Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: Published from Jenkins build: https://jenkins.onosproject.org/job/SR-pipeline-1.14/1115/

...

HTML
<img src="https://jenkins.onosproject.org/view/QA/job/postjob-Fabric3/lastSuccessfulBuild/artifact/SRDhcprelay_onos-1.14_20-builds_graph.jpg", alt="SRDhcprelay", style="width:525px;height:350px;border:0">

commit 0406d56598cae204e4cd946348d67ed81f18176f 4ec2c16489377b1699037bdcf5ca6c19e27b15cc (HEAD -] onos-1.14, origin/onos-1.14)
Author: pier Charles Chan [pier@opennetworkingrascov@gmail.orgcom]
AuthorDate: Tue Nov 27 1121:2333:50 33 2018 -+0800
Commit: Pier Luigi Ventre [pier@opennetworking.orgCharles Chan [rascov@gmail.com]
CommitDate: Fri Wed Dec 7 2019 15:0915:26 58 2018 +0000
Provides a separate executor to handle map events.
--
(cherry picked from commit 8f35163338b78556fdc8680efa7125b53e75212e)
-0800

Address StackOverflow by offloading cache listener to a separate thread

Case 1: DHCP v4 tests with 4 clients attached to switch directly and 1 server attached to switch directly, with 3 ONOS instances - PASS

...

  • 41.1 Apply cell to environment - PASS (tick)
  • 41.2 Uninstalling Atomix - PASS (tick)
  • 41.3 Uninstalling ONOS package - PASS (tick)
  • 41.4 Installing Atomix - PASS (tick)
  • 41.5 Installing ONOS package - PASS (tick)
  • 41.6 Set up ONOS secure SSH - PASS (tick)
  • 41.7 Checking ONOS service - PASS (tick)
  • 41.8 Starting ONOS CLI sessions - PASS (tick)
  • 41.9 Checking ONOS nodes - PASS (tick)
  • 41.10 Checking ONOS applications - PASS (tick)
  • 41.11 Starting Mininet Topology - PASS (tick)
  • 41.12 Verify host IP address assignment in ONOS - PASS (tick)
  • 41.13 Verify IP address assignment from hosts - PASS (tick)
  • 41.14 Stopping Mininet - PASS (tick)
  • 41.15 Copying karaf logs - PASS (tick)

Case 51: DHCP v6 tests with dual-homed hosts: 4 clients attached to switch directly and 1 server attached to switch directly, with 3 ONOS instances - FAIL

  • 51.1 Apply cell to environment - PASS (tick)
  • 51.2 Uninstalling Atomix - PASS (tick)
  • 51.3 Uninstalling ONOS package - PASS (tick)
  • 51.4 Installing Atomix - PASS (tick)
  • 51.5 Installing ONOS package - PASS (tick)
  • 51.6 Set up ONOS secure SSH - PASS (tick)
  • 51.7 Checking ONOS service - PASS (tick)
  • 51.8 Starting ONOS CLI sessions - PASS (tick)
  • 51.9 Checking ONOS nodes - PASS (tick)
  • 51.10 Checking ONOS applications - PASS (tick)
  • 51.11 Starting Mininet Topology - PASS (tick)
  • 51.12 Verify host IP address assignment in ONOS - FAIL (error)
    • Verify ONOS host IP failed
  • 51.13 Stopping Mininet - PASS (tick)
    • Skipping the rest of this case.

Case 61: DHCP v4 tests with dual-homed tagged hosts: 4 clients attached to switch directly and 1 server attached to switch directly, with 3 ONOS instances - PASS

  • 61.1 Apply cell to environment - PASS (tick)
  • 61.2 Uninstalling Atomix - PASS (tick)
  • 61.3 Uninstalling ONOS package - PASS (tick)
  • 61.4 Installing Atomix - PASS (tick)
  • 61.5 Installing ONOS package - PASS (tick)
  • 61.6 Set up ONOS secure SSH - PASS (tick)
  • 61.7 Checking ONOS service - PASS (tick)
  • 61.8 Starting ONOS CLI sessions - PASS (tick)
  • 61.9 Checking ONOS nodes - PASS (tick)
  • 61.10 Checking ONOS applications - PASS (tick)
  • 61.11 Starting Mininet Topology - PASS (tick)
  • 61.12 Verify host IP address assignment in ONOS - PASS (tick)
  • 61.13 Verify IP address assignment from hosts - PASS (tick)
  • 61.14 Stopping Mininet - PASS (tick)
  • 61.15 Copying karaf logs - PASS (tick)

Case 71: DHCP v6 tests with dual-homed tagged hosts: 4 clients attached to switch directly and 1 server attached to switch directly, with 3 ONOS instances - FAIL

  • 71.1 Apply cell to environment - PASS (tick)
  • 71.2 Uninstalling Atomix - PASS (tick)
  • 71.3 Uninstalling ONOS package - PASS (tick)
  • 71.4 Installing Atomix - PASS (tick)
  • 71.5 Installing ONOS package - PASS (tick)
  • 71.6 Set up ONOS secure SSH - PASS (tick)
  • 71.7 Checking ONOS service - PASS (tick)
  • 71.8 Starting ONOS CLI sessions - PASS (tick)
  • 71.9 Checking ONOS nodes - PASS (tick)
  • 71.10 Checking ONOS applications - PASS (tick)
  • 71.11 Starting Mininet Topology - PASS (tick)
  • 71.12 Verify host IP address assignment in ONOS - FAIL (error)
    • Verify ONOS host IP failed
  • 71.13 Stopping Mininet - PASS (tick)
    • Skipping the rest of this case.