FUNCipv6Intent at 01 Mar 2016 13:44:47
commit 4550f7b471338e5802e391137dc69c77bacba795 (HEAD, master)
Merge: 1e755cc a567124
Author: suibin [suibin@onlab.us]
AuthorDate: Tue Mar 1 10:14:42 2016 -0800
Commit: suibin [suibin@onlab.us]
CommitDate: Tue Mar 1 10:14:42 2016 -0800
Case 1: Constructing test variables and building ONOS package - PASS
This test case is mainly for loading from params file, and pull and build the latest ONOS package
- 1.1 Constructing test variables - PASS

Case 2: Starting up 1 node(s) ONOS cluster - PASS
Set up ONOS with 1 node(s) ONOS cluster
- 2.1 Apply cell to environment - PASS

- 2.2 Creating ONOS package - PASS

- 2.3 Uninstalling ONOS package - PASS

- 2.4 Installing ONOS package - PASS

- 2.5 Starting ONOS service - PASS

- 2.6 Start ONOS cli - PASS

- 2.7 Checking that ONOS is ready - PASS

- 2.8 setup the ipv6NeighbourDiscovery - PASS

Case 11: Start Mininet topology with OF 1.3 switches - PASS
Start mininet topology with OF 1.3 switches to test intents, exits out if topology did not start correctly
- 11.1 Starting Mininet topology with OF 1.3 switches - PASS

Case 12: Assign switches to controllers - PASS
Assign OF 1.3 switches to ONOS nodes
- 12.1 Assigning switches to controllers - PASS

Case 2000: Point Intents Test - 1 NODE(S) - OF 1.3 - PASS
This test case will test point to point intents using 1 node(s) cluster;
Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc;
The test will use OF 1.3 OVS running in Mininet
- 2000.1 NOOPTION: Add point intents between h1 and h9, ipv6 hosts - PASS

- 2000.2 IPV6: Add point intents between h1 and h9 - PASS

- 2000.3 IPV6_2: Add point intents between h1 and h9 - PASS

Case 14: Stop Mininet topology - PASS
Stopping the current mininet topology to start up fresh
- 14.1 Stopping Mininet Topology - PASS
