passed
    • Link Up Topology State Passed
    • Link Up Scapy Packet Received Passed
    • Remove Intents Passed
  • 2000.7 VLAN: Add point intents between h5 and h21 - PASS (tick)
  • 2000.8 1HOP: Add point intents between h1 and h3 - PASS (tick)

Case 5000: Test host mobility with host intents - FAIL

  • 5000.1 Testing host mobility by moving h1 from s5 to s6 - PASS (tick)
  • 5000.2 IPV4: Add host intents between h1 and h9 - FAIL (error)
    • Assert result for IPV4 host intent between h1, moved, and h9
    • Initial Intent State Passed
    • Initial Flow State Passed
    • Initial Ping Passed
    • Link Down Passed
    • Link Down Intent State Passed
    • Link Down Flow State Passed
    • Link Down Topology State Failed
    • Link Down Pingall Passed
    • Link Up Passed
    • Link Up Intent State Passed
    • Link Up Flow State Passed
    • Link Up Topology State Passed
    • Link Up Pingall Passed
    • Remove Intents Passed

Case 18: Stop Mininet and Scapy - PASS

Stopping the current mininet topology to start up fresh

  • 18.1 Stopping and Removing Scapy Host Components - PASS (tick)
  • 18.2 Stopping Mininet Topology - PASS (tick)

Case 2: Starting up 1 node(s) ONOS cluster - PASS

Set up ONOS with 1 node(s) ONOS cluster

  • 2.1 Uninstalling ONOS package - PASS (tick)
  • 2.2 Apply cell to environment - PASS (tick)
  • 2.3 Creating ONOS package - PASS (tick)
  • 2.4 Installing ONOS package - PASS (tick)
  • 2.5 Starting ONOS service - PASS (tick)
  • 2.6 Start ONOS cli - PASS (tick)

Case 11: Start Mininet topology with OF 1.3 switches - PASS

Start mininet topology with OF 1.3 switches to test intents, exits out if topology did not start correctly

  • 11.1 Starting Mininet topology with OF 1.3 switches - PASS (tick)

Case 12: Assign switches to controllers - PASS

Assign OF 1.3 switches to ONOS nodes

  • 12.1 Assigning switches to controllers - PASS (tick)

Case 13: Create scapy components - PASS

  • 13.1 Create scapy components - No Result (warning)
  • 13.2 Start scapy components - PASS (tick)

Case 15: Discover all hosts using scapy - PASS

  • 15.1 Send packets from each host to the first host and confirm onos discovery - PASS (tick)
  • 15.2 Populate hostsData - PASS (tick)

Case 16: Balance mastership of switches - PASS

  • 16.1 Balancing mastership of switches - PASS (tick)

Case 1000: Host Intents Test - 1 NODE(S) - OF 1.3 - Using Flow Rules - PASS

Case 18: Stop Mininet and Scapy - PASS

Stopping the current mininet topology to start up fresh

  • 18.1 Stopping and Removing Scapy Host Components - PASS (tick)
  • 18.2 Stopping Mininet - PASS (tick)

Case 19: Copy karaf logs - PASS

Copying the karaf logs to preserve them throughreinstalling ONOS

  • 19.1 Copying karaf logs - PASS (tick)

Case 2: Starting up 3 node(s) ONOS cluster - PASS

Set up ONOS with 3 node(s) ONOS cluster

  • 2.1 Apply cell to environment - PASS (tick)
  • 2.2 Uninstalling Atomix - PASS (tick)
  • 2.3 Uninstalling ONOS package - PASS (tick)
  • 2.4 Creating ONOS package - PASS (tick)
  • 2.5 Installing Atomix - PASS (tick)
  • 2.6 Installing ONOS package - PASS (tick)
  • 2.7 Set up ONOS secure SSH - PASS (tick)
  • 2.8 Checking ONOS service - PASS (tick)
  • 2.9 Starting ONOS CLI sessions - PASS (tick)
  • 2.10 Checking ONOS nodes - PASS (tick)
  • 2.11 Checking ONOS applications - PASS (tick)

Case 10: Start Mininet topology with OF 1.0 switches - PASS

Start mininet topology with OF 1.0 switches to test intents, exits out if topology did not start correctly

  • 10.1 Starting Mininet topology with OF 1.0 switches - PASS (tick)

Case 12: Assign switches to controllers - PASS

Assign OF 1.0 switches to ONOS nodes

  • 12.1 Assigning switches to controllers - PASS (tick)

Case 13: Create scapy components - PASS

  • 13.1 Create scapy components - No Result (warning)
  • 13.2 Start scapy components - PASS (tick)

Case 15: Discover all hosts using scapy - PASS

  • 15.1 Send packets from each host to the first host and confirm onos discovery - PASS (tick)
  • 15.2 Populate hostsData - PASS (tick)

Case 16: Balance mastership of switches - PASS

  • 16.1 Balancing mastership of switches - PASS (tick)

Case 17: Enable intent compilation using Flow Objectives - PASS

  • 17.1 Enabling Flow Objectives - PASS (tick)

Case 1000: Host Intents Test - 3 NODE(S) - OF 1.0 - Using Flow Objectives - PASS

This test case tests Host intents using 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.0 OVS running in Mininet and compile intents using Flow Objectives

  • 1000.1 IPV4: Add and test host intents between h1 and h9 - PASS (tick)
  • 1000.2 DUALSTACK1: Add host intents between h3 and h11 - PASS (tick)
  • 1000.3 DUALSTACK2: Add host intents between h1 and h11 - PASS (tick)
  • 1000.4 1HOP: Add host intents between h1 and h3 - PASS (tick)
  • 1000.5 VLAN1: Add vlan host intents between h4 and h12 - PASS (tick)
  • 1000.6 Confirm that ONOS leadership is unchanged - PASS (tick)

Case 2000: Point Intents Test - 3 NODE(S) - OF 1.0 - Using Flow Objectives - PASS

This test case will test point to point intents using 3 This test case tests Host intents using 1 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 0 OVS running in Mininet and compile intents using Flow RulesObjectives

  • 1000 2000.1 IPV4NOOPTION: Add and test host point intents between h1 and h9 - PASS (tick)
  • 1000 2000.2 DUALSTACK1IPV4: Add host point intents between h3 h1 and h11 h9 - PASS (tick) 1000
  • 2000.3 DUALSTACK2IPV4_2: Add host point intents between h1 and h11 h9 - PASS (tick)
  • 1000 2000.4 1HOPSDNIP-ICMP: Add host point intents between h1 and h3 h9 - PASS (tick)
  • 1000 2000.5 VLAN1SDNIP-TCP: Add vlan host point intents between h4 h1 and h12 h9 - PASS (tick)
  • 1000 2000.6 VLAN2DUALSTACK1: Add inter vlan host point intents between h13 h3 and h20 h11 - PASS (tick) 1000.7
  • 2000.7 VLAN: Add point intents between h5 and h21 - PASS (tick)
  • 2000.8 1HOP: Add point intents between h1 and h3 Confirm that ONOS leadership is unchanged - PASS (tick)

Case

...

3000: Single to Multi Point Intents Test -

...

3 NODE(S) - OF 1.

...

0 - Using Flow

...

Objectives -

...

FAIL

This test case will test single point to multi point intents using 1 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 0 OVS running in Mininet and compile intents using Flow RulesObjectives

  • 2000 3000.1 NOOPTION: Add Install and test single point to multi point intents between h1 and h9 - PASS (tick) 2000- FAIL (error)
    • Assertion results for IPV4 single to multi point intent with no options set
  • 3000.2 IPV4: Add point intents between h1 and Install and test single point to multi point intents - FAIL (error)
    • Assertion results for IPV4 single to multi point intent with IPV4 type and MAC addresses
  • 3000 h9 - PASS (tick) 2000.3 IPV4_2: Add single point intents between h1 and h9 - PASS (tick)
  • 2000.4 SDNIP-ICMP: Add point intents between h1 and h9 - PASS (tick)
  • 2000.5 SDNIP-TCP: Add point intents between h1 and h9 - PASS (tick)
  • 2000.6 DUALSTACK1: Add point intents between h3 and h11 - PASS (tick)
  • 2000.7 VLAN: Add point intents between h5 and h21 - PASS (tick)
  • 2000.8 1HOP: Add point intents between h1 and h3 - PASS (tick)

Case 5000: Test host mobility with host intents - PASS

  • to multi point intents - FAIL (error)
    • Assertion results for IPV4 single to multi point intent with IPV4 type and no MAC addresses
  • 3000.4 VLAN: Add single point to multi point intents - FAIL (error)
    • Assertion results for IPV4 single to multi point intent with IPV4 type and MAC addresses in the same VLAN
  • 3000.5 VLAN: Add single point to multi point intents - FAIL (error)
    • Assertion results for single to multi point intent with VLAN treatment

Case 5000: Test host mobility with host intents - PASS

  • 5000.1 Testing host mobility by moving h1 from s5 to s6 - PASS (tick)
  • 5000.2 IPV4: Add host intents between
  • 5000.1 Testing host mobility by moving h1 from s5 to s6 - PASS (tick)
  • 5000.2 IPV4: Add host intents between h1 and h9 - PASS (tick)

Case 18: Stop Mininet and Scapy - PASS

Stopping the current mininet topology to start up fresh

  • 18.1 Stopping and Removing Scapy Host Components - PASS (tick)
  • 18.2 Stopping Mininet Topology - PASS (tick)

Case

...

19: Copy karaf logs - PASS

Copying the karaf logs to preserve them throughreinstalling ONOS

  • 19.1 Copying karaf logs - PASS (tick)

Case 2: Starting up 1 node(s) ONOS cluster - PASS

Set up ONOS with 3 1 node(s) ONOS cluster

  • 2.1 Uninstalling ONOS package Apply cell to environment - PASS (tick)
  • 2.2 Apply cell to environment Uninstalling Atomix - PASS (tick)
  • 2.3 Creating Uninstalling ONOS package - PASS (tick)
  • 2.4 Installing Creating ONOS package - PASS (tick)
  • 2.5 Starting ONOS service Installing Atomix - PASS (tick)
  • 2.6 Start Installing ONOS cli package - PASS (tick)

Case 11: Start Mininet topology with OF 1.3 switches - PASS

  • 2.7 Set up ONOS secure SSH - PASS (tick)
  • 2.8 Checking ONOS service - PASS (tick)
  • 2.9 Starting ONOS CLI sessions - PASS (tick)
  • 2.10 Checking ONOS nodes - PASS (tick)
  • 2.11 Checking ONOS applications - PASS (tick)

Case 11: Start Mininet topology with OF 1.3 switches - PASS

Start mininet topology with OF 1.3 switches to Start mininet topology with OF 1.3 switches to test intents, exits out if topology did not start correctly

  • 11.1 Starting Mininet topology with OF 1.3 switches - PASS (tick)

Case 12: Assign switches to controllers - PASS

Assign OF 1.3 switches to ONOS nodes

  • 12.1 Assigning switches to controllers - PASS (tick)

Case 13: Create scapy components - PASS

  • 13.1 Create scapy components - No Result (warning)
  • 13.2 Start scapy components - PASS (tick)

Case 15: Discover all hosts using scapy - PASS

  • 15.1 Send packets from each host to the first host and confirm onos discovery - PASS (tick)
  • 15.2 Populate hostsData - PASS (tick)

Case 16: Balance mastership of switches - PASS

  • 16.1 Balancing mastership of switches - PASS (tick)

Case 1000: Host Intents Test -

...

1 NODE(S) - OF 1.3 - Using Flow Rules - PASS

This test case tests Host intents using 3 1 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet and compile intents using Flow Rules

  • 1000.1 IPV4: Add and test host intents between h1 and h9 - PASS (tick)
  • 1000.2 DUALSTACK1: Add host intents between h3 and h11 - PASS (tick)
  • 1000.3 DUALSTACK2: Add host intents between h1 and h11 - PASS (tick)
  • 1000.4 1HOP: Add host intents between h1 and h3 - PASS (tick)
  • 1000.5 VLAN1: Add vlan host intents between h4 and h12 - PASS (tick)
  • 1000.6 VLAN2: Add inter vlan host intents between h13 and h20 - PASS (tick)
  • 1000.7 Confirm that ONOS leadership is unchanged - PASS (tick)

Case 2000: Point Intents Test - 3 NODE(S) - OF 1.3 - Using Flow Rules - PASS

This test case will test point to point intents using 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet and compile intents using Flow Rules

  • 2000.1 NOOPTION: Add point intents between h1 and h9 - PASS (tick)
  • 2000.2 IPV4: Add point intents between h1 and h9 - PASS (tick)
  • 2000.3 IPV4_2: Add point intents between h1 and h9 - PASS (tick)
  • 2000.4 SDNIP-ICMP: Add point intents between h1 and h9 - PASS (tick)
  • 2000.5 SDNIP-TCP: Add point intents between h1 and h9 - PASS (tick)
  • 2000.6 DUALSTACK1: Add point intents between h3 and h11 - PASS (tick)
  • 2000.7 VLAN: Add point intents between h5 and h21 - PASS (tick)
  • 2000.8 1HOP: Add point intents between h1 and h3 - PASS (tick)

Case 5000: Test host mobility with host intents - PASS

  • 5000.1 Testing host mobility by moving h1 from s5 to s6 - PASS (tick)
  • 5000.2 IPV4: Add host intents between h1 and h9 - PASS (tick)

Case 18: Stop Mininet and Scapy - PASS

Stopping the current mininet topology to start up fresh

  • 18.1 Stopping and Removing Scapy Host Components - PASS (tick)
  • 18.2 Stopping Mininet Topology - PASS (tick)

Case 2: Starting up 1 node(s) ONOS cluster - PASS

Set up ONOS with 1 node(s) ONOS cluster

  • 2.1 Uninstalling ONOS package - PASS (tick)
  • 2.2 Apply cell to environment - PASS (tick)
  • 2.3 Creating ONOS package - PASS (tick)
  • 2.4 Installing ONOS package - PASS (tick)
  • 2.5 Starting ONOS service - PASS (tick)
  • 2.6 Start ONOS cli - PASS (tick)

Case 11: Start Mininet topology with OF 1.3 switches - PASS

Start mininet topology with OF 1.3 switches to test intents, exits out if topology did not start correctly

  • 11.1 Starting Mininet topology with OF 1.3 switches - PASS (tick)

Case 12: Assign switches to controllers - PASS

Assign OF 1.3 switches to ONOS nodes

  • 12.1 Assigning switches to controllers - PASS (tick)

Case 13: Create scapy components - PASS

  • 13.1 Create scapy components - No Result (warning)
  • 13.2 Start scapy components - PASS (tick)

Case 15: Discover all hosts using scapy - PASS

  • 15.1 Send packets from each host to the first host and confirm onos discovery - PASS (tick)
  • 15.2 Populate hostsData - PASS (tick)

Case 16: Balance mastership of switches - PASS

  • 16.1 Balancing mastership of switches - PASS (tick)

Case 17: Enable intent compilation using Flow Objectives - PASS

  • 17.1 Enabling Flow Objectives - PASS (tick)

...

use OF 1.3 OVS running in Mininet and compile intents using Flow Rules

  • 1000.1 IPV4: Add and test host intents between h1 and h9 - PASS (tick)
  • 1000.2 DUALSTACK1: Add host intents between h3 and h11 - PASS (tick)
  • 1000.3 DUALSTACK2: Add host intents between h1 and h11 - PASS (tick)
  • 1000.4 1HOP: Add host intents between h1 and h3 - PASS (tick)
  • 1000.5 VLAN1: Add vlan host intents between h4 and h12 - PASS (tick)
  • 1000.6 Confirm that ONOS leadership is unchanged - PASS (tick)

Case 2000: Point Intents Test - 1 NODE(S) - OF 1.3 - Using Flow Rules - PASS

This test case will test point to point intents using 1 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet and compile intents using Flow Rules

  • 2000.1 NOOPTION: Add point intents between h1 and h9 - PASS (tick)
  • 2000.2 IPV4: Add point intents between h1 and h9 - PASS (tick)
  • 2000.3 IPV4_2: Add point intents between h1 and h9 - PASS (tick)
  • 2000.4 SDNIP-ICMP: Add point intents between h1 and h9 - PASS (tick)
  • 2000.5 SDNIP-TCP: Add point intents between h1 and h9 - PASS (tick)
  • 2000.6 DUALSTACK1: Add point intents between h3 and h11 - PASS (tick)
  • 2000.7 VLAN: Add point intents between h5 and h21 - PASS (tick)
  • 2000.8 1HOP: Add point intents between h1 and h3 - PASS (tick)

Case 3000: Single to Multi Point Intents Test - 1 NODE(S) - OF 1.3 - Using Flow Rules - FAIL

This test case will test single point to multi point intents using 1 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet and compile intents using Flow Rules

  • 3000.1 NOOPTION: Install and test single point to multi point intents - FAIL (error)
    • Assertion results for IPV4 single to multi point intent with no options set
  • 3000.2 IPV4: Install and test single point to multi point intents - FAIL (error)
    • Assertion results for IPV4 single to multi point intent with IPV4 type and MAC addresses
  • 3000.3 IPV4_2: Add single point to multi point intents - FAIL (error)
    • Assertion results for IPV4 single to multi point intent with IPV4 type and no MAC addresses
  • 3000.4 VLAN: Add single point to multi point intents - FAIL (error)
    • Assertion results for IPV4 single to multi point intent with IPV4 type and MAC addresses in the same VLAN
  • 3000.5 VLAN: Add single point to multi point intents - FAIL (error)
    • Assertion results for single to multi point intent with VLAN treatment

Case 5000: Test host mobility with host intents - PASS

  • 5000.1 Testing host mobility by moving h1 from s5 to s6 - PASS (tick)
  • 5000.2 IPV4: Add host intents between h1 and h9 - PASS (tick)

Case 18: Stop Mininet and Scapy - PASS

Stopping the current mininet topology to start up fresh

  • 18.1 Stopping and Removing Scapy Host Components - PASS (tick)
  • 18.2 Stopping Mininet - PASS (tick)

Case 19: Copy karaf logs - PASS

Copying the karaf logs to preserve them throughreinstalling ONOS

  • 19.1 Copying karaf logs - PASS (tick)

Case 2: Starting up 3 node(s) ONOS cluster - PASS

Set up ONOS with 3 node(s) ONOS cluster

  • 2.1 Apply cell to environment - PASS (tick)
  • 2.2 Uninstalling Atomix - PASS (tick)
  • 2.3 Uninstalling ONOS package - PASS (tick)
  • 2.4 Creating ONOS package - PASS (tick)
  • 2.5 Installing Atomix - PASS (tick)
  • 2.6 Installing ONOS package - PASS (tick)
  • 2.7 Set up ONOS secure SSH - PASS (tick)
  • 2.8 Checking ONOS service - PASS (tick)
  • 2.9 Starting ONOS CLI sessions - PASS (tick)
  • 2.10 Checking ONOS nodes - PASS (tick)
  • 2.11 Checking ONOS applications - PASS (tick)

Case 11: Start Mininet topology with OF 1.3 switches - PASS

Start mininet topology with OF 1.3 switches to test intents, exits out if topology did not start correctly

  • 11.1 Starting Mininet topology with OF 1.3 switches - PASS (tick)

Case 12: Assign switches to controllers - PASS

Assign OF 1.3 switches to ONOS nodes

  • 12.1 Assigning switches to controllers - PASS (tick)

Case 13: Create scapy components - PASS

  • 13.1 Create scapy components - No Result (warning)
  • 13.2 Start scapy components - PASS (tick)

Case 15: Discover all hosts using scapy - PASS

  • 15.1 Send packets from each host to the first host and confirm onos discovery - PASS (tick)
  • 15.2 Populate hostsData - PASS (tick)

Case 16: Balance mastership of switches - PASS

  • 16.1 Balancing mastership of switches - PASS (tick)

Case 1000: Host Intents Test - 3 NODE(S) - OF 1.3 - Using Flow Rules - PASS

This test case tests Host intents using 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet and compile intents using Flow Rules

  • 1000.1 IPV4: Add and test host intents between h1 and h9 - PASS (tick)
  • 1000.2 DUALSTACK1: Add host intents between h3 and h11 - PASS (tick)
  • 1000.3 DUALSTACK2: Add host intents between h1 and h11 - PASS (tick)
  • 1000.4 1HOP: Add host intents between h1 and h3 - PASS (tick)
  • 1000.5 VLAN1: Add vlan host intents between h4 and h12 - PASS (tick)
  • 1000.6 Confirm that ONOS leadership is unchanged - PASS (tick)

Case 2000: Point Intents Test - 3 NODE(S) - OF 1.3 - Using Flow Rules - PASS

This test case will test point to point intents using 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet and compile intents using Flow Rules

  • 2000.1 NOOPTION: Add point intents between h1 and h9 - PASS (tick)
  • 2000.2 IPV4: Add point intents between h1 and h9 - PASS (tick)
  • 2000.3 IPV4_2: Add point intents between h1 and h9 - PASS (tick)
  • 2000.4 SDNIP-ICMP: Add point intents between h1 and h9 - PASS (tick)
  • 2000.5 SDNIP-TCP: Add point intents between h1 and h9 - PASS (tick)
  • 2000.6 DUALSTACK1: Add point intents between h3 and h11 - PASS (tick)
  • 2000.7 VLAN: Add point intents between h5 and h21 - PASS (tick)
  • 2000.8 1HOP: Add point intents between h1 and h3 - PASS (tick)

Case 3000: Single to Multi Point Intents Test - 3 NODE(S) - OF 1.3 - Using Flow Rules - FAIL

This test case will test single point to multi point intents using 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet and compile intents using Flow Rules

  • 3000.1 NOOPTION: Install and test single point to multi point intents - FAIL (error)
    • Assertion results for IPV4 single to multi point intent with no options set
  • 3000.2 IPV4: Install and test single point to multi point intents - FAIL (error)
    • Assertion results for IPV4 single to multi point intent with IPV4 type and MAC addresses
  • 3000.3 IPV4_2: Add single point to multi point intents - FAIL (error)
    • Assertion results for IPV4 single to multi point intent with IPV4 type and no MAC addresses
  • 3000.4 VLAN: Add single point to multi point intents - FAIL (error)
    • Assertion results for IPV4 single to multi point intent with IPV4 type and MAC addresses in the same VLAN
  • 3000.5 VLAN: Add single point to multi point intents - FAIL (error)
    • Assertion results for single to multi point intent with VLAN treatment

Case 5000: Test host mobility with host intents - PASS

  • 5000.1 Testing host mobility by moving h1 from s5 to s6 - PASS (tick)
  • 5000.2 IPV4: Add host intents between h1 and h9 - PASS (tick)

Case 18: Stop Mininet and Scapy - PASS

Stopping the current mininet topology to start up fresh

  • 18.1 Stopping and Removing Scapy Host Components - PASS (tick)
  • 18.2 Stopping Mininet - PASS (tick)

Case 19: Copy karaf logs - PASS

Copying the karaf logs to preserve them throughreinstalling ONOS

  • 19.1 Copying karaf logs - PASS (tick)

Case 2: Starting up 1 node(s) ONOS cluster - PASS

Set up ONOS with 1 node(s) ONOS cluster

  • 2.1 Apply cell to environment - PASS (tick)
  • 2.2 Uninstalling Atomix - PASS (tick)
  • 2.3 Uninstalling ONOS package - PASS (tick)
  • 2.4 Creating ONOS package - PASS (tick)
  • 2.5 Installing Atomix - PASS (tick)
  • 2.6 Installing ONOS package - PASS (tick)
  • 2.7 Set up ONOS secure SSH - PASS (tick)
  • 2.8 Checking ONOS service - PASS (tick)
  • 2.9 Starting ONOS CLI sessions - PASS (tick)
  • 2.10 Checking ONOS nodes - PASS (tick)
  • 2.11 Checking ONOS applications - PASS (tick)

Case 11: Start Mininet topology with OF 1.3 switches - PASS

Start mininet topology with OF 1.3 switches to test intents, exits out if topology did not start correctly

  • 11.1 Starting Mininet topology with OF 1.3 switches - PASS (tick)

Case 12: Assign switches to controllers - PASS

Assign OF 1.3 switches to ONOS nodes

  • 12.1 Assigning switches to controllers - PASS (tick)

Case 13: Create scapy components - PASS

  • 13.1 Create scapy components - No Result (warning)
  • 13.2 Start scapy components - PASS (tick)

Case 15: Discover all hosts using scapy - PASS

  • 15.1 Send packets from each host to the first host and confirm onos discovery - PASS (tick)
  • 15.2 Populate hostsData - PASS (tick)

Case 16: Balance mastership of switches - PASS

  • 16.1 Balancing mastership of switches - PASS (tick)

Case 17: Enable intent compilation using Flow Objectives - PASS

  • 17.1 Enabling Flow Objectives - PASS (tick)

Case 1000: Host Intents Test - 1 NODE(S) - OF 1.3 - Using Flow Objectives - PASS

This test case tests Host intents using 1 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet and compile intents using Flow Objectives

  • 1000.1 IPV4: Add and test host intents between h1 and h9 - PASS (tick)
  • 1000.2 DUALSTACK1: Add host intents between h3 and h11 - PASS (tick)
  • 1000.3 DUALSTACK2: Add host intents between h1 and h11 - PASS (tick)
  • 1000.4 1HOP: Add host intents between h1 and h3 - PASS (tick)
  • 1000.5 VLAN1: Add vlan host intents between h4 and h12 - PASS (tick)
  • 1000.6 Confirm that ONOS leadership is unchanged - PASS (tick)

Case 2000: Point Intents Test - 1 NODE(S) - OF 1.3 - Using Flow Objectives - PASS

This test case tests Host will test point to point intents using 1 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet and compile intents using Flow Objectives

  • 1000 2000.1 IPV4NOOPTION: Add and test host point intents between h1 and h9 - PASS (tick)
  • 1000 2000.2 DUALSTACK1IPV4: Add host point intents between h3 h1 and h11 h9 - PASS (tick) 1000
  • 2000.3 DUALSTACK2IPV4_2: Add host point intents between h1 and h11 h9 - PASS (tick)
  • 1000 2000.4 1HOPSDNIP-ICMP: Add host point intents between h1 and h3 h9 - PASS (tick)
  • 1000 2000.5 VLAN1: Add vlan host intents between h4 and h12 SDNIP-TCP: Add point intents between h1 and h9 - PASS (tick)
  • 2000.6 DUALSTACK1: Add point intents between h3 and h11 - PASS (tick) 1000
  • 2000.6 VLAN27 VLAN: Add inter vlan host point intents between h13 h5 and h20 h21 - PASS (tick) 1000.7 Confirm that
  • ONOS leadership is unchanged 2000.8 1HOP: Add point intents between h1 and h3 - PASS (tick)

Case

...

3000: Single to Multi Point Intents Test - 1 NODE(S) - OF 1.3 - Using Flow Objectives - FAIL

This test case will test single point to multi point intents using 1 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet and compile intents using Flow Objectives

  • 2000 3000.1 NOOPTION: Add point intents between h1 and h9 - PASS (tick)
  • 2000.2 IPV4: Add point intents between h1 and h9 - PASS (tick)
  • Install and test single point to multi point intents - FAIL (error)
    • Assertion results for IPV4 single to multi point intent with no options set
  • 3000.2 IPV4: Install and test single point to multi point intents - FAIL (error)
    • Assertion results for IPV4 single to multi point intent with IPV4 type and MAC addresses
  • 3000 2000.3 IPV4_2: Add point intents between h1 and h9 - PASS (tick)
  • 2000.4 SDNIP-ICMP: Add point intents between h1 and h9 - PASS (tick)
  • 2000.5 SDNIP-TCP: Add point intents between h1 and h9 - PASS (tick)
  • single point to multi point intents - FAIL (error)
    • Assertion results for IPV4 single to multi point intent with IPV4 type and no MAC addresses
  • 3000.4 VLAN: Add single point to multi point intents 2000.6 DUALSTACK1: Add point intents between h3 and h11 - FAIL (error)
    • Assertion Result results for Dualstack1 IPV4 with mac address point intents
    • Initial Intent State Passed
    • Initial Flow State Passed
    • Initial Ping Failed
    • Link Down Passed
    • Link Down Intent State Passed
    • Link Down Flow State Passed
    • Link Down Topology State Passed
    • Link Down Pingall Passed
    • Link Up Passed
    • Link Up Intent State Passed
    • Link Up Flow State Passed
    • Link Up Topology State Passed
    • Link Up Scapy Packet Received Passed
    • Remove Intents Passed
  • 2000.7 VLAN: Add point intents between h5 and h21 - PASS (tick)
  • 2000.8 1HOP: Add point intents between h1 and h3 - PASS (tick)
    • IPV4 single to multi point intent with IPV4 type and MAC addresses in the same VLAN
  • 3000.5 VLAN: Add single point to multi point intents - FAIL (error)
    • Assertion results for single to multi point intent with VLAN treatment

Case 5000: Test host mobility with host intents - PASS

  • 5000.1 Testing host mobility by moving h1 from s5 to s6 - PASS (tick)
  • 5000.2 IPV4: Add host intents between h1 and h9 - PASS (tick)

...

  • 18.1 Stopping and Removing Scapy Host Components - PASS (tick) 18.2 Stopping Mininet Topology - PASS (tick)
  • 18.2 Stopping Mininet - PASS (tick)

Case 19: Copy karaf logs - PASS

Copying the karaf logs to preserve them throughreinstalling ONOS

  • 19.1 Copying karaf logs - PASS (tick)

Case 2: Starting up 3 node(s) ONOS cluster - PASS

Set up ONOS with 3 node(s) ONOS cluster

  • 2.1 Uninstalling ONOS package Apply cell to environment - PASS (tick)
  • 2.2 Apply cell to environment Uninstalling Atomix - PASS (tick)
  • 2.3 Uninstalling ONOS package - PASS (tick)
  • 2.4 Creating ONOS package - PASS (tick)
  • 2.5 Installing Atomix - PASS (tick)
  • 2.4 6 Installing ONOS package - PASS (tick)
  • 2.7 Set up ONOS secure SSH - PASS (tick)
  • 2.8 Checking ONOS service - PASS (tick)
  • 2.5 Starting ONOS service 9 Starting ONOS CLI sessions - PASS (tick)
  • 2.10 Checking ONOS nodes - PASS (tick)
  • 2.6 Start 11 Checking ONOS cli applications - PASS (tick)

Case 11: Start Mininet topology with OF 1.3 switches - PASS

...

  • 13.1 Create scapy components - No Result (warning)
  • 13.2 Start scapy components .2 Start scapy components - PASS (tick)

Case 15: Discover all hosts using scapy - PASS

  • 15.1 Send packets from each host to the first host and confirm onos discovery - PASS (tick)
  • 15.2 Populate hostsData - PASS (tick)

Case 16: Balance mastership of switches - PASS

  • 16.1 Balancing mastership of switches - PASS (tick)

Case 17: Enable intent compilation using Flow Objectives - PASS

  • 17.1 Enabling Flow Objectives - PASS (tick)

Case

...

  • 15.1 Send packets from each host to the first host and confirm onos discovery - PASS (tick)
  • 15.2 Populate hostsData - PASS (tick)

Case 16: Balance mastership of switches - PASS

  • 16.1 Balancing mastership of switches - PASS (tick)

Case 17: Enable intent compilation using Flow Objectives - PASS

  • 17.1 Enabling Flow Objectives - PASS (tick)

...

1000: Host Intents Test - 3 NODE(S) - OF 1.3 - Using Flow Objectives - PASS

This test case tests Host intents using 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet and compile intents using Flow Objectives

  • 1000.1 IPV4: Add and test host intents between h1 and h9 - PASS (tick)
  • 1000.2 DUALSTACK1: Add host intents between h3 and h11 - PASS (tick)
  • 1000.3 DUALSTACK2: Add host intents between h1 and h11 - PASS (tick)
  • 1000.4 1HOP: Add host intents between h1 and h3 - PASS (tick)
  • 1000.5 VLAN1: Add vlan host intents between h4 and h12 - PASS (tick)
  • 1000.6 Confirm that ONOS leadership is unchanged - PASS (tick)

Case 2000: Point Intents Test - 3 NODE(S) - OF 1.3 - Using Flow Objectives - PASS

This test case tests Host will test point to point intents using 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet and compile intents using Flow Objectives

  • 1000 2000.1 IPV4NOOPTION: Add and test host point intents between h1 and h9 - PASS (tick)
  • 1000 2000.2 DUALSTACK1IPV4: Add host point intents between h3 h1 and h11 h9 - PASS (tick) 1000
  • 2000.3 DUALSTACK2IPV4_2: Add host point intents between h1 and h11 h9 - PASS (tick)
  • 1000 2000.4 1HOPSDNIP-ICMP: Add host point intents between h1 and h3 h9 - PASS (tick)
  • 1000 2000.5 VLAN1: Add vlan host intents between h4 and h12 SDNIP-TCP: Add point intents between h1 and h9 - PASS (tick)
  • 2000.6 DUALSTACK1: Add point intents between h3 and h11 - PASS (tick) 1000
  • 2000.6 VLAN27 VLAN: Add inter vlan host point intents between h13 h5 and h20 h21 - PASS (tick) 1000.7 Confirm that
  • ONOS leadership is unchanged 2000.8 1HOP: Add point intents between h1 and h3 - PASS (tick)

Case

...

3000: Single to Multi Point Intents Test - 3 NODE(S) - OF 1.3 - Using Flow Objectives - FAIL

This test case will test single point to multi point intents using 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet and compile intents using Flow Objectives

  • 2000 3000.1 NOOPTION: Add point intents between h1 and h9 - PASS (tick)
  • 2000.2 IPV4: Add point intents between h1 and h9 - PASS (tick)
  • Install and test single point to multi point intents - FAIL (error)
    • Assertion results for IPV4 single to multi point intent with no options set
  • 3000.2 IPV4: Install and test single point to multi point intents - FAIL (error)
    • Assertion results for IPV4 single to multi point intent with IPV4 type and MAC addresses
  • 3000 2000.3 IPV4_2: Add point intents between h1 and h9 - PASS (tick)
  • 2000.4 SDNIP-ICMP: Add point intents between h1 and h9 - PASS (tick)
  • 2000.5 SDNIP-TCP: Add point intents between h1 and h9 - PASS (tick)
  • single point to multi point intents - FAIL (error)
    • Assertion results for IPV4 single to multi point intent with IPV4 type and no MAC addresses
  • 3000.4 VLAN: Add single point to multi point intents 2000.6 DUALSTACK1: Add point intents between h3 and h11 - FAIL (error)
    • Assertion Result results for Dualstack1 IPV4 with mac address point intents
    • Initial Intent State Passed
    • Initial Flow State Passed
    • Initial Ping Failed
    • Link Down Passed
    • Link Down Intent State Passed
    • Link Down Flow State Passed
    • Link Down Topology State Passed
    • Link Down Pingall Passed
    • Link Up Passed
    • Link Up Intent State Passed
    • Link Up Flow State Passed
    • Link Up Topology State Passed
    • Link Up Scapy Packet Received Passed
    • Remove Intents Passed
  • 2000.7 VLAN: Add point intents between h5 and h21 - PASS (tick)
  • 2000.8 1HOP: Add point intents between h1 and h3 - PASS (tick)
    • single to multi point intent with IPV4 type and MAC addresses in the same VLAN
  • 3000.5 VLAN: Add single point to multi point intents - FAIL (error)
    • Assertion results for single to multi point intent with VLAN treatment

Case 5000: Test host mobility with host intents - PASS

  • 5000.1 Testing host mobility by moving h1 from s5 to s6 - PASS (tick)
  • 5000.2 IPV4: Add host intents between h1 and h9 - PASS (tick)

...

  • 18.1 Stopping and Removing Scapy Host Components - PASS (tick)
  • 18.2 Stopping Mininet Topology - PASS (tick)

Case 19: Copy karaf logs - PASS

Copying the karaf logs to preserve them throughreinstalling ONOS