VPLSfailsafe at 14 Apr 2020 22:52:34

<img src="https://jenkins.onosproject.org/view/QA/job/postjob-BM/lastSuccessfulBuild/artifact/VPLSfailsafe_master_20-builds_graph.jpg", alt="VPLSfailsafe", style="width:525px;height:350px;border:0">
commit 3dd062fb1483f970c7fcb1eb3ae2950bbb335023 (HEAD -] master, origin/master, origin/HEAD)
Author: Sean Condon [sean@opennetworking.org]
AuthorDate: Tue Apr 14 09:25:00 2020 +0100
Commit: Sean Condon [sean@opennetworking.org]
CommitDate: Tue Apr 14 09:29:28 2020 +0100

GUI2 Change gui2-fw-lib refs to abs paths

Case 1: Starting up 3 node(s) ONOS cluster - PASS

Set up ONOS with 3 node(s) ONOS cluster

Case 2: - PASS

Case 50: Check connectivity before running all other tests. - PASS

Case 100: Bring down one host at a time and test connectivity. - FAIL

Case 200: Bring down one switch at a time and test connectivity. - FAIL

Case 300: Stop one ONOS node at a time and test connectivity. - FAIL

Case 310: Kill one ONOS node at a time and test connectivity. - FAIL

Case 400: Bring down one link at a time and test connectivity. - FAIL