Optical Functionality Test Suite

Purpose 

This test ensures the functionality of optical application.

Test Overview 

This test uses a mininet optical topology included with the test files.  It has 2 hosts, 2 packet switches and 3 optical switches.

Test Strategy

The test heavily depends on correct loading of the optical topology.  The correct configuration for 

Test assumption

  • A test bench that has onos package deployed

  • Requires at least a single node cluster

  • Mininet topology included in the test dependency folder should run without errors

  • Stable ONOS build ( v1.3 and up )

  • LINC-OE installed

 
Test CasesPassing Criteria
Compare ONOS and Mininet Topologies
  • Topologies seen in Mininet and ONOS should match eachother
  • Same number of Hosts, Switches, and Links
Add and test bidirectional point intents
  • Intents can be installed between network nodes
  • Connectivity between hosts when intents are installed
  • Intent state is in INSTALLED state for each active instances
  • All devices that are being used are in ACTIVE state
  • Each active device is assigned to one master controller
  • Network topology from Mininet is equivalent to ONOS view for each active instances
  • Flows should be in its appropriate state before and after an event such as intent installation, rerouting flows etc.
  • System state is consistent to all active ONOS instance
  • Every match action given when adding intents should correctly stored in each of intents status
  • Network nodes ( switch and host ) information are consistent such as MAC, IPs, IDs, Ports.
  • Completely remove or purge all intents that have been installed
Add and test bidirectional host intents