Have questions? Stuck? Please check our FAQ for some common questions and answers.

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 138 Next »

SRLinkFailure at 30 Aug 2021 21:17:23

SRLinkFailure-stratum

commit a828719294709152f3a7704ff851e00360ab1b4e (HEAD -] master, origin/master, origin/HEAD)
Author: Niraj Dubey [niraj.d@samsung.com]
AuthorDate: Tue Mar 23 19:54:17 2021 +0530
Commit: Thomas Vachuska [tom@opennetworking.org]
CommitDate: Fri Aug 27 16:06:48 2021 +0000

BGP Monitoring in ONOS.

Case 1: Bridging and Routing Link Failure test with 2x2 leaf-spine topology and 1 Onos - FAIL

  • 1.1 Constructing test variables - PASS (tick)
  • 1.2 Apply cell to environment - PASS (tick)
  • 1.3 Uninstalling Atomix - PASS (tick)
  • 1.4 Uninstalling ONOS package - PASS (tick)
  • 1.5 Building ONOS Docker image - PASS (tick)
  • 1.6 Create Cluster Config - PASS (tick)
  • 1.7 Installing Atomix via docker containers - PASS (tick)
  • 1.8 Installing ONOS via docker containers - PASS (tick)
  • 1.9 Set up ONOS secure SSH - PASS (tick)
  • 1.10 Starting ONOS CLI sessions - PASS (tick)
  • 1.11 Checking ONOS nodes - PASS (tick)
  • 1.12 Checking ONOS applications - PASS (tick)
  • 1.13 Set logging levels - PASS (tick)
  • 1.14 Set ONOS configurations - PASS (tick)
  • 1.15 Starting Mininet Topology - PASS (tick)
  • 1.16 Configure switches in ONOS - PASS (tick)
  • 1.17 Check number of topology elements - FAIL (error)
    • Unexpected number of links, switches, and/or controllers: The number of links, switches, nodes, and SCCs does not match what was expected
    • ONOS sees 4 devices (4 expected) and 0 links (8 expected) and 1 controllers (1 expected) and 4 SCCs (1 expected)
  • 1.18 Check whether the flow count is >= 116 - FAIL (error)
    • Flow count looks wrong; found 6, expecting at least 116
  • 1.19 Check whether all flow status are ADDED - FAIL (error)
    • Flow status is wrong!
  • 1.20 Verify full connectivity for [u'h1', u'h2', u'h3', u'h4'] with tag CASE1 - FAIL (error)
    • IP connectivity failed
  • 1.21 Verify full connectivity for [u'olt10', u'vsg10'] with tag CASE1 - FAIL (error)
    • IP connectivity failed
  • 1.22 Verify full connectivity for [u'olt5', u'vsg5'] with tag CASE1 - FAIL (error)
    • IP connectivity failed
  • 1.23 Kill link between spine101 and leaf2 - PASS (tick)
  • 1.24 Checking topology after link down - FAIL (error)
    • Topology after link down is incorrect
  • 1.25 Verify full connectivity for [u'h1', u'h2', u'h3', u'h4'] with tag CASE1_Failure - FAIL (error)
    • IP connectivity failed
  • 1.26 Verify full connectivity for [u'olt10', u'vsg10'] with tag CASE1_Failure - FAIL (error)
    • IP connectivity failed
  • 1.27 Verify full connectivity for [u'olt5', u'vsg5'] with tag CASE1_Failure - FAIL (error)
    • IP connectivity failed
  • 1.28 Restore link between spine101 and leaf2 - FAIL (error)
    • Failed to bring link up
  • 1.29 Check whether the flow count is >= 116 - FAIL (error)
    • Flow count looks wrong; found 6, expecting at least 116
  • 1.30 Check whether all flow status are ADDED - FAIL (error)
    • Flow status is wrong!
  • 1.31 Verify full connectivity for [u'h1', u'h2', u'h3', u'h4'] with tag CASE1_Recovery - FAIL (error)
    • IP connectivity failed
  • 1.32 Verify full connectivity for [u'olt10', u'vsg10'] with tag CASE1_Recovery - FAIL (error)
    • IP connectivity failed
  • 1.33 Verify full connectivity for [u'olt5', u'vsg5'] with tag CASE1_Recovery - FAIL (error)
    • IP connectivity failed
  • 1.34 Check number of topology elements - FAIL (error)
    • Unexpected number of links, switches, and/or controllers: The number of links, switches, nodes, and SCCs does not match what was expected
    • ONOS sees 4 devices (4 expected) and 0 links (8 expected) and 1 controllers (1 expected) and 4 SCCs (1 expected)
  • 1.35 Stopping Mininet - PASS (tick)
  • 1.36 Copying karaf logs - PASS (tick)

Case 2: Bridging and Routing Link Failure test with 4x4 dual-homed leaf-spine topology and 1 Onos - FAIL

  • 2.1 Apply cell to environment - PASS (tick)
  • 2.2 Uninstalling Atomix - PASS (tick)
  • 2.3 Uninstalling ONOS package - PASS (tick)
  • 2.4 Building ONOS Docker image - PASS (tick)
  • 2.5 Create Cluster Config - PASS (tick)
  • 2.6 Installing Atomix via docker containers - PASS (tick)
  • 2.7 Installing ONOS via docker containers - PASS (tick)
  • 2.8 Set up ONOS secure SSH - PASS (tick)
  • 2.9 Starting ONOS CLI sessions - PASS (tick)
  • 2.10 Checking ONOS nodes - PASS (tick)
  • 2.11 Checking ONOS applications - PASS (tick)
  • 2.12 Set logging levels - PASS (tick)
  • 2.13 Set ONOS configurations - PASS (tick)
  • 2.14 Stopping Mininet - PASS (tick)
  • 2.15 Copying karaf logs - PASS (tick)
    • Skipping the rest of this case. 'mininetArgs'

Case 4: Bridging and Routing Link Failure test with 2x2 leaf-spine topology and 3 Onos - FAIL

  • 4.1 Apply cell to environment - PASS (tick)
  • 4.2 Uninstalling Atomix - PASS (tick)
  • 4.3 Uninstalling ONOS package - PASS (tick)
  • 4.4 Building ONOS Docker image - PASS (tick)
  • 4.5 Create Cluster Config - PASS (tick)
  • 4.6 Installing Atomix via docker containers - PASS (tick)
  • 4.7 Installing ONOS via docker containers - PASS (tick)
  • 4.8 Set up ONOS secure SSH - PASS (tick)
  • 4.9 Starting ONOS CLI sessions - PASS (tick)
  • 4.10 Checking ONOS nodes - PASS (tick)
  • 4.11 Checking ONOS applications - PASS (tick)
  • 4.12 Set logging levels - PASS (tick)
  • 4.13 Set ONOS configurations - PASS (tick)
  • 4.14 Starting Mininet Topology - PASS (tick)
  • 4.15 Configure switches in ONOS - PASS (tick)
  • 4.16 Check number of topology elements - FAIL (error)
    • Unexpected number of links, switches, and/or controllers: The number of links, switches, nodes, and SCCs does not match what was expected
    • ONOS sees 4 devices (4 expected) and 0 links (8 expected) and 3 controllers (3 expected) and 4 SCCs (1 expected)
  • 4.17 Check whether the flow count is >= 116 - FAIL (error)
    • Flow count looks wrong; found 6, expecting at least 116
  • 4.18 Check whether all flow status are ADDED - FAIL (error)
    • Flow status is wrong!
  • 4.19 Verify full connectivity for [u'h1', u'h2', u'h3', u'h4'] with tag CASE3 - FAIL (error)
    • IP connectivity failed
  • 4.20 Verify full connectivity for [u'olt10', u'vsg10'] with tag CASE3 - FAIL (error)
    • IP connectivity failed
  • 4.21 Verify full connectivity for [u'olt5', u'vsg5'] with tag CASE3 - FAIL (error)
    • IP connectivity failed
  • 4.22 Kill link between spine101 and leaf2 - PASS (tick)
  • 4.23 Checking topology after link down - FAIL (error)
    • Topology after link down is incorrect
  • 4.24 Verify full connectivity for [u'h1', u'h2', u'h3', u'h4'] with tag CASE3_Failure - FAIL (error)
    • IP connectivity failed
  • 4.25 Verify full connectivity for [u'olt10', u'vsg10'] with tag CASE3_Failure - FAIL (error)
    • IP connectivity failed
  • 4.26 Verify full connectivity for [u'olt5', u'vsg5'] with tag CASE3_Failure - FAIL (error)
    • IP connectivity failed
  • 4.27 Restore link between spine101 and leaf2 - FAIL (error)
    • Failed to bring link up
  • 4.28 Check whether the flow count is >= 116 - FAIL (error)
    • Flow count looks wrong; found 6, expecting at least 116
  • 4.29 Check whether all flow status are ADDED - FAIL (error)
    • Flow status is wrong!
  • 4.30 Verify full connectivity for [u'h1', u'h2', u'h3', u'h4'] with tag CASE3_Recovery - FAIL (error)
    • IP connectivity failed
  • 4.31 Verify full connectivity for [u'olt10', u'vsg10'] with tag CASE3_Recovery - FAIL (error)
    • IP connectivity failed
  • 4.32 Verify full connectivity for [u'olt5', u'vsg5'] with tag CASE3_Recovery - FAIL (error)
    • IP connectivity failed
  • 4.33 Check number of topology elements - FAIL (error)
    • Unexpected number of links, switches, and/or controllers: The number of links, switches, nodes, and SCCs does not match what was expected
    • ONOS sees 4 devices (4 expected) and 0 links (8 expected) and 3 controllers (3 expected) and 4 SCCs (1 expected)
  • 4.34 Stopping Mininet - PASS (tick)
  • 4.35 Copying karaf logs - PASS (tick)

Case 5: Bridging and Routing Link Failure test with 4x4 dual-homed leaf-spine topology and 3 Onos - FAIL

  • 5.1 Apply cell to environment - PASS (tick)
  • 5.2 Uninstalling Atomix - PASS (tick)
  • 5.3 Uninstalling ONOS package - PASS (tick)
  • 5.4 Building ONOS Docker image - PASS (tick)
  • 5.5 Create Cluster Config - PASS (tick)
  • 5.6 Installing Atomix via docker containers - PASS (tick)
  • 5.7 Installing ONOS via docker containers - PASS (tick)
  • 5.8 Set up ONOS secure SSH - PASS (tick)
  • 5.9 Starting ONOS CLI sessions - PASS (tick)
  • 5.10 Checking ONOS nodes - PASS (tick)
  • 5.11 Checking ONOS applications - PASS (tick)
  • 5.12 Set logging levels - PASS (tick)
  • 5.13 Set ONOS configurations - PASS (tick)
  • 5.14 Stopping Mininet - PASS (tick)
  • 5.15 Copying karaf logs - PASS (tick)
    • Skipping the rest of this case. 'mininetArgs'
  • No labels