FUNCintentRest at 22 May 2016 20:15:27

commit f96f7cf7294f08af290f09466981ed01a5fe1071 (HEAD, origin/master, origin/HEAD, master)
Author: HIGUCHI Yuta [y-higuchi@ak.jp.nec.com]
AuthorDate: Sat May 21 12:32:31 2016 -0700
Commit: Gerrit Code Review [gerrit@onlab.us]
CommitDate: Sun May 22 20:22:40 2016 +0000

Remove unnecessary delay in CounterTest.

Case 1: Constructing test variables and building ONOS package - PASS

This test case is mainly for loading from params file, and pull and build the latest ONOS package

  • 1.1 Constructing test variables - PASS (tick)

Case 2: Starting up 1 node(s) ONOS cluster - PASS

Set up ONOS with 1 node(s) ONOS cluster

  • 2.1 Uninstalling ONOS package - PASS (tick)
  • 2.2 Apply cell to environment - PASS (tick)
  • 2.3 Creating ONOS package - PASS (tick)
  • 2.4 Installing ONOS package - PASS (tick)
  • 2.5 Starting ONOS service - PASS (tick)
  • 2.6 Start ONOS cli - PASS (tick)

Case 10: Start Mininet topology with OF 1.0 switches - PASS

Start mininet topology with OF 1.0 switches to test intents, exits out if topology did not start correctly

  • 10.1 Starting Mininet topology with OF 1.0 switches - PASS (tick)

Case 12: Assign switches to controllers - PASS

Assign OF 1.0 switches to ONOS nodes

  • 12.1 Assigning switches to controllers - PASS (tick)

Case 13: Create scapy components - PASS

  • 13.1 Create scapy components - No Result (warning)
  • 13.2 Start scapy components - PASS (tick)

Case 15: Discover all hosts using scapy - PASS

  • 15.1 Send packets from each host to the first host and confirm onos discovery - PASS (tick)
  • 15.2 Populate hostsData - PASS (tick)

Case 16: Balance mastership of switches - PASS

  • 16.1 Balancing mastership of switches - PASS (tick)

Case 1000: Host Intents Test - 1 NODE(S) - OF 1.0 - Using Flow Rules - PASS

This test case tests Host intents using 1 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.0 OVS running in Mininet and compile intents using Flow Rules

  • 1000.1 IPV4: Add and test host intents between h1 and h9 - PASS (tick)
  • 1000.2 DUALSTACK1: Add host intents between h3 and h11 - PASS (tick)
  • 1000.3 DUALSTACK2: Add host intents between h1 and h11 - PASS (tick)
  • 1000.4 1HOP: Add host intents between h1 and h3 - PASS (tick)
  • 1000.5 VLAN1: Add vlan host intents between h4 and h12 - PASS (tick)
  • 1000.6 Confirm that ONOS leadership is unchanged - PASS (tick)

Case 2000: Point Intents Test - 1 NODE(S) - OF 1.0 - Using Flow Rules - PASS

This test case will test point to point intents using 1 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.0 OVS running in Mininet and compile intents using Flow Rules

  • 2000.1 NOOPTION: Add point intents between h1 and h9 - PASS (tick)
  • 2000.2 IPV4: Add point intents between h1 and h9 - PASS (tick)
  • 2000.3 IPV4_2: Add point intents between h1 and h9 - PASS (tick)
  • 2000.4 SDNIP-ICMP: Add point intents between h1 and h9 - PASS (tick)
  • 2000.5 SDNIP-TCP: Add point intents between h1 and h9 - PASS (tick)
  • 2000.6 DUALSTACK1: Add point intents between h3 and h11 - PASS (tick)
  • 2000.7 VLAN: Add point intents between h5 and h21 - PASS (tick)
  • 2000.8 1HOP: Add point intents between h1 and h3 - PASS (tick)

Case 5000: Test host mobility with host intents - PASS

  • 5000.1 Testing host mobility by moving h1 from s5 to s6 - PASS (tick)
  • 5000.2 IPV4: Add host intents between h1 and h9 - PASS (tick)

Case 18: Stop Mininet and Scapy - PASS

Stopping the current mininet topology to start up fresh

  • 18.1 Stopping and Removing Scapy Host Components - PASS (tick)
  • 18.2 Stopping Mininet Topology - PASS (tick)

Case 2: Starting up 3 node(s) ONOS cluster - PASS

Set up ONOS with 3 node(s) ONOS cluster

  • 2.1 Uninstalling ONOS package - PASS (tick)
  • 2.2 Apply cell to environment - PASS (tick)
  • 2.3 Creating ONOS package - PASS (tick)
  • 2.4 Installing ONOS package - PASS (tick)
  • 2.5 Starting ONOS service - PASS (tick)
  • 2.6 Start ONOS cli - PASS (tick)

Case 10: Start Mininet topology with OF 1.0 switches - PASS

Start mininet topology with OF 1.0 switches to test intents, exits out if topology did not start correctly

  • 10.1 Starting Mininet topology with OF 1.0 switches - PASS (tick)

Case 12: Assign switches to controllers - PASS

Assign OF 1.0 switches to ONOS nodes

  • 12.1 Assigning switches to controllers - PASS (tick)

Case 13: Create scapy components - PASS

  • 13.1 Create scapy components - No Result (warning)
  • 13.2 Start scapy components - PASS (tick)

Case 15: Discover all hosts using scapy - PASS

  • 15.1 Send packets from each host to the first host and confirm onos discovery - PASS (tick)
  • 15.2 Populate hostsData - PASS (tick)

Case 16: Balance mastership of switches - PASS

  • 16.1 Balancing mastership of switches - PASS (tick)

Case 1000: Host Intents Test - 3 NODE(S) - OF 1.0 - Using Flow Rules - PASS

This test case tests Host intents using 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.0 OVS running in Mininet and compile intents using Flow Rules

  • 1000.1 IPV4: Add and test host intents between h1 and h9 - PASS (tick)
  • 1000.2 DUALSTACK1: Add host intents between h3 and h11 - PASS (tick)
  • 1000.3 DUALSTACK2: Add host intents between h1 and h11 - PASS (tick)
  • 1000.4 1HOP: Add host intents between h1 and h3 - PASS (tick)
  • 1000.5 VLAN1: Add vlan host intents between h4 and h12 - PASS (tick)
  • 1000.6 Confirm that ONOS leadership is unchanged - PASS (tick)

Case 2000: Point Intents Test - 3 NODE(S) - OF 1.0 - Using Flow Rules - PASS

This test case will test point to point intents using 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.0 OVS running in Mininet and compile intents using Flow Rules

  • 2000.1 NOOPTION: Add point intents between h1 and h9 - PASS (tick)
  • 2000.2 IPV4: Add point intents between h1 and h9 - PASS (tick)
  • 2000.3 IPV4_2: Add point intents between h1 and h9 - PASS (tick)
  • 2000.4 SDNIP-ICMP: Add point intents between h1 and h9 - PASS (tick)
  • 2000.5 SDNIP-TCP: Add point intents between h1 and h9 - PASS (tick)
  • 2000.6 DUALSTACK1: Add point intents between h3 and h11 - PASS (tick)
  • 2000.7 VLAN: Add point intents between h5 and h21 - PASS (tick)
  • 2000.8 1HOP: Add point intents between h1 and h3 - PASS (tick)

Case 5000: Test host mobility with host intents - PASS

  • 5000.1 Testing host mobility by moving h1 from s5 to s6 - PASS (tick)
  • 5000.2 IPV4: Add host intents between h1 and h9 - PASS (tick)

Case 18: Stop Mininet and Scapy - PASS

Stopping the current mininet topology to start up fresh

  • 18.1 Stopping and Removing Scapy Host Components - PASS (tick)
  • 18.2 Stopping Mininet Topology - PASS (tick)

Case 2: Starting up 1 node(s) ONOS cluster - PASS

Set up ONOS with 1 node(s) ONOS cluster

  • 2.1 Uninstalling ONOS package - PASS (tick)
  • 2.2 Apply cell to environment - PASS (tick)
  • 2.3 Creating ONOS package - PASS (tick)
  • 2.4 Installing ONOS package - PASS (tick)
  • 2.5 Starting ONOS service - PASS (tick)
  • 2.6 Start ONOS cli - PASS (tick)

Case 10: Start Mininet topology with OF 1.0 switches - PASS

Start mininet topology with OF 1.0 switches to test intents, exits out if topology did not start correctly

  • 10.1 Starting Mininet topology with OF 1.0 switches - PASS (tick)

Case 12: Assign switches to controllers - PASS

Assign OF 1.0 switches to ONOS nodes

  • 12.1 Assigning switches to controllers - PASS (tick)

Case 13: Create scapy components - PASS

  • 13.1 Create scapy components - No Result (warning)
  • 13.2 Start scapy components - PASS (tick)

Case 15: Discover all hosts using scapy - PASS

  • 15.1 Send packets from each host to the first host and confirm onos discovery - PASS (tick)
  • 15.2 Populate hostsData - PASS (tick)

Case 16: Balance mastership of switches - PASS

  • 16.1 Balancing mastership of switches - PASS (tick)

Case 17: Enable intent compilation using Flow Objectives - PASS

  • 17.1 Enabling Flow Objectives - PASS (tick)

Case 1000: Host Intents Test - 1 NODE(S) - OF 1.0 - Using Flow Objectives - FAIL

This test case tests Host intents using 1 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.0 OVS running in Mininet and compile intents using Flow Objectives

  • 1000.1 IPV4: Add and test host intents between h1 and h9 - FAIL (error)
    • Assertion result for IPV4 host intent with mac addresses
  • 1000.2 DUALSTACK1: Add host intents between h3 and h11 - FAIL (error)
    • Assertion Result for dualstack IPV4 with MAC addresses
  • 1000.3 DUALSTACK2: Add host intents between h1 and h11 - FAIL (error)
    • Assertion Result for dualstack2 host intent
  • 1000.4 1HOP: Add host intents between h1 and h3 - FAIL (error)
    • Assertion Result for 1HOP for IPV4 same switch
  • 1000.5 VLAN1: Add vlan host intents between h4 and h12 - FAIL (error)
    • Assertion Result vlan IPV4
  • 1000.6 Confirm that ONOS leadership is unchanged - FAIL (error)
    • ONOS Leader Mismatch

Case 2000: Point Intents Test - 1 NODE(S) - OF 1.0 - Using Flow Objectives - FAIL

This test case will test point to point intents using 1 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.0 OVS running in Mininet and compile intents using Flow Objectives

  • 2000.1 NOOPTION: Add point intents between h1 and h9 - FAIL (error)
    • Assertion Result for NOOPTION point intent
  • 2000.2 IPV4: Add point intents between h1 and h9 - FAIL (error)
    • Assertion Result for IPV4 point intent
  • 2000.3 IPV4_2: Add point intents between h1 and h9 - FAIL (error)
    • Assertion Result for IPV4 no mac address point intents
  • 2000.4 SDNIP-ICMP: Add point intents between h1 and h9 - FAIL (error)
    • Assertion Result for SDNIP-ICMP IPV4 using TCP point intents
  • 2000.5 SDNIP-TCP: Add point intents between h1 and h9 - FAIL (error)
    • Assertion Result for SDNIP-TCP IPV4 using ICMP point intents
  • 2000.6 DUALSTACK1: Add point intents between h3 and h11 - FAIL (error)
    • Assertion Result for Dualstack1 IPV4 with mac address point intents
  • 2000.7 VLAN: Add point intents between h5 and h21 - FAIL (error)
    • Assertion Result for VLAN IPV4 with mac address point intents
  • 2000.8 1HOP: Add point intents between h1 and h3 - FAIL (error)
    • Assertion Result for 1HOP IPV4 with no mac address point intents

Case 5000: Test host mobility with host intents - FAIL

  • 5000.1 Testing host mobility by moving h1 from s5 to s6 - PASS (tick)
  • 5000.2 IPV4: Add host intents between h1 and h9 - FAIL (error)
    • Assert result for IPV4 host intent between h1, moved, and h9

Case 18: Stop Mininet and Scapy - FAIL

Stopping the current mininet topology to start up fresh

  • 18.1 Stopping and Removing Scapy Host Components - PASS (tick)
  • 18.2 Stopping Mininet Topology - FAIL (error)
    • Failed to stop mininet

Case 2: Starting up 3 node(s) ONOS cluster - PASS

Set up ONOS with 3 node(s) ONOS cluster

  • 2.1 Uninstalling ONOS package - PASS (tick)
  • 2.2 Apply cell to environment - PASS (tick)
  • 2.3 Creating ONOS package - PASS (tick)
  • 2.4 Installing ONOS package - PASS (tick)
  • 2.5 Starting ONOS service - PASS (tick)
  • 2.6 Start ONOS cli - PASS (tick)

Case 10: Start Mininet topology with OF 1.0 switches - PASS

Start mininet topology with OF 1.0 switches to test intents, exits out if topology did not start correctly

  • 10.1 Starting Mininet topology with OF 1.0 switches - PASS (tick)

Case 12: Assign switches to controllers - PASS

Assign OF 1.0 switches to ONOS nodes

  • 12.1 Assigning switches to controllers - PASS (tick)

Case 13: Create scapy components - PASS

  • 13.1 Create scapy components - No Result (warning)
  • 13.2 Start scapy components - PASS (tick)

Case 15: Discover all hosts using scapy - PASS

  • 15.1 Send packets from each host to the first host and confirm onos discovery - PASS (tick)
  • 15.2 Populate hostsData - PASS (tick)

Case 16: Balance mastership of switches - PASS

  • 16.1 Balancing mastership of switches - PASS (tick)

Case 17: Enable intent compilation using Flow Objectives - PASS

  • 17.1 Enabling Flow Objectives - PASS (tick)

Case 1000: Host Intents Test - 3 NODE(S) - OF 1.0 - Using Flow Objectives - FAIL

This test case tests Host intents using 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.0 OVS running in Mininet and compile intents using Flow Objectives

  • 1000.1 IPV4: Add and test host intents between h1 and h9 - FAIL (error)
    • Assertion result for IPV4 host intent with mac addresses
  • 1000.2 DUALSTACK1: Add host intents between h3 and h11 - FAIL (error)
    • Assertion Result for dualstack IPV4 with MAC addresses
  • 1000.3 DUALSTACK2: Add host intents between h1 and h11 - FAIL (error)
    • Assertion Result for dualstack2 host intent
  • 1000.4 1HOP: Add host intents between h1 and h3 - FAIL (error)
    • Assertion Result for 1HOP for IPV4 same switch
  • 1000.5 VLAN1: Add vlan host intents between h4 and h12 - FAIL (error)
    • Assertion Result vlan IPV4
  • 1000.6 Confirm that ONOS leadership is unchanged - FAIL (error)
    • ONOS Leader Mismatch

Case 2000: Point Intents Test - 3 NODE(S) - OF 1.0 - Using Flow Objectives - FAIL

This test case will test point to point intents using 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.0 OVS running in Mininet and compile intents using Flow Objectives

  • 2000.1 NOOPTION: Add point intents between h1 and h9 - FAIL (error)
    • Assertion Result for NOOPTION point intent
  • 2000.2 IPV4: Add point intents between h1 and h9 - FAIL (error)
    • Assertion Result for IPV4 point intent
  • 2000.3 IPV4_2: Add point intents between h1 and h9 - FAIL (error)
    • Assertion Result for IPV4 no mac address point intents
  • 2000.4 SDNIP-ICMP: Add point intents between h1 and h9 - FAIL (error)
    • Assertion Result for SDNIP-ICMP IPV4 using TCP point intents
  • 2000.5 SDNIP-TCP: Add point intents between h1 and h9 - FAIL (error)
    • Assertion Result for SDNIP-TCP IPV4 using ICMP point intents
  • 2000.6 DUALSTACK1: Add point intents between h3 and h11 - FAIL (error)
    • Assertion Result for Dualstack1 IPV4 with mac address point intents
  • 2000.7 VLAN: Add point intents between h5 and h21 - FAIL (error)
    • Assertion Result for VLAN IPV4 with mac address point intents
  • 2000.8 1HOP: Add point intents between h1 and h3 - FAIL (error)
    • Assertion Result for 1HOP IPV4 with no mac address point intents

Case 5000: Test host mobility with host intents - FAIL

  • 5000.1 Testing host mobility by moving h1 from s5 to s6 - PASS (tick)
  • 5000.2 IPV4: Add host intents between h1 and h9 - FAIL (error)
    • Assert result for IPV4 host intent between h1, moved, and h9

Case 18: Stop Mininet and Scapy - FAIL

Stopping the current mininet topology to start up fresh

  • 18.1 Stopping and Removing Scapy Host Components - PASS (tick)
  • 18.2 Stopping Mininet Topology - FAIL (error)
    • Failed to stop mininet

Case 2: Starting up 1 node(s) ONOS cluster - PASS

Set up ONOS with 1 node(s) ONOS cluster

  • 2.1 Uninstalling ONOS package - PASS (tick)
  • 2.2 Apply cell to environment - PASS (tick)
  • 2.3 Creating ONOS package - PASS (tick)
  • 2.4 Installing ONOS package - PASS (tick)
  • 2.5 Starting ONOS service - PASS (tick)
  • 2.6 Start ONOS cli - PASS (tick)

Case 11: Start Mininet topology with OF 1.3 switches - PASS

Start mininet topology with OF 1.3 switches to test intents, exits out if topology did not start correctly

  • 11.1 Starting Mininet topology with OF 1.3 switches - PASS (tick)

Case 12: Assign switches to controllers - PASS

Assign OF 1.3 switches to ONOS nodes

  • 12.1 Assigning switches to controllers - PASS (tick)

Case 13: Create scapy components - PASS

  • 13.1 Create scapy components - No Result (warning)
  • 13.2 Start scapy components - PASS (tick)

Case 15: Discover all hosts using scapy - PASS

  • 15.1 Send packets from each host to the first host and confirm onos discovery - PASS (tick)
  • 15.2 Populate hostsData - PASS (tick)

Case 16: Balance mastership of switches - PASS

  • 16.1 Balancing mastership of switches - PASS (tick)

Case 1000: Host Intents Test - 1 NODE(S) - OF 1.3 - Using Flow Rules - PASS

This test case tests Host intents using 1 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet and compile intents using Flow Rules

  • 1000.1 IPV4: Add and test host intents between h1 and h9 - PASS (tick)
  • 1000.2 DUALSTACK1: Add host intents between h3 and h11 - PASS (tick)
  • 1000.3 DUALSTACK2: Add host intents between h1 and h11 - PASS (tick)
  • 1000.4 1HOP: Add host intents between h1 and h3 - PASS (tick)
  • 1000.5 VLAN1: Add vlan host intents between h4 and h12 - PASS (tick)
  • 1000.6 Confirm that ONOS leadership is unchanged - PASS (tick)

Case 2000: Point Intents Test - 1 NODE(S) - OF 1.3 - Using Flow Rules - PASS

This test case will test point to point intents using 1 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet and compile intents using Flow Rules

  • 2000.1 NOOPTION: Add point intents between h1 and h9 - PASS (tick)
  • 2000.2 IPV4: Add point intents between h1 and h9 - PASS (tick)
  • 2000.3 IPV4_2: Add point intents between h1 and h9 - PASS (tick)
  • 2000.4 SDNIP-ICMP: Add point intents between h1 and h9 - PASS (tick)
  • 2000.5 SDNIP-TCP: Add point intents between h1 and h9 - PASS (tick)
  • 2000.6 DUALSTACK1: Add point intents between h3 and h11 - PASS (tick)
  • 2000.7 VLAN: Add point intents between h5 and h21 - PASS (tick)
  • 2000.8 1HOP: Add point intents between h1 and h3 - PASS (tick)

Case 5000: Test host mobility with host intents - PASS

  • 5000.1 Testing host mobility by moving h1 from s5 to s6 - PASS (tick)
  • 5000.2 IPV4: Add host intents between h1 and h9 - PASS (tick)

Case 18: Stop Mininet and Scapy - PASS

Stopping the current mininet topology to start up fresh

  • 18.1 Stopping and Removing Scapy Host Components - PASS (tick)
  • 18.2 Stopping Mininet Topology - PASS (tick)

Case 2: Starting up 3 node(s) ONOS cluster - PASS

Set up ONOS with 3 node(s) ONOS cluster

  • 2.1 Uninstalling ONOS package - PASS (tick)
  • 2.2 Apply cell to environment - PASS (tick)
  • 2.3 Creating ONOS package - PASS (tick)
  • 2.4 Installing ONOS package - PASS (tick)
  • 2.5 Starting ONOS service - PASS (tick)
  • 2.6 Start ONOS cli - PASS (tick)

Case 11: Start Mininet topology with OF 1.3 switches - PASS

Start mininet topology with OF 1.3 switches to test intents, exits out if topology did not start correctly

  • 11.1 Starting Mininet topology with OF 1.3 switches - PASS (tick)

Case 12: Assign switches to controllers - PASS

Assign OF 1.3 switches to ONOS nodes

  • 12.1 Assigning switches to controllers - PASS (tick)

Case 13: Create scapy components - PASS

  • 13.1 Create scapy components - No Result (warning)
  • 13.2 Start scapy components - PASS (tick)

Case 15: Discover all hosts using scapy - PASS

  • 15.1 Send packets from each host to the first host and confirm onos discovery - PASS (tick)
  • 15.2 Populate hostsData - PASS (tick)

Case 16: Balance mastership of switches - PASS

  • 16.1 Balancing mastership of switches - PASS (tick)

Case 1000: Host Intents Test - 3 NODE(S) - OF 1.3 - Using Flow Rules - PASS

This test case tests Host intents using 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet and compile intents using Flow Rules

  • 1000.1 IPV4: Add and test host intents between h1 and h9 - PASS (tick)
  • 1000.2 DUALSTACK1: Add host intents between h3 and h11 - PASS (tick)
  • 1000.3 DUALSTACK2: Add host intents between h1 and h11 - PASS (tick)
  • 1000.4 1HOP: Add host intents between h1 and h3 - PASS (tick)
  • 1000.5 VLAN1: Add vlan host intents between h4 and h12 - PASS (tick)
  • 1000.6 Confirm that ONOS leadership is unchanged - PASS (tick)

Case 2000: Point Intents Test - 3 NODE(S) - OF 1.3 - Using Flow Rules - PASS

This test case will test point to point intents using 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet and compile intents using Flow Rules

  • 2000.1 NOOPTION: Add point intents between h1 and h9 - PASS (tick)
  • 2000.2 IPV4: Add point intents between h1 and h9 - PASS (tick)
  • 2000.3 IPV4_2: Add point intents between h1 and h9 - PASS (tick)
  • 2000.4 SDNIP-ICMP: Add point intents between h1 and h9 - PASS (tick)
  • 2000.5 SDNIP-TCP: Add point intents between h1 and h9 - PASS (tick)
  • 2000.6 DUALSTACK1: Add point intents between h3 and h11 - PASS (tick)
  • 2000.7 VLAN: Add point intents between h5 and h21 - PASS (tick)
  • 2000.8 1HOP: Add point intents between h1 and h3 - PASS (tick)

Case 5000: Test host mobility with host intents - PASS

  • 5000.1 Testing host mobility by moving h1 from s5 to s6 - PASS (tick)
  • 5000.2 IPV4: Add host intents between h1 and h9 - PASS (tick)

Case 18: Stop Mininet and Scapy - PASS

Stopping the current mininet topology to start up fresh

  • 18.1 Stopping and Removing Scapy Host Components - PASS (tick)
  • 18.2 Stopping Mininet Topology - PASS (tick)

Case 2: Starting up 1 node(s) ONOS cluster - PASS

Set up ONOS with 1 node(s) ONOS cluster

  • 2.1 Uninstalling ONOS package - PASS (tick)
  • 2.2 Apply cell to environment - PASS (tick)
  • 2.3 Creating ONOS package - PASS (tick)
  • 2.4 Installing ONOS package - PASS (tick)
  • 2.5 Starting ONOS service - PASS (tick)
  • 2.6 Start ONOS cli - PASS (tick)

Case 11: Start Mininet topology with OF 1.3 switches - PASS

Start mininet topology with OF 1.3 switches to test intents, exits out if topology did not start correctly

  • 11.1 Starting Mininet topology with OF 1.3 switches - PASS (tick)

Case 12: Assign switches to controllers - PASS

Assign OF 1.3 switches to ONOS nodes

  • 12.1 Assigning switches to controllers - PASS (tick)

Case 13: Create scapy components - PASS

  • 13.1 Create scapy components - No Result (warning)
  • 13.2 Start scapy components - PASS (tick)

Case 15: Discover all hosts using scapy - PASS

  • 15.1 Send packets from each host to the first host and confirm onos discovery - PASS (tick)
  • 15.2 Populate hostsData - PASS (tick)

Case 16: Balance mastership of switches - PASS

  • 16.1 Balancing mastership of switches - PASS (tick)

Case 17: Enable intent compilation using Flow Objectives - PASS

  • 17.1 Enabling Flow Objectives - PASS (tick)

Case 1000: Host Intents Test - 1 NODE(S) - OF 1.3 - Using Flow Objectives - FAIL

This test case tests Host intents using 1 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet and compile intents using Flow Objectives

  • 1000.1 IPV4: Add and test host intents between h1 and h9 - FAIL (error)
    • Assertion result for IPV4 host intent with mac addresses
  • 1000.2 DUALSTACK1: Add host intents between h3 and h11 - FAIL (error)
    • Assertion Result for dualstack IPV4 with MAC addresses
  • 1000.3 DUALSTACK2: Add host intents between h1 and h11 - FAIL (error)
    • Assertion Result for dualstack2 host intent
  • 1000.4 1HOP: Add host intents between h1 and h3 - FAIL (error)
    • Assertion Result for 1HOP for IPV4 same switch
  • 1000.5 VLAN1: Add vlan host intents between h4 and h12 - FAIL (error)
    • Assertion Result vlan IPV4
  • 1000.6 Confirm that ONOS leadership is unchanged - FAIL (error)
    • ONOS Leader Mismatch

Case 2000: Point Intents Test - 1 NODE(S) - OF 1.3 - Using Flow Objectives - FAIL

This test case will test point to point intents using 1 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet and compile intents using Flow Objectives

  • 2000.1 NOOPTION: Add point intents between h1 and h9 - FAIL (error)
    • Assertion Result for NOOPTION point intent
  • 2000.2 IPV4: Add point intents between h1 and h9 - FAIL (error)
    • Assertion Result for IPV4 point intent
  • 2000.3 IPV4_2: Add point intents between h1 and h9 - FAIL (error)
    • Assertion Result for IPV4 no mac address point intents
  • 2000.4 SDNIP-ICMP: Add point intents between h1 and h9 - FAIL (error)
    • Assertion Result for SDNIP-ICMP IPV4 using TCP point intents
  • 2000.5 SDNIP-TCP: Add point intents between h1 and h9 - FAIL (error)
    • Assertion Result for SDNIP-TCP IPV4 using ICMP point intents
  • 2000.6 DUALSTACK1: Add point intents between h3 and h11 - FAIL (error)
    • Assertion Result for Dualstack1 IPV4 with mac address point intents
  • 2000.7 VLAN: Add point intents between h5 and h21 - FAIL (error)
    • Assertion Result for VLAN IPV4 with mac address point intents
  • 2000.8 1HOP: Add point intents between h1 and h3 - FAIL (error)
    • Assertion Result for 1HOP IPV4 with no mac address point intents

Case 5000: Test host mobility with host intents - FAIL

  • 5000.1 Testing host mobility by moving h1 from s5 to s6 - PASS (tick)
  • 5000.2 IPV4: Add host intents between h1 and h9 - FAIL (error)
    • Assert result for IPV4 host intent between h1, moved, and h9

Case 18: Stop Mininet and Scapy - FAIL

Stopping the current mininet topology to start up fresh

  • 18.1 Stopping and Removing Scapy Host Components - PASS (tick)
  • 18.2 Stopping Mininet Topology - FAIL (error)
    • Failed to stop mininet

Case 2: Starting up 3 node(s) ONOS cluster - PASS

Set up ONOS with 3 node(s) ONOS cluster

  • 2.1 Uninstalling ONOS package - PASS (tick)
  • 2.2 Apply cell to environment - PASS (tick)
  • 2.3 Creating ONOS package - PASS (tick)
  • 2.4 Installing ONOS package - PASS (tick)
  • 2.5 Starting ONOS service - PASS (tick)
  • 2.6 Start ONOS cli - PASS (tick)

Case 11: Start Mininet topology with OF 1.3 switches - PASS

Start mininet topology with OF 1.3 switches to test intents, exits out if topology did not start correctly

  • 11.1 Starting Mininet topology with OF 1.3 switches - PASS (tick)

Case 12: Assign switches to controllers - PASS

Assign OF 1.3 switches to ONOS nodes

  • 12.1 Assigning switches to controllers - PASS (tick)

Case 13: Create scapy components - PASS

  • 13.1 Create scapy components - No Result (warning)
  • 13.2 Start scapy components - PASS (tick)

Case 15: Discover all hosts using scapy - PASS

  • 15.1 Send packets from each host to the first host and confirm onos discovery - PASS (tick)
  • 15.2 Populate hostsData - PASS (tick)

Case 16: Balance mastership of switches - PASS

  • 16.1 Balancing mastership of switches - PASS (tick)

Case 17: Enable intent compilation using Flow Objectives - PASS

  • 17.1 Enabling Flow Objectives - PASS (tick)

Case 1000: Host Intents Test - 3 NODE(S) - OF 1.3 - Using Flow Objectives - FAIL

This test case tests Host intents using 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet and compile intents using Flow Objectives

  • 1000.1 IPV4: Add and test host intents between h1 and h9 - FAIL (error)
    • Assertion result for IPV4 host intent with mac addresses
  • 1000.2 DUALSTACK1: Add host intents between h3 and h11 - FAIL (error)
    • Assertion Result for dualstack IPV4 with MAC addresses
  • 1000.3 DUALSTACK2: Add host intents between h1 and h11 - FAIL (error)
    • Assertion Result for dualstack2 host intent
  • 1000.4 1HOP: Add host intents between h1 and h3 - FAIL (error)
    • Assertion Result for 1HOP for IPV4 same switch
  • 1000.5 VLAN1: Add vlan host intents between h4 and h12 - FAIL (error)
    • Assertion Result vlan IPV4
  • 1000.6 Confirm that ONOS leadership is unchanged - FAIL (error)
    • ONOS Leader Mismatch

Case 2000: Point Intents Test - 3 NODE(S) - OF 1.3 - Using Flow Objectives - FAIL

This test case will test point to point intents using 3 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet and compile intents using Flow Objectives

  • 2000.1 NOOPTION: Add point intents between h1 and h9 - FAIL (error)
    • Assertion Result for NOOPTION point intent
  • 2000.2 IPV4: Add point intents between h1 and h9 - FAIL (error)
    • Assertion Result for IPV4 point intent
  • 2000.3 IPV4_2: Add point intents between h1 and h9 - FAIL (error)
    • Assertion Result for IPV4 no mac address point intents
  • 2000.4 SDNIP-ICMP: Add point intents between h1 and h9 - FAIL (error)
    • Assertion Result for SDNIP-ICMP IPV4 using TCP point intents
  • 2000.5 SDNIP-TCP: Add point intents between h1 and h9 - FAIL (error)
    • Assertion Result for SDNIP-TCP IPV4 using ICMP point intents
  • 2000.6 DUALSTACK1: Add point intents between h3 and h11 - FAIL (error)
    • Assertion Result for Dualstack1 IPV4 with mac address point intents
  • 2000.7 VLAN: Add point intents between h5 and h21 - FAIL (error)
    • Assertion Result for VLAN IPV4 with mac address point intents
  • 2000.8 1HOP: Add point intents between h1 and h3 - FAIL (error)
    • Assertion Result for 1HOP IPV4 with no mac address point intents

Case 5000: Test host mobility with host intents - FAIL

  • 5000.1 Testing host mobility by moving h1 from s5 to s6 - PASS (tick)
  • 5000.2 IPV4: Add host intents between h1 and h9 - FAIL (error)
    • Assert result for IPV4 host intent between h1, moved, and h9

Case 18: Stop Mininet and Scapy - FAIL

Stopping the current mininet topology to start up fresh

  • 18.1 Stopping and Removing Scapy Host Components - PASS (tick)
  • 18.2 Stopping Mininet Topology - FAIL (error)
    • Failed to stop mininet
  • No labels