Due to a ransomware attack, the wiki was reverted to a July 2022 version. . We apologize for the lack of a more recent valid backup.
...
...
HTML |
---|
<img src="https://jenkins.onosproject.org/view/QA/job/postjob-VM/lastSuccessfulBuild/artifact/FUNCnetconf_master_20-builds_graph.jpg", alt="FUNCnetconf", style="width:525px;height:350px;border:0"> |
commit 581c8407e613a27aaa573a600828b30a37066fb8 commit d2edd470303ab3e7ce9e7e51b61439a9831214c2 (HEAD, origin/master, origin/HEAD, master)
Author: Charles Chan pierventre [rascov@gmailpier@opennetworking.comorg]
AuthorDate: Mon Oct 17 18Thu Sep 23 19:03:37 2016 -070014 2021 +0200
Commit: Charles Chan [charles@onlab.usPier Luigi Ventre [pier@opennetworking.org]
CommitDate: Wed Oct Mon Sep 27 19 01:2127:38 2016 55 2021 +0000
CORD-378 Validate ARP SPA in segment routing ARP handler
[SDFAB-616] Inconsistent format of port number in DhcpRelay
--
(cherry picked from commit 61bd673eec2282aff175daff141059870db78c7d)
Case 1:
...
Pull onos branch and build onos on Teststation. - PASS
This test case is mainly for For loading from params file, and pull and build the latest ONOS package
- 1.1 Constructing test variables - PASS
Case 2:
...
Set up ONOS with 1 node(s) ONOS cluster
...
Starting
...
up
...
- 100.1 Starting NETCONF app - PASS
- 100.2 Starting OFC-Server - PASS
Case 200: Assemble the configuration Test - 1 NODES(S) - PASS
- 200.1 Assembling configuration file - PASS
Case 300: Uploading the configuration Test - 1 NODES(S) - FAIL
...
1
...
- Assertion result for confirming a configuration.
Case 19: Copy karaf logs - PASS
Copying the karaf logs to preserve them throughreinstalling ONOS
- 19.1 Copying karaf logs - PASS
...
node(s) ONOS cluster
...
Set up ONOS with 3 node(s) ONOS cluster
...
-
...
Case 100: Start up NETCONF app in all nodes Test - 3 NODE(S) - PASS
- 100.1 Starting NETCONF app - PASS
- 100.2 Starting OFC-Server - PASS
Case 200: Assemble the configuration Test - 3 NODES(S) - PASS
- 200.1 Assembling configuration file - PASS
Case 300: Uploading the configuration Test - 3 NODES(S) - FAIL
...
FAIL
...
- Assertion result for confirming a configuration.
Case 19: Copy karaf logs - PASS
Copying the karaf logs to preserve them throughreinstalling ONOS
...