Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: Published from Jenkins build: https://jenkins.onosproject.org/job/SR-pipeline-1.14/1109/

...

HTML
<img src="https://jenkins.onosproject.org/view/QA/job/postjob-Fabric3/lastSuccessfulBuild/artifact/SRDhcprelay_onos-1.14_20-builds_graph.jpg", alt="SRDhcprelay", style="width:525px;height:350px;border:0">

commit a61ba5792d9e7a25d3446f37179fbf13ac152098 d8f04aadeac169949a3f403e7d051c8bef63d82c (HEAD -] onos-1.14, origin/onos-1.14)
Author: Ray Milkey Carmelo Cascone [ray@opennetworkingcarmelo@opennetworking.org]
AuthorDate: Tue Thu Dec 11 0813 23:4616:52 10 2018 -0800
Commit: Ray Milkey Carmelo Cascone [ray@opennetworkingcarmelo@opennetworking.org]
CommitDate: Thu Fri Dec 13 14 20:0201:28 49 2018 +0000
Fixes to allow running p4 trellis scenario
Working STC trellis-p4 scenario with connectivity test

Case 1: DHCP v4 tests with 4 clients attached to switch directly and 1 server attached to switch directly, with 3 ONOS instances - FAIL

...

  • 1.1 Constructing test variables - PASS (tick)
  • 1.2 Apply cell to environment - PASS (tick)
  • 1.3 Uninstalling Atomix - PASS (tick)
  • 1.4 Uninstalling ONOS package - PASS (tick)
  • 1.5 Creating ONOS package - PASS (tick)
  • 1.6 Installing Atomix - PASS (tick)
  • 1.7 Installing ONOS package - PASS (tick)
  • 1.8 Set up ONOS secure SSH - FAIL (error)
    • Failed to secure ssh
  • 1.9 Checking ONOS service - PASS (tick)
  • 1.10 Starting ONOS CLI sessions - PASS (tick)
  • 1.11 Checking ONOS nodes - PASS (tick)
  • 1.12 Checking ONOS applications - PASS (tick)
  • 1.13 Starting Mininet Topology - PASS (tick)
  • 1.14 Verify host IP address assignment in ONOS - PASS (tick) 1.15 Verify IP address assignment from hosts - PASS (tick)FAIL (error)
    • Verify ONOS host IP failed
  • 1.16 15 Stopping Mininet - PASS (tick) 1.17 Copying karaf logs - PASS (tick)
    • Skipping the rest of this case.

Case 2: DHCP v4 tests with 4 clients attached to switch directly and 1 server attached to switch indirectly (via gateway), with 3 ONOS instances - FAIL

...

  • 2.1 Apply cell to environment - PASS (tick)
  • 2.2 Uninstalling Atomix - PASS (tick)
  • 2.3 Uninstalling ONOS package - PASS (tick)
  • 2.4 Installing Atomix - PASS (tick)
  • 2.5 Installing ONOS package - PASS (tick)
  • 2.6 Set up ONOS secure SSH - PASS (tick)
  • 2.7 Checking ONOS service - PASS (tick)
  • 2.8 Starting ONOS CLI sessions - PASS (tick)
  • 2.9 Checking ONOS nodes - PASS (tick)
  • 2.10 Checking ONOS applications - PASS (tick)
  • 2.11 Starting Mininet Topology - PASS (tick)
  • 2.12 Verify host IP address assignment in ONOS - FAIL (error)
    • Verify ONOS host IP failed
  • 2.13 Stopping Mininet - PASS (tick)
    • Skipping the rest of this case.

Case 11: DHCP v6 tests with 4 clients attached to switch directly and 1 server attached to switch directly, with 3 ONOS instances -

...

PASS

  • 11.1 Apply cell to environment - PASS (tick)
  • 11.2 Uninstalling Atomix - PASS (tick)
  • 11.3 Uninstalling ONOS package - PASS (tick)
  • 11.4 Installing Atomix - PASS (tick)
  • 11.5 Installing ONOS package - PASS (tick)
  • 11.6 Set up ONOS secure SSH - FAIL (error)
    • Failed to secure ssh
  • PASS (tick)
  • 11.7 Checking ONOS service - PASS (tick)
  • 11.8 Starting ONOS CLI sessions - PASS (tick)
  • 11.9 Checking ONOS nodes - PASS (tick)
  • 11.10 Checking ONOS applications - PASS (tick)
  • 11.11 Starting Mininet Topology - PASS (tick)
  • 11.12 Verify host IP address assignment in ONOS - PASS (tick)
  • 11.13 Verify IP address assignment from hosts - PASS (tick)
  • 11.14 Stopping Mininet - PASS (tick)
  • 11.15 Copying karaf logs - PASS (tick)

...

  • 51.1 Apply cell to environment - PASS (tick)
  • 51.2 Uninstalling Atomix - PASS (tick)
  • 51.3 Uninstalling ONOS package - PASS (tick)
  • 51.4 Installing Atomix - PASS (tick)
  • 51.5 Installing ONOS package - PASS (tick)
  • 51.6 Set up ONOS secure SSH - FAIL (error)
    • Failed to secure ssh
  • 51.7 Checking ONOS service - PASS (tick)
  • 51.8 Starting ONOS CLI sessions - PASS (tick)
  • 51.9 Checking ONOS nodes - PASS (tick)
  • 51.10 Checking ONOS applications - PASS (tick)
  • 51.11 Starting Mininet Topology - PASS (tick)
  • 51.12 Verify host IP address assignment in ONOS - FAIL (error)
  • Verify ONOS host IP failed
  • PASS (tick)
  • 51.13 Verify IP address assignment from hosts - PASS (tick)
  • 51.13 14 Stopping Mininet - PASS (tick)
  • Skipping the rest of this case.
  • 51.15 Copying karaf logs - PASS (tick)

Case 61: DHCP v4 tests with dual-homed tagged hosts: 4 clients attached to switch directly and 1 server attached to switch directly, with 3 ONOS instances - FAIL

...

  • 71.1 Apply cell to environment - PASS (tick)
  • 71.2 Uninstalling Atomix - PASS (tick)
  • 71.3 Uninstalling ONOS package - PASS (tick)
  • 71.4 Installing Atomix - PASS (tick)
  • 71.5 Installing ONOS package - PASS (tick)
  • 71.6 Set up ONOS secure SSH - FAIL (error)
  • Failed to secure ssh
  • PASS (tick)
  • 71.7 Checking ONOS service - PASS (tick)
  • 71.8 Starting ONOS CLI sessions - PASS (tick)
  • 71.9 Checking ONOS nodes - PASS (tick)
  • 71.10 Checking ONOS applications - PASS (tick)
  • 71.11 Starting Mininet Topology - PASS (tick)
  • 71.12 Verify host IP address assignment in ONOS - FAIL (error)
    • Verify ONOS host IP failed
  • 71.13 Stopping Mininet - PASS (tick)
    • Skipping the rest of this case.