Have questions? Stuck? Please check our FAQ for some common questions and answers.

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 11 Next »

SRDhcprelay at 03 Aug 2020 19:31:52

SRDhcprelay-stratum

commit a1b624eaa1d0241b2c8161c7854f012664908353 (HEAD -] master, origin/master, origin/HEAD)
Author: Thomas Vachuska [tom@opennetworking.org]
AuthorDate: Fri Jul 31 14:20:32 2020 -0700
Commit: Sean Condon [sean@opennetworking.org]
CommitDate: Mon Aug 3 07:55:09 2020 +0000

Removing the host drop-shadow from the topo GUI2

Case 1: DHCP v4 tests with 4 clients attached to switch directly and 1 server attached to switch directly, with 3 ONOS instances - PASS

  • 1.1 Constructing test variables - PASS (tick)
  • 1.2 Apply cell to environment - PASS (tick)
  • 1.3 Uninstalling Atomix - PASS (tick)
  • 1.4 Uninstalling ONOS package - PASS (tick)
  • 1.5 Creating ONOS package - PASS (tick)
  • 1.6 Installing Atomix - PASS (tick)
  • 1.7 Installing ONOS package - PASS (tick)
  • 1.8 Set up ONOS secure SSH - PASS (tick)
  • 1.9 Checking ONOS service - PASS (tick)
  • 1.10 Starting ONOS CLI sessions - PASS (tick)
  • 1.11 Checking ONOS nodes - PASS (tick)
  • 1.12 Checking ONOS applications - PASS (tick)
  • 1.13 Set logging levels - PASS (tick)
  • 1.14 Set ONOS configurations - PASS (tick)
  • 1.15 Starting Mininet Topology - PASS (tick)
  • 1.16 Verify host IP address assignment in ONOS - PASS (tick)
  • 1.17 Verify IP address assignment from hosts - PASS (tick)
  • 1.18 Stopping Mininet - PASS (tick)
  • 1.19 Copying karaf logs - PASS (tick)

Case 2: DHCP v4 tests with 4 clients attached to switch directly and 1 server attached to switch indirectly (via gateway), with 3 ONOS instances - FAIL

  • 2.1 Apply cell to environment - PASS (tick)
  • 2.2 Uninstalling Atomix - PASS (tick)
  • 2.3 Uninstalling ONOS package - PASS (tick)
  • 2.4 Installing Atomix - PASS (tick)
  • 2.5 Installing ONOS package - PASS (tick)
  • 2.6 Set up ONOS secure SSH - PASS (tick)
  • 2.7 Checking ONOS service - PASS (tick)
  • 2.8 Starting ONOS CLI sessions - PASS (tick)
  • 2.9 Checking ONOS nodes - PASS (tick)
  • 2.10 Checking ONOS applications - PASS (tick)
  • 2.11 Set logging levels - PASS (tick)
  • 2.12 Set ONOS configurations - PASS (tick)
  • 2.13 Starting Mininet Topology - PASS (tick)
  • 2.14 Verify host IP address assignment in ONOS - FAIL (error)
    • Verify ONOS host IP failed
  • 2.15 Stopping Mininet - PASS (tick)
    • Skipping the rest of this case.

Case 11: DHCP v6 tests with 4 clients attached to switch directly and 1 server attached to switch directly, with 3 ONOS instances - FAIL

  • 11.1 Apply cell to environment - PASS (tick)
  • 11.2 Uninstalling Atomix - PASS (tick)
  • 11.3 Uninstalling ONOS package - PASS (tick)
  • 11.4 Installing Atomix - PASS (tick)
  • 11.5 Installing ONOS package - PASS (tick)
  • 11.6 Set up ONOS secure SSH - PASS (tick)
  • 11.7 Checking ONOS service - PASS (tick)
  • 11.8 Starting ONOS CLI sessions - PASS (tick)
  • 11.9 Checking ONOS nodes - PASS (tick)
  • 11.10 Checking ONOS applications - PASS (tick)
  • 11.11 Set logging levels - PASS (tick)
  • 11.12 Set ONOS configurations - PASS (tick)
  • 11.13 Starting Mininet Topology - PASS (tick)
  • 11.14 Verify host IP address assignment in ONOS - FAIL (error)
    • Verify ONOS host IP failed
  • 11.15 Stopping Mininet - PASS (tick)
    • Skipping the rest of this case.

Case 12: DHCP v6 tests with 4 clients attached to switch directly and 1 server attached to switch indirectly (via gateway), with 3 ONOS instances - FAIL

  • 12.1 Apply cell to environment - PASS (tick)
  • 12.2 Uninstalling Atomix - PASS (tick)
  • 12.3 Uninstalling ONOS package - PASS (tick)
  • 12.4 Installing Atomix - PASS (tick)
  • 12.5 Installing ONOS package - PASS (tick)
  • 12.6 Set up ONOS secure SSH - PASS (tick)
  • 12.7 Checking ONOS service - PASS (tick)
  • 12.8 Starting ONOS CLI sessions - PASS (tick)
  • 12.9 Checking ONOS nodes - PASS (tick)
  • 12.10 Checking ONOS applications - PASS (tick)
  • 12.11 Set logging levels - PASS (tick)
  • 12.12 Set ONOS configurations - PASS (tick)
  • 12.13 Starting Mininet Topology - PASS (tick)
  • 12.14 Verify host IP address assignment in ONOS - FAIL (error)
    • Verify ONOS host IP failed
  • 12.15 Stopping Mininet - PASS (tick)
    • Skipping the rest of this case.

Case 21: DHCP v4 tests with tagged hosts: 4 clients attached to switch directly and 1 server attached to switch directly, with 3 ONOS instances - FAIL

  • No labels