Jenkins test result for 16:48 on Mar 16, 2015.Test MultiProd
************************************
Result summary for Testcase1
This testcase is testing setting up test environment
__________________________________
commit f9f2cbb2c97f1b7ed6d4662fa2dd7aac1c77fa82 (HEAD, origin/master, origin/HEAD, master)
Author: Jonathan Hart [jono@onlab.us]
AuthorDate: Thu Mar 12 17:44:03 2015 -0700
Commit: Ali "The Bomb" Al-Shabibi [ali@onlab.us]
CommitDate: Mon Mar 16 18:31:27 2015 +0000
WIP: Turn off group deletes for now as they're not needed for deployment
Installing ONOS package successful
ONOS instances are up and ready
Result: Pass
Result summary for Testcase4
This testcase is testing the assignment of all the switches to all controllers and discovering the hosts in reactive mode
__________________________________
Controller assignment successfull
Pingall Test in reactive mode to discover the hosts successful
Result: Pass
Result summary for Testcase10
This testcase uninstalls the reactive forwarding app
__________________________________
Result: Pass
Result summary for Testcase5
This testcase is testing if all ONOS nodes are in topologyi sync with mininet and its peer ONOS nodes
__________________________________
Topology Check Test with mininetand ONOS instances successful
Result: Pass
Result summary for Testcase6
This testcase is testing the addition of host intents and then doing pingall
__________________________________
Host intents have been installed correctly
Result: Pass
Result summary for Testcase7
This testscase is killing a link to ensure that link discovery is consistent
__________________________________
Link Down discovered properly
Link up discovered properly
Result: Pass
Result summary for Testcase8
This testcase removes any previously added intents
__________________________________
Host intents have been withdrawn correctly
Intent removal successful
Result: Pass
Result summary for Testcase6
This testcase is testing the addition of host intents and then doing pingall
__________________________________
Host intents have been installed correctly
Result: Pass
Result summary for Testcase8
This testcase removes any previously added intents
__________________________________
Host intents have been withdrawn correctly
Intent removal successful
Result: Pass
Result summary for Testcase9
This testcase adds point intents and then does pingall
__________________________________
Ping between h8 and h18 failed. Making attempt number 2 in 2 seconds
Ping between h8 and h18 failed. Making attempt number 3 in 2 seconds
Ping between h8 and h18 failed. Making attempt number 4 in 2 seconds
Ping between h8 and h18 failed. Making attempt number 5 in 2 seconds
All ping attempts between h8 and h18have failed
Ping all test after Point intents addition failed. Cleaning up
Ping all test after Point intents addition failed
Result: Failed
Result summary for Testcase8
This testcase removes any previously added intents
__________________________________
Host intents have been withdrawn correctly
Intent removal successful
Result: Pass
Result summary for Testcase31
This test case adds point intent related to SDN-IP matching on ICMP
Ping all test after Point intents related to SDN-IP matching on ICMP successful
Point intent related to SDN-IP matching on ICMP and ping test failed
Result: Failed
Result summary for Testcase32
This test case adds point intent related to SDN-IP matching on TCP
Point intent related to SDN-IP matching on TCP install failed
iperf test successful
Result: Pass
Result summary for Testcase8
This testcase removes any previously added intents
__________________________________
Host intents have been withdrawn correctly
Intent removal successful
Result: Pass
Result summary for Testcase33
This test case adds multipoint to singlepoint intent related to SDN-IP matching on destination ip and rewrite mac address action
Ping all successful
Result: Pass
Result summary for Testcase8
This testcase removes any previously added intents
__________________________________
Host intents have been withdrawn correctly
Intent removal successful
Result: Pass