Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: Published from Jenkins build: https://jenkins.onosproject.org/job/SR-pipeline-1.14/1112/

...

HTML
<img src="https://jenkins.onosproject.org/view/QA/job/postjob-Fabric3/lastSuccessfulBuild/artifact/SRDhcprelay_onos-1.14_20-builds_graph.jpg", alt="SRDhcprelay", style="width:525px;height:350px;border:0">

commit 20f71e063b095e572b2b0b1cd6797d59feb4531d 4fc9852c50d1a84927f4a82eca9653d386feaf15 (HEAD -] onos-1.14, origin/onos-1.14)
Author: Ray Milkey Carmelo Cascone [ray@opennetworkingcarmelo@opennetworking.org]
AuthorDate: Mon Dec 17 17 09:1347:24 50 2018 -0800
Commit: Ray Milkey Carmelo Cascone [ray@opennetworkingcarmelo@opennetworking.org]
CommitDate: Mon Tue Dec 17 0918 02:1737:50 51 2018 -0800
bump up required version of bazel to 0.19+0000

Removes the gRPC channel if an exception occurs while instantiating the client

Case 1: DHCP v4 tests with 4 clients attached to switch directly and 1 server attached to switch directly, with 3 ONOS instances - PASS

...

  • 2.1 Apply cell to environment - PASS (tick)
  • 2.2 Uninstalling Atomix - PASS (tick)
  • 2.3 Uninstalling ONOS package - PASS (tick)
  • 2.4 Installing Atomix - PASS (tick)
  • 2.5 Installing ONOS package - PASS (tick)
  • 2.6 Set up ONOS secure SSH - PASS (tick)FAIL (error)
    • Failed to secure ssh
  • 2.7 Checking ONOS service - PASS (tick)
  • 2.8 Starting ONOS CLI sessions - PASS (tick)
  • 2.9 Checking ONOS nodes - PASS (tick)
  • 2.10 Checking ONOS applications - PASS (tick)
  • 2.11 Starting Mininet Topology - PASS (tick)
  • 2.12 Verify host IP address assignment in ONOS - FAIL (error)
    • Verify ONOS host IP failed
  • 2.13 Stopping Mininet - PASS (tick)
    • Skipping the rest of this case.

...

  • 11.1 Apply cell to environment - PASS (tick)
  • 11.2 Uninstalling Atomix - PASS (tick)
  • 11.3 Uninstalling ONOS package - PASS (tick)
  • 11.4 Installing Atomix - PASS (tick)
  • 11.5 Installing ONOS package - PASS (tick)
  • 11.6 Set up ONOS secure SSH - PASS (tick)
  • 11.7 Checking ONOS service - PASS (tick)
  • 11.8 Starting ONOS CLI sessions - PASS (tick)
  • 11.9 Checking ONOS nodes - PASS (tick)
  • 11.10 Checking ONOS applications - PASS (tick)
  • 11.11 Starting Mininet Topology - PASS (tick)
  • 11.12 Verify host IP address assignment in ONOS - PASS (tick)
  • 11.13 Verify IP address assignment from hosts - PASS (tick)
  • 11.14 Stopping Mininet - PASS (tick)
  • 11.15 Copying karaf logs - PASS (tick)

Case 12: DHCP v6 tests with 4 clients attached to switch directly and 1 server attached to switch indirectly (via gateway), with 3 ONOS instances - FAIL

  • 12.1 Apply cell to environment - PASS (tick)
  • 12.2 Uninstalling Atomix - PASS (tick)
  • 12.3 Uninstalling ONOS package - PASS (tick)
  • 12.4 Installing Atomix - PASS (tick)
  • 12.5 Installing ONOS package - PASS (tick)
  • 12.6 Set up ONOS secure SSH - FAIL (error)
    • Failed to secure ssh
  • 12.7 Checking ONOS service - PASS (tick)
  • 12.8 Starting ONOS CLI sessions - PASS (tick)
  • 12.9 Checking ONOS nodes - PASS (tick)
  • 12.10 Checking ONOS applications - PASS (tick)
  • 12.11 Starting Mininet Topology - PASS (tick)
  • 12.12 Verify host IP address assignment in ONOS - FAIL (error)
    • Verify ONOS host IP failed
  • 12.13 Stopping Mininet - PASS (tick)
    • Skipping the rest of this case.

Case 21: DHCP v4 tests with tagged hosts: 4 clients attached to switch directly and 1 server attached to switch directly, with 3 ONOS instances - FAIL

  • 21.1 Apply cell to environment - PASS (tick)
  • 21.2 Uninstalling Atomix - PASS (tick)
  • 21.3 Uninstalling ONOS package - PASS (tick)
  • 21.4 Installing Atomix - PASS (tick)
  • 21.5 Installing ONOS package - PASS (tick)
  • 21.6 Set up ONOS secure SSH - FAIL (error)
    • Failed to secure ssh
  • 21.7 Checking ONOS service - PASS (tick)
  • 21.8 Starting ONOS CLI sessions - PASS (tick)
  • 21.9 Checking ONOS nodes - PASS (tick)
  • 21.10 Checking ONOS applications - PASS (tick)
  • 21.11 Starting Mininet Topology - PASS (tick)
  • 21.12 Verify host IP address assignment in ONOS - PASS (tick)
  • 21.13 Verify IP address assignment from hosts - PASS (tick)
  • 21.14 Stopping Mininet - PASS (tick)
  • 21.15 Copying karaf logs - PASS (tick)

...

tests with 4 clients attached to switch directly and 1 server attached to switch indirectly (via gateway)

...

  • 22.1 Apply cell to environment - PASS (tick)
  • 22.2 Uninstalling Atomix - PASS (tick)
  • 22.3 Uninstalling ONOS package - PASS (tick)
  • 22.4 Installing Atomix - PASS (tick)
  • 22.5 Installing ONOS package - PASS (tick)
  • 22.6 Set up ONOS secure SSH - PASS (tick)
  • 22.7 Checking ONOS service - PASS (tick)
  • 22.8 Starting ONOS CLI sessions - PASS (tick)
  • 22.9 Checking ONOS nodes - PASS (tick)
  • 22.10 Checking ONOS applications - PASS (tick)
  • 22.11 Starting Mininet Topology - PASS (tick)
  • 22.12 Verify host IP address assignment in ONOS - PASS (tick)
  • 22.13 Verify IP address assignment from hosts - PASS (tick)
  • 22.14 Stopping Mininet - PASS (tick)
  • 22.15 Copying karaf logs - PASS (tick)

...

, with 3 ONOS instances - FAIL