FUNCintent at 27 Jul 2015 23:19:11
commit 629b99ed41d4d8f3bb273811833b84b3cb0907fe (HEAD, origin/master, origin/HEAD, master)
Author: Simon Hunt [simon@onlab.us]
AuthorDate: Mon Jul 27 17:38:33 2015 -0700
Commit: Simon Hunt [simon@onlab.us]
CommitDate: Mon Jul 27 17:38:44 2015 -0700
ONOS-1479 - GUI Topology Overlay Work - (WIP)
Case 1: Constructing test variables and building ONOS package - PASS
This test case is mainly for loading from params file, and pull and build the latest ONOS package
- 1.1 Constructing test variables - PASS
Case 2: Starting up 1 node(s) ONOS cluster - FAIL
Set up ONOS with 1 node(s) ONOS cluster
- 2.1 Apply cell to environment - PASS
- 2.2 Creating ONOS package - PASS
- 2.3 Uninstalling ONOS package - PASS
- 2.4 Installing ONOS package - PASS
- 2.5 Starting ONOS service - FAIL
- ONOS service did not start properly
- 2.6 Start ONOS cli - FAIL
- Failed to start ONOS cli
Case 10: Start Mininet topology with OF 1.0 switches - PASS
Start mininet topology with OF 1.0 switches to test intents, exits out if topology did not start correctly
- 10.1 Starting Mininet topology with OF 1.0 switches - PASS
Case 12: Assign switches to controllers - PASS
Assign OF 1.0 switches to ONOS nodes
- 12.1 Assigning switches to controllers - PASS