SRDhcprelay at 06 Sep 2018 11:11:11

SRDhcprelay

commit 9e4972c5d881f604c36d6e36a1b4615e1f162f66 (HEAD -] master, origin/master, origin/HEAD)
Author: Carmelo Cascone [carmelo@opennetworking.org]
AuthorDate: Thu Aug 30 00:29:16 2018 -0700
Commit: Carmelo Cascone [carmelo@opennetworking.org]
CommitDate: Thu Sep 6 03:08:09 2018 +0000

Refactor P4Runtime subsystem to implement async connection procedure

Case 1: DHCP v4 tests with 4 clients attached to switch directly and 1 server attached to switch directly, with 3 ONOS instances - PASS

  • 1.1 Constructing test variables - PASS (tick)
  • 1.2 Apply cell to environment - PASS (tick)
  • 1.3 Uninstalling Atomix - PASS (tick)
  • 1.4 Uninstalling ONOS package - PASS (tick)
  • 1.5 Creating ONOS package - PASS (tick)
  • 1.6 Installing Atomix - PASS (tick)
  • 1.7 Installing ONOS package - PASS (tick)
  • 1.8 Set up ONOS secure SSH - PASS (tick)
  • 1.9 Checking ONOS service - PASS (tick)
  • 1.10 Starting ONOS CLI sessions - PASS (tick)
  • 1.11 Checking ONOS nodes - PASS (tick)
  • 1.12 Checking ONOS applications - PASS (tick)
  • 1.13 Starting Mininet Topology - PASS (tick)
  • 1.14 Verify host IP address assignment in ONOS - PASS (tick)
  • 1.15 Verify IP address assignment from hosts - PASS (tick)
  • 1.16 Stopping Mininet - PASS (tick)
  • 1.17 Copying karaf logs - PASS (tick)

Case 2: DHCP v4 tests with 4 clients attached to switch directly and 1 server attached to switch indirectly (via gateway), with 3 ONOS instances - PASS

  • 2.1 Apply cell to environment - PASS (tick)
  • 2.2 Uninstalling Atomix - PASS (tick)
  • 2.3 Uninstalling ONOS package - PASS (tick)
  • 2.4 Installing Atomix - PASS (tick)
  • 2.5 Installing ONOS package - PASS (tick)
  • 2.6 Set up ONOS secure SSH - PASS (tick)
  • 2.7 Checking ONOS service - PASS (tick)
  • 2.8 Starting ONOS CLI sessions - PASS (tick)
  • 2.9 Checking ONOS nodes - PASS (tick)
  • 2.10 Checking ONOS applications - PASS (tick)
  • 2.11 Starting Mininet Topology - PASS (tick)
  • 2.12 Verify host IP address assignment in ONOS - PASS (tick)
  • 2.13 Verify IP address assignment from hosts - PASS (tick)
  • 2.14 Stopping Mininet - PASS (tick)
  • 2.15 Copying karaf logs - PASS (tick)

Case 11: DHCP v6 tests with 4 clients attached to switch directly and 1 server attached to switch directly, with 3 ONOS instances - PASS

  • 11.1 Apply cell to environment - PASS (tick)
  • 11.2 Uninstalling Atomix - PASS (tick)
  • 11.3 Uninstalling ONOS package - PASS (tick)
  • 11.4 Installing Atomix - PASS (tick)
  • 11.5 Installing ONOS package - PASS (tick)
  • 11.6 Set up ONOS secure SSH - PASS (tick)
  • 11.7 Checking ONOS service - PASS (tick)
  • 11.8 Starting ONOS CLI sessions - PASS (tick)
  • 11.9 Checking ONOS nodes - PASS (tick)
  • 11.10 Checking ONOS applications - PASS (tick)
  • 11.11 Starting Mininet Topology - PASS (tick)
  • 11.12 Verify host IP address assignment in ONOS - PASS (tick)
  • 11.13 Verify IP address assignment from hosts - PASS (tick)
  • 11.14 Stopping Mininet - PASS (tick)
  • 11.15 Copying karaf logs - PASS (tick)

Case 12: DHCP v6 tests with 4 clients attached to switch directly and 1 server attached to switch indirectly (via gateway), with 3 ONOS instances - FAIL

  • 12.1 Apply cell to environment - PASS (tick)
  • 12.2 Uninstalling Atomix - PASS (tick)
  • 12.3 Uninstalling ONOS package - PASS (tick)
  • 12.4 Installing Atomix - PASS (tick)
  • 12.5 Installing ONOS package - PASS (tick)
  • 12.6 Set up ONOS secure SSH - PASS (tick)
  • 12.7 Checking ONOS service - PASS (tick)
  • 12.8 Starting ONOS CLI sessions - PASS (tick)
  • 12.9 Checking ONOS nodes - PASS (tick)
  • 12.10 Checking ONOS applications - PASS (tick)
  • 12.11 Starting Mininet Topology - PASS (tick)
  • 12.12 Verify host IP address assignment in ONOS - FAIL (error)
    • Verify ONOS host IP failed
  • 12.13 Stopping Mininet - PASS (tick)
    • Skipping the rest of this case.

Case 21: DHCP v4 tests with tagged hosts: 4 clients attached to switch directly and 1 server attached to switch directly, with 3 ONOS instances - FAIL

  • 21.1 Apply cell to environment - PASS (tick)
  • 21.2 Uninstalling Atomix - PASS (tick)
  • 21.3 Uninstalling ONOS package - PASS (tick)
  • 21.4 Installing Atomix - PASS (tick)
  • 21.5 Installing ONOS package - PASS (tick)
  • 21.6 Set up ONOS secure SSH - PASS (tick)
  • 21.7 Checking ONOS service - PASS (tick)
  • 21.8 Starting ONOS CLI sessions - PASS (tick)
  • 21.9 Checking ONOS nodes - PASS (tick)
  • 21.10 Checking ONOS applications - PASS (tick)
  • 21.11 Starting Mininet Topology - PASS (tick)
  • 21.12 Verify host IP address assignment in ONOS - FAIL (error)
    • Verify ONOS host IP failed
  • 21.13 Stopping Mininet - PASS (tick)
    • Skipping the rest of this case.

Case 22: DHCP v4 tests with 4 clients attached to switch directly and 1 server attached to switch indirectly (via gateway), with 3 ONOS instances - PASS

  • 22.1 Apply cell to environment - PASS (tick)
  • 22.2 Uninstalling Atomix - PASS (tick)
  • 22.3 Uninstalling ONOS package - PASS (tick)
  • 22.4 Installing Atomix - PASS (tick)
  • 22.5 Installing ONOS package - PASS (tick)
  • 22.6 Set up ONOS secure SSH - PASS (tick)
  • 22.7 Checking ONOS service - PASS (tick)
  • 22.8 Starting ONOS CLI sessions - PASS (tick)
  • 22.9 Checking ONOS nodes - PASS (tick)
  • 22.10 Checking ONOS applications - PASS (tick)
  • 22.11 Starting Mininet Topology - PASS (tick)
  • 22.12 Verify host IP address assignment in ONOS - PASS (tick)
  • 22.13 Verify IP address assignment from hosts - PASS (tick)
  • 22.14 Stopping Mininet - PASS (tick)
  • 22.15 Copying karaf logs - PASS (tick)

Case 31: DHCP v6 tests with tagged hosts: 4 clients attached to switch directly and 1 server attached to switch directly, with 3 ONOS instances - FAIL

  • 31.1 Apply cell to environment - PASS (tick)
  • 31.2 Uninstalling Atomix - PASS (tick)
  • 31.3 Uninstalling ONOS package - PASS (tick)
  • 31.4 Installing Atomix - PASS (tick)
  • 31.5 Installing ONOS package - PASS (tick)
  • 31.6 Set up ONOS secure SSH - PASS (tick)
  • 31.7 Checking ONOS service - PASS (tick)
  • 31.8 Starting ONOS CLI sessions - PASS (tick)
  • 31.9 Checking ONOS nodes - PASS (tick)
  • 31.10 Checking ONOS applications - PASS (tick)
  • 31.11 Starting Mininet Topology - PASS (tick)
  • 31.12 Verify host IP address assignment in ONOS - FAIL (error)
    • Verify ONOS host IP failed
  • 31.13 Stopping Mininet - PASS (tick)
    • Skipping the rest of this case.

Case 41: DHCP v4 tests with dual-homed hosts: 4 clients attached to switch directly and 1 server attached to switch directly, with 3 ONOS instances - PASS

  • 41.1 Apply cell to environment - PASS (tick)
  • 41.2 Uninstalling Atomix - PASS (tick)
  • 41.3 Uninstalling ONOS package - PASS (tick)
  • 41.4 Installing Atomix - PASS (tick)
  • 41.5 Installing ONOS package - PASS (tick)
  • 41.6 Set up ONOS secure SSH - PASS (tick)
  • 41.7 Checking ONOS service - PASS (tick)
  • 41.8 Starting ONOS CLI sessions - PASS (tick)
  • 41.9 Checking ONOS nodes - PASS (tick)
  • 41.10 Checking ONOS applications - PASS (tick)
  • 41.11 Starting Mininet Topology - PASS (tick)
  • 41.12 Verify host IP address assignment in ONOS - PASS (tick)
  • 41.13 Verify IP address assignment from hosts - PASS (tick)
  • 41.14 Stopping Mininet - PASS (tick)
  • 41.15 Copying karaf logs - PASS (tick)

Case 51: DHCP v6 tests with dual-homed hosts: 4 clients attached to switch directly and 1 server attached to switch directly, with 3 ONOS instances - FAIL

  • 51.1 Apply cell to environment - PASS (tick)
  • 51.2 Uninstalling Atomix - PASS (tick)
  • 51.3 Uninstalling ONOS package - PASS (tick)
  • 51.4 Installing Atomix - PASS (tick)
  • 51.5 Installing ONOS package - PASS (tick)
  • 51.6 Set up ONOS secure SSH - PASS (tick)
  • 51.7 Checking ONOS service - PASS (tick)
  • 51.8 Starting ONOS CLI sessions - PASS (tick)
  • 51.9 Checking ONOS nodes - PASS (tick)
  • 51.10 Checking ONOS applications - PASS (tick)
  • 51.11 Starting Mininet Topology - PASS (tick)
  • 51.12 Verify host IP address assignment in ONOS - FAIL (error)
    • Verify ONOS host IP failed
  • 51.13 Stopping Mininet - PASS (tick)
    • Skipping the rest of this case.

Case 61: DHCP v4 tests with dual-homed tagged hosts: 4 clients attached to switch directly and 1 server attached to switch directly, with 3 ONOS instances - PASS

  • 61.1 Apply cell to environment - PASS (tick)
  • 61.2 Uninstalling Atomix - PASS (tick)
  • 61.3 Uninstalling ONOS package - PASS (tick)
  • 61.4 Installing Atomix - PASS (tick)
  • 61.5 Installing ONOS package - PASS (tick)
  • 61.6 Set up ONOS secure SSH - PASS (tick)
  • 61.7 Checking ONOS service - PASS (tick)
  • 61.8 Starting ONOS CLI sessions - PASS (tick)
  • 61.9 Checking ONOS nodes - PASS (tick)
  • 61.10 Checking ONOS applications - PASS (tick)
  • 61.11 Starting Mininet Topology - PASS (tick)
  • 61.12 Verify host IP address assignment in ONOS - PASS (tick)
  • 61.13 Verify IP address assignment from hosts - PASS (tick)
  • 61.14 Stopping Mininet - PASS (tick)
  • 61.15 Copying karaf logs - PASS (tick)

Case 71: DHCP v6 tests with dual-homed tagged hosts: 4 clients attached to switch directly and 1 server attached to switch directly, with 3 ONOS instances - FAIL

  • 71.1 Apply cell to environment - PASS (tick)
  • 71.2 Uninstalling Atomix - PASS (tick)
  • 71.3 Uninstalling ONOS package - PASS (tick)
  • 71.4 Installing Atomix - PASS (tick)
  • 71.5 Installing ONOS package - PASS (tick)
  • 71.6 Set up ONOS secure SSH - PASS (tick)
  • 71.7 Checking ONOS service - PASS (tick)
  • 71.8 Starting ONOS CLI sessions - PASS (tick)
  • 71.9 Checking ONOS nodes - PASS (tick)
  • 71.10 Checking ONOS applications - PASS (tick)
  • 71.11 Starting Mininet Topology - PASS (tick)
  • 71.12 Verify host IP address assignment in ONOS - FAIL (error)
    • Verify ONOS host IP failed
  • 71.13 Stopping Mininet - PASS (tick)
    • Skipping the rest of this case.