Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: Published from Jenkins build: https://jenkins.onosproject.org/job/SR-pipeline-2.2/1058/

...

HTML
<img src="https://jenkins.onosproject.org/view/QA/job/postjob-Fabric3/lastSuccessfulBuild/artifact/SRDhcprelay_onos-2.2_20-builds_graph.jpg", alt="SRDhcprelay", style="width:525px;height:350px;border:0">

commit f543ff8a316e33f5c7e31f673da17c0008a8b873 9fb3e697da1064872136983823e7164ea992bf42 (HEAD -] onos-2.2, origin/onos-2.2)
Author: pier [pier@opennetworking.orgWilliam Davies [william.davies@infosys.com]
AuthorDate: Tue Jun 25 14:09:57 2019 +0200Sat Oct 19 11:33:55 2019 -0700
Commit: Pier Luigi Ventre [pier@opennetworking.org]
CommitDate: Wed Fri Oct 23 1025 12:2207:20 57 2019 +0000
Improves host location provider introducing a pool of worker threads
REST API for FPM Accept Routes

Case 1: DHCP v4 tests with 4 clients attached to switch directly and 1 server attached to switch directly, with 3 ONOS instances - PASS

...

  • 51.1 Apply cell to environment - PASS (tick)
  • 51.2 Uninstalling Atomix - PASS (tick)
  • 51.3 Uninstalling ONOS package - PASS (tick)
  • 51.4 Installing Atomix - PASS (tick)
  • 51.5 Installing ONOS package - PASS (tick)
  • 51.6 Set up ONOS secure SSH - PASS (tick)
  • 51.7 Checking ONOS service - PASS (tick)
  • 51.8 Starting ONOS CLI sessions - PASS (tick)
  • 51.9 Checking ONOS nodes - PASS (tick)
  • 51.10 Checking ONOS applications - PASS (tick)
  • 51.11 Starting Mininet Topology - PASS (tick)
  • 51.12 Verify host IP address assignment in ONOS - FAIL (error)
    • Verify ONOS host IP failed
  • 51.13 Stopping Mininet - PASS (tick)
    • Skipping the rest of this case.

Case 61: DHCP v4 tests with dual-homed tagged hosts: 4 clients attached to switch directly and 1 server attached to switch directly, with 3 ONOS instances -

...

  • 61.1 Apply cell to environment - PASS (tick)
  • 61.2 Uninstalling Atomix - PASS (tick)
  • 61.3 Uninstalling ONOS package - PASS (tick)
  • 61.4 Installing Atomix - PASS (tick)
  • 61.5 Installing ONOS package - PASS (tick)
  • 61.6 Set up ONOS secure SSH - PASS (tick)
  • 61.7 Checking ONOS service - PASS (tick)
  • 61.8 Starting ONOS CLI sessions - PASS (tick)
  • 61.9 Checking ONOS nodes - PASS (tick)
  • 61.10 Checking ONOS applications - PASS (tick)
  • 61.11 Starting Mininet Topology - PASS (tick)
  • 61.12 Verify host IP address assignment in ONOS - PASS (tick)
  • 61.13 Verify IP address assignment from hosts - PASS (tick)
  • 61.14 Stopping Mininet - PASS (tick)
  • 61.15 Copying karaf logs - PASS (tick)

Case 71: DHCP v6 tests with dual-homed tagged hosts: 4 clients attached to switch directly and 1 server attached to switch directly, with 3 ONOS instances - PASS

...

FAIL