Jenkins test result for 13:15 on Jun 25, 2015.

 

Test ProdFunc

************************************

Result summary for Testcase1

This testcase is testing setting up test environment

__________________________________

Uninstalling ONOS package successful

Installing ONOS package successful

ONOS instance is up and ready

Result: Pass

Result summary for Testcase4

This testcase is testing the assignment of all the switches to all the controllers and discovering the hosts in reactive mode

__________________________________

Controller assignmnet successful

Pingall Test in reactive mode to discover the hosts successful

Result: Pass

Result summary for Testcase10

This testcase uninstalls the reactive forwarding app

__________________________________

Result: Pass

Result summary for Testcase5

This testcase is testing if all ONOS nodes are in topology sync with mininet

__________________________________

ONOS Topology matches MN Topology

Result: Pass

Result summary for Testcase6

This testcase is testing the addition of host intents and then does pingall

__________________________________

Ping between h17 and h27 failed. Making attempt number 2 in 2 seconds

Ping between h17 and h27 failed. Making attempt number 3 in 2 seconds

Ping between h17 and h27 failed. Making attempt number 4 in 2 seconds

Ping between h17 and h27 failed. Making attempt number 5 in 2 seconds

All ping attempts between h17 and h27have failed

Ping all test after Host intent addition failed.Cleaning up

Pingall Test after Host intents addition failed

Result: Failed

Result summary for Testcase7

This testscase is killing a link to ensure that link discovery is consistent

__________________________________

Killing a link to ensure that link discovery is consistent

Link Down discovered properly

Link up discovered properly

ONOS Topology matches MN Topology

Result: Pass

Result summary for Testcase8

This testcase removes any previously added intents before adding any new set of intents

__________________________________

Intent removal successful

Result: Pass

Result summary for Testcase9

This test case adds point intents and then does pingall

__________________________________

Ping between h17 and h27 failed. Making attempt number 2 in 2 seconds

Ping between h17 and h27 failed. Making attempt number 3 in 2 seconds

Ping between h17 and h27 failed. Making attempt number 4 in 2 seconds

Ping between h17 and h27 failed. Making attempt number 5 in 2 seconds

All ping attempts between h17 and h27have failed

Point intents have not ben installed correctly. Cleaning up

Point intents addition and Pingall Test NOT successful

Result: Failed

Result summary for Testcase8

This testcase removes any previously added intents before adding any new set of intents

__________________________________

Intent removal successful

Result: Pass

Result summary for Testcase11

This testcase moves a host from one switch to another to addpoint intents between them and then perform ping

__________________________________

Point intents for hosts on same devicesinstalled correctly. Cleaning up

Result: Pass

Result summary for Testcase8

This testcase removes any previously added intents before adding any new set of intents

__________________________________

Intent removal successful

Result: Pass

Result summary for Testcase2

This testcase is testing a switch down discovery

__________________________________

Killing a switch to ensure it is discovered correctly

Deleting s28

Result: Pass

Result summary for Testcase20

This testcase exits the mininet cli and reinstallsONOS to switch over to Packet Optical topology

_____________________________________________

ONOS instance is up and ready

Result: Pass

Result summary for Testcase21

This testcase starts the packet layer topology and REST

_____________________________________________