Have questions? Stuck? Please check our FAQ for some common questions and answers.

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 246 Next »

SRRouting at 18 May 2021 21:10:36

SRRouting

commit a1acb22f34e1f70d4fe766a8de633d35abb6ee0e (HEAD -] onos-2.2, origin/onos-2.2)
Author: Jian Li [pyguni@gmail.com]
AuthorDate: Sun May 16 16:41:13 2021 +0900
Commit: Jian Li [pyguni@gmail.com]
CommitDate: Sun May 16 20:16:21 2021 +0900

Purge the logic of allocating and releasing IPs from kubevirt-cni

Case 1: Ping between all ipv4 hosts in the topology - PASS

  • 1.1 Constructing test variables - PASS (tick)
  • 1.2 Apply cell to environment - PASS (tick)
  • 1.3 Uninstalling Atomix - PASS (tick)
  • 1.4 Uninstalling ONOS package - PASS (tick)
  • 1.5 Creating ONOS package - PASS (tick)
  • 1.6 Installing Atomix - PASS (tick)
  • 1.7 Installing ONOS package - PASS (tick)
  • 1.8 Set up ONOS secure SSH - PASS (tick)
  • 1.9 Checking ONOS service - PASS (tick)
  • 1.10 Starting ONOS CLI sessions - PASS (tick)
  • 1.11 Checking ONOS nodes - PASS (tick)
  • 1.12 Checking ONOS applications - PASS (tick)
  • 1.13 Set logging levels - PASS (tick)
  • 1.14 Set ONOS configurations - PASS (tick)
  • 1.15 Starting Mininet Topology - PASS (tick)
  • 1.16 Check number of topology elements - PASS (tick)
  • 1.17 Verify reachability of connected internal IPv4 hosts - PASS (tick)
  • 1.18 Verify host IP address assignment in ONOS - PASS (tick)
  • 1.19 Verify IP address assignment from hosts - PASS (tick)
  • 1.20 Verify reachability of connected internal IPv4 hosts - PASS (tick)
  • 1.21 Stopping Mininet - PASS (tick)

Case 2: Ping between all ipv6 hosts in the topology - FAIL

  • 2.1 Apply cell to environment - PASS (tick)
  • 2.2 Uninstalling Atomix - PASS (tick)
  • 2.3 Uninstalling ONOS package - PASS (tick)
  • 2.4 Installing Atomix - PASS (tick)
  • 2.5 Installing ONOS package - PASS (tick)
  • 2.6 Set up ONOS secure SSH - PASS (tick)
  • 2.7 Checking ONOS service - PASS (tick)
  • 2.8 Starting ONOS CLI sessions - PASS (tick)
  • 2.9 Checking ONOS nodes - PASS (tick)
  • 2.10 Checking ONOS applications - PASS (tick)
  • 2.11 Set logging levels - PASS (tick)
  • 2.12 Set ONOS configurations - PASS (tick)
  • 2.13 Starting Mininet Topology - PASS (tick)
  • 2.14 Check number of topology elements - PASS (tick)
  • 2.15 Verify reachability of connected internal IPv6 hosts - FAIL (error)
    • Verify reachability of connected internal IPv6 hosts: Fail
  • 2.16 Stopping Mininet - PASS (tick)
    • Skipping the rest of this case.

Case 3: Ping between all ipv4 and ipv6 hosts in the topology - PASS

  • 3.1 Apply cell to environment - PASS (tick)
  • 3.2 Uninstalling Atomix - PASS (tick)
  • 3.3 Uninstalling ONOS package - PASS (tick)
  • 3.4 Installing Atomix - PASS (tick)
  • 3.5 Installing ONOS package - PASS (tick)
  • 3.6 Set up ONOS secure SSH - PASS (tick)
  • 3.7 Checking ONOS service - PASS (tick)
  • 3.8 Starting ONOS CLI sessions - PASS (tick)
  • 3.9 Checking ONOS nodes - PASS (tick)
  • 3.10 Checking ONOS applications - PASS (tick)
  • 3.11 Set logging levels - PASS (tick)
  • 3.12 Set ONOS configurations - PASS (tick)
  • 3.13 Starting Mininet Topology - PASS (tick)
  • 3.14 Check number of topology elements - PASS (tick)
  • 3.15 Verify reachability of connected internal IPv4 hosts - PASS (tick)
  • 3.16 Verify reachability of connected internal IPv6 hosts - PASS (tick)
  • 3.17 Verify host IP address assignment in ONOS - PASS (tick)
  • 3.18 Verify IP address assignment from hosts - PASS (tick)
  • 3.19 Verify reachability of connected internal IPv4 hosts - PASS (tick)
  • 3.20 Verify reachability of connected internal IPv6 hosts - PASS (tick)
  • 3.21 Stopping Mininet - PASS (tick)

Case 4: Ping between all ipv4 hosts in the topology and check connectivity to external ipv4 hosts - PASS

  • 4.1 Apply cell to environment - PASS (tick)
  • 4.2 Uninstalling Atomix - PASS (tick)
  • 4.3 Uninstalling ONOS package - PASS (tick)
  • 4.4 Installing Atomix - PASS (tick)
  • 4.5 Installing ONOS package - PASS (tick)
  • 4.6 Set up ONOS secure SSH - PASS (tick)
  • 4.7 Checking ONOS service - PASS (tick)
  • 4.8 Starting ONOS CLI sessions - PASS (tick)
  • 4.9 Checking ONOS nodes - PASS (tick)
  • 4.10 Checking ONOS applications - PASS (tick)
  • 4.11 Set logging levels - PASS (tick)
  • 4.12 Set ONOS configurations - PASS (tick)
  • 4.13 Starting Mininet Topology - PASS (tick)
  • 4.14 Check number of topology elements - PASS (tick)
  • 4.15 Verify reachability of connected internal IPv4 hosts - PASS (tick)
  • 4.16 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS (tick)
  • 4.17 Verify host IP address assignment in ONOS - PASS (tick)
  • 4.18 Verify IP address assignment from hosts - PASS (tick)
  • 4.19 Verify reachability of connected internal IPv4 hosts - PASS (tick)
  • 4.20 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS (tick)
  • 4.21 Stopping Mininet - PASS (tick)

Case 5: Ping between all ipv6 hosts in the topology and check connectivity to external ipv6 hosts - PASS

  • 5.1 Apply cell to environment - PASS (tick)
  • 5.2 Uninstalling Atomix - PASS (tick)
  • 5.3 Uninstalling ONOS package - PASS (tick)
  • 5.4 Installing Atomix - PASS (tick)
  • 5.5 Installing ONOS package - PASS (tick)
  • 5.6 Set up ONOS secure SSH - PASS (tick)
  • 5.7 Checking ONOS service - PASS (tick)
  • 5.8 Starting ONOS CLI sessions - PASS (tick)
  • 5.9 Checking ONOS nodes - PASS (tick)
  • 5.10 Checking ONOS applications - PASS (tick)
  • 5.11 Set logging levels - PASS (tick)
  • 5.12 Set ONOS configurations - PASS (tick)
  • 5.13 Starting Mininet Topology - PASS (tick)
  • 5.14 Check number of topology elements - PASS (tick)
  • 5.15 Verify reachability of connected internal IPv6 hosts - PASS (tick)
  • 5.16 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS (tick)
  • 5.17 Verify host IP address assignment in ONOS - PASS (tick)
  • 5.18 Verify IP address assignment from hosts - PASS (tick)
  • 5.19 Verify reachability of connected internal IPv6 hosts - PASS (tick)
  • 5.20 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS (tick)
  • 5.21 Stopping Mininet - PASS (tick)

Case 6: Ping between all ipv4 and ipv6 hosts in the topology and check connectivity to external hosts - PASS

  • 6.1 Apply cell to environment - PASS (tick)
  • 6.2 Uninstalling Atomix - PASS (tick)
  • 6.3 Uninstalling ONOS package - PASS (tick)
  • 6.4 Installing Atomix - PASS (tick)
  • 6.5 Installing ONOS package - PASS (tick)
  • 6.6 Set up ONOS secure SSH - PASS (tick)
  • 6.7 Checking ONOS service - PASS (tick)
  • 6.8 Starting ONOS CLI sessions - PASS (tick)
  • 6.9 Checking ONOS nodes - PASS (tick)
  • 6.10 Checking ONOS applications - PASS (tick)
  • 6.11 Set logging levels - PASS (tick)
  • 6.12 Set ONOS configurations - PASS (tick)
  • 6.13 Starting Mininet Topology - PASS (tick)
  • 6.14 Check number of topology elements - PASS (tick)
  • 6.15 Verify reachability of connected internal IPv4 hosts - PASS (tick)
  • 6.16 Verify reachability of connected internal IPv6 hosts - PASS (tick)
  • 6.17 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS (tick)
  • 6.18 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS (tick)
  • 6.19 Verify host IP address assignment in ONOS - PASS (tick)
  • 6.20 Verify IP address assignment from hosts - PASS (tick)
  • 6.21 Verify reachability of connected internal IPv4 hosts - PASS (tick)
  • 6.22 Verify reachability of connected internal IPv6 hosts - PASS (tick)
  • 6.23 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - PASS (tick)
  • 6.24 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - PASS (tick)
  • 6.25 Stopping Mininet - PASS (tick)

Case 7: Ping between from ipv4 hosts to external host configured with route-add command - FAIL

  • 7.1 Apply cell to environment - PASS (tick)
  • 7.2 Uninstalling Atomix - PASS (tick)
  • 7.3 Uninstalling ONOS package - PASS (tick)
  • 7.4 Installing Atomix - PASS (tick)
  • 7.5 Installing ONOS package - PASS (tick)
  • 7.6 Set up ONOS secure SSH - PASS (tick)
  • 7.7 Checking ONOS service - PASS (tick)
  • 7.8 Starting ONOS CLI sessions - PASS (tick)
  • 7.9 Checking ONOS nodes - PASS (tick)
  • 7.10 Checking ONOS applications - PASS (tick)
  • 7.11 Set logging levels - PASS (tick)
  • 7.12 Set ONOS configurations - PASS (tick)
  • 7.13 Starting Mininet Topology - PASS (tick)
  • 7.14 Check number of topology elements - PASS (tick)
  • 7.15 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - FAIL (error)
    • Verify reachability from connected internal IPv4 hosts to external IPv4 hosts: Fail
  • 7.16 Stopping Mininet - PASS (tick)
    • Skipping the rest of this case.

Case 8: Ping between from ipv6 hosts to external host configured with route-add command - FAIL

  • 8.1 Apply cell to environment - PASS (tick)
  • 8.2 Uninstalling Atomix - PASS (tick)
  • 8.3 Uninstalling ONOS package - PASS (tick)
  • 8.4 Installing Atomix - PASS (tick)
  • 8.5 Installing ONOS package - PASS (tick)
  • 8.6 Set up ONOS secure SSH - PASS (tick)
  • 8.7 Checking ONOS service - PASS (tick)
  • 8.8 Starting ONOS CLI sessions - PASS (tick)
  • 8.9 Checking ONOS nodes - PASS (tick)
  • 8.10 Checking ONOS applications - PASS (tick)
  • 8.11 Set logging levels - PASS (tick)
  • 8.12 Set ONOS configurations - PASS (tick)
  • 8.13 Starting Mininet Topology - PASS (tick)
  • 8.14 Check number of topology elements - PASS (tick)
  • 8.15 Verify reachability from connected internal IPv6 hosts to external IPv6 hosts - FAIL (error)
    • Verify reachability from connected internal IPv6 hosts to external IPv6 hosts: Fail
  • 8.16 Stopping Mininet - PASS (tick)
    • Skipping the rest of this case.

Case 9: Ping between from ipv4 and ipv6 hosts to external host configured with route-add command - FAIL

  • 9.1 Apply cell to environment - PASS (tick)
  • 9.2 Uninstalling Atomix - PASS (tick)
  • 9.3 Uninstalling ONOS package - PASS (tick)
  • 9.4 Installing Atomix - PASS (tick)
  • 9.5 Installing ONOS package - PASS (tick)
  • 9.6 Set up ONOS secure SSH - PASS (tick)
  • 9.7 Checking ONOS service - PASS (tick)
  • 9.8 Starting ONOS CLI sessions - PASS (tick)
  • 9.9 Checking ONOS nodes - PASS (tick)
  • 9.10 Checking ONOS applications - PASS (tick)
  • 9.11 Set logging levels - PASS (tick)
  • 9.12 Set ONOS configurations - PASS (tick)
  • 9.13 Starting Mininet Topology - PASS (tick)
  • 9.14 Check number of topology elements - PASS (tick)
  • 9.15 Verify reachability from connected internal IPv4 hosts to external IPv4 hosts - FAIL (error)
    • Verify reachability from connected internal IPv4 hosts to external IPv4 hosts: Fail
  • 9.16 Stopping Mininet - PASS (tick)
    • Skipping the rest of this case.

Case 101: Test link failures with IPv4 hosts - FAIL

  • 101.1 Apply cell to environment - PASS (tick)
  • 101.2 Uninstalling Atomix - PASS (tick)
  • 101.3 Uninstalling ONOS package - PASS (tick)
  • 101.4 Installing Atomix - PASS (tick)
  • 101.5 Installing ONOS package - PASS (tick)
  • 101.6 Set up ONOS secure SSH - PASS (tick)
  • 101.7 Checking ONOS service - PASS (tick)
  • 101.8 Starting ONOS CLI sessions - PASS (tick)
  • 101.9 Checking ONOS nodes - PASS (tick)
  • 101.10 Checking ONOS applications - PASS (tick)
  • 101.11 Set logging levels - PASS (tick)
  • 101.12 Set ONOS configurations - PASS (tick)
  • 101.13 Starting Mininet Topology - PASS (tick)
  • 101.14 Check number of topology elements - PASS (tick)
  • 101.15 Verify reachability of connected internal IPv4 hosts - FAIL (error)
    • Verify reachability of connected internal IPv4 hosts: Fail
  • 101.16 Stopping Mininet - PASS (tick)
    • Skipping the rest of this case.

Case 102: Test link failures with IPv6 hosts - FAIL

  • 102.1 Apply cell to environment - PASS (tick)
  • 102.2 Uninstalling Atomix - PASS (tick)
  • 102.3 Uninstalling ONOS package - PASS (tick)
  • 102.4 Installing Atomix - PASS (tick)
  • 102.5 Installing ONOS package - PASS (tick)
  • 102.6 Set up ONOS secure SSH - PASS (tick)
  • 102.7 Checking ONOS service - PASS (tick)
  • 102.8 Starting ONOS CLI sessions - PASS (tick)
  • 102.9 Checking ONOS nodes - PASS (tick)
  • 102.10 Checking ONOS applications - PASS (tick)
  • 102.11 Set logging levels - PASS (tick)
  • 102.12 Set ONOS configurations - PASS (tick)
  • 102.13 Starting Mininet Topology - PASS (tick)
  • 102.14 Check number of topology elements - PASS (tick)
  • 102.15 Verify reachability of connected internal IPv6 hosts - PASS (tick)
  • 102.16 Verify host IP address assignment in ONOS - PASS (tick)
  • 102.17 Verify IP address assignment from hosts - PASS (tick)
  • 102.18 Verify reachability of connected internal IPv6 hosts - PASS (tick)
  • 102.19 Killing a batch of links [['spine103', 'spine101'], ['leaf2', 'spine101'], ['leaf3', 'spine101'], ['leaf4', 'spine101'], ['leaf5', 'spine101']] - FAIL (error)
    • Link batch down failed
  • 102.20 Check number of topology elements - FAIL (error)
    • Unexpected number of links, switches, and/or controllers: The number of links, switches, nodes, and SCCs does not match what was expected
    • ONOS sees 10 devices (10 expected) and 30 links (48 expected) and 3 controllers (3 expected) and 2 SCCs (1 expected)
  • 102.21 Verify reachability of connected internal IPv6 hosts - PASS (tick)
  • 102.22 Verify host IP address assignment in ONOS - PASS (tick)
  • 102.23 Verify IP address assignment from hosts - PASS (tick)
  • 102.24 Verify reachability of connected internal IPv6 hosts - PASS (tick)
  • 102.25 Restoring a batch of links [['spine103', 'spine101'], ['leaf2', 'spine101'], ['leaf3', 'spine101'], ['leaf4', 'spine101'], ['leaf5', 'spine101']] - PASS (tick)
  • 102.26 Check number of topology elements - PASS (tick)
  • 102.27 Verify reachability of connected internal IPv6 hosts - PASS (tick)
  • 102.28 Verify host IP address assignment in ONOS - PASS (tick)
  • 102.29 Verify IP address assignment from hosts - PASS (tick)
  • 102.30 Verify reachability of connected internal IPv6 hosts - PASS (tick)
  • 102.31 Killing a batch of links [['spine104', 'spine102'], ['leaf2', 'spine102'], ['leaf3', 'spine102'], ['leaf4', 'spine102'], ['leaf5', 'spine102']] - FAIL (error)
    • Link batch down failed
  • 102.32 Check number of topology elements - FAIL (error)
    • Unexpected number of links, switches, and/or controllers: The number of links, switches, nodes, and SCCs does not match what was expected
    • ONOS sees 10 devices (10 expected) and 30 links (48 expected) and 3 controllers (3 expected) and 2 SCCs (1 expected)
  • 102.33 Verify reachability of connected internal IPv6 hosts - PASS (tick)
  • 102.34 Verify host IP address assignment in ONOS - PASS (tick)
  • 102.35 Verify IP address assignment from hosts - PASS (tick)
  • 102.36 Verify reachability of connected internal IPv6 hosts - PASS (tick)
  • 102.37 Restoring a batch of links [['spine104', 'spine102'], ['leaf2', 'spine102'], ['leaf3', 'spine102'], ['leaf4', 'spine102'], ['leaf5', 'spine102']] - PASS (tick)
  • 102.38 Check number of topology elements - PASS (tick)
  • 102.39 Verify reachability of connected internal IPv6 hosts - PASS (tick)
  • 102.40 Verify host IP address assignment in ONOS - PASS (tick)
  • 102.41 Verify IP address assignment from hosts - PASS (tick)
  • 102.42 Verify reachability of connected internal IPv6 hosts - PASS (tick)
  • 102.43 Stopping Mininet - PASS (tick)

Case 103: Test link failures with IPv4 and IPv6 hosts - FAIL

  • 103.1 Apply cell to environment - PASS (tick)
  • 103.2 Uninstalling Atomix - PASS (tick)
  • 103.3 Uninstalling ONOS package - PASS (tick)
  • 103.4 Installing Atomix - PASS (tick)
  • 103.5 Installing ONOS package - PASS (tick)
  • 103.6 Set up ONOS secure SSH - PASS (tick)
  • 103.7 Checking ONOS service - PASS (tick)
  • 103.8 Starting ONOS CLI sessions - PASS (tick)
  • 103.9 Checking ONOS nodes - PASS (tick)
  • 103.10 Checking ONOS applications - PASS (tick)
  • 103.11 Set logging levels - PASS (tick)
  • 103.12 Set ONOS configurations - PASS (tick)
  • 103.13 Starting Mininet Topology - PASS (tick)
  • 103.14 Check number of topology elements - PASS (tick)
  • 103.15 Verify reachability of connected internal IPv4 hosts - FAIL (error)
    • Verify reachability of connected internal IPv4 hosts: Fail
  • 103.16 Stopping Mininet - PASS (tick)
    • Skipping the rest of this case.

Case 104: Test link failures with IPv4 hosts including external hosts - FAIL

  • No labels