commit 444bcb6399dc6a65b01a2f9d573ea2c1766ec9d2 (HEAD, tag: 1.5.1)
Author: Brian O'Connor [bocon@onlab.us]
AuthorDate: Wed Apr 20 22:22:10 2016 -0700
Commit: Brian O'Connor [bocon@onlab.us]
CommitDate: Wed Apr 20 22:22:10 2016 -0700
Tagging 1.5.1
Case 1: Constructing test variables and building ONOS package - PASS
This test case is mainly for loading from params file, and pull and build the latest ONOS package
- 1.1 Constructing test variables - PASS
Case 2: Starting up 1 node(s) ONOS cluster - PASS
Set up ONOS with 1 node(s) ONOS cluster
- 2.1 Apply cell to environment - PASS
- 2.2 Creating ONOS package - PASS
- 2.3 Uninstalling ONOS package - PASS
- 2.4 Installing ONOS package - PASS
- 2.5 Starting ONOS service - PASS
- 2.6 Start ONOS cli - PASS
- 2.7 Checking that ONOS is ready - PASS
- 2.8 setup the ipv6NeighbourDiscovery - PASS
Case 11: Start Mininet topology with OF 1.3 switches - PASS
Start mininet topology with OF 1.3 switches to test intents, exits out if topology did not start correctly
- 11.1 Starting Mininet topology with OF 1.3 switches - PASS
Case 12: Assign switches to controllers - PASS
Assign OF 1.3 switches to ONOS nodes
- 12.1 Assigning switches to controllers - PASS
Case 2000: Point Intents Test - 1 NODE(S) - OF 1.3 - FAIL
This test case will test point to point intents using 1 node(s) cluster; Different type of hosts will be tested in each step such as IPV4, Dual stack, VLAN etc; The test will use OF 1.3 OVS running in Mininet
- 2000.1 NOOPTION: Add point intents between h1 and h9, ipv6 hosts - FAIL
- Assertion Result for NOOPTION point intent
- Initial Ping6 pair Failed
- Remove Intents Passed
- 2000.2 IPV6: Add point intents between h1 and h9 - PASS
- 2000.3 IPV6_2: Add point intents between h1 and h9 - PASS
Case 14: Stop Mininet topology - PASS
Stopping the current mininet topology to start up fresh
- 14.1 Stopping Mininet Topology - PASS